Alderon Resource Corp. (TSX VENTURE: ADV)(OTCQX: ALDFF) ("Alderon") is pleased to announce assay results from the ongoing drill program on the Kamistiatusset ("Kami") Iron Ore Project in western Labrador. A total of 20,520 meters (m), representing sixty drill holes completed or in progress, have been drilled on the Kami Project to date, with results received for the first 21 holes. Highlights from recently received holes include:

----------------------------------------------------------------------------
Drill Hole        From (meters)    To (meters) Length (meters)  Total Iron %
----------------------------------------------------------------------------
K-10-42                   86.9          370.0           283.1           31.4
----------------------------------------------------------------------------
      including          166.0          292.0           126.0           33.9
----------------------------------------------------------------------------

----------------------------------------------------------------------------
K-10-43                   10.5          173.0           162.5           32.7
----------------------------------------------------------------------------
      including           86.7          173.0            86.3           35.4
----------------------------------------------------------------------------

----------------------------------------------------------------------------
K-10-44                   87.0          140.6            53.6           30.4
----------------------------------------------------------------------------

----------------------------------------------------------------------------
K-10-46                   13.5          704.0           690.5           28.2
----------------------------------------------------------------------------
      including           13.5          189.4           175.9           29.7
----------------------------------------------------------------------------
            and          281.0          490.6           209.6           29.9
----------------------------------------------------------------------------

----------------------------------------------------------------------------
K-10-47                   57.6          112.7            55.1           28.0
----------------------------------------------------------------------------
                         253.8          603.0           349.2           27.2
----------------------------------------------------------------------------
      including          253.8          318.9            65.1           30.4
----------------------------------------------------------------------------

"These results continue to demonstrate the consistency of the depth and width of the Rose Lake Zone as we progress southwest," says Matt Simpson, Chief Operating Officer of Alderon.

All drill holes to date have tested the north eastern half of the Rose Lake Zone. Complete assay highlights with drill plan maps and sections are posted on the Alderon website at: http://www.alderonmining.com/projects/kami/

True widths of the reported intercepts vary depending on the angle of the individual drill holes and are estimated to be between 15% and 53% of the core interval as reported. Samples were prepared from sawn NQ-sized half-core sections on site in Labrador. Split drill core samples are then sent to SGS Mineral Services in Lakefield, Ontario for analyses. Total iron analysis is performed using X-ray fluorescence (XRF) and the magnetic component is determined by Satmagan magnetic analysis. Standards, blanks, and duplicate assays are included at regular intervals in each sample batch submitted from the field as part of an ongoing Quality Assurance/Quality Control program.

About Alderon

Alderon is a leading iron ore exploration and development company in Canada. The Kami Project is located within an existing iron ore district and is surrounded by producing iron ore mines. The Alderon team is comprised of skilled professionals with significant iron ore expertise to advance Kami towards production.

Alderon's exploration work on the Kami Property is supervised by Edward Lyons, P.Geo., the Chief Geologist for Alderon and a Qualified Person as defined by NI 43-101. Mr. Lyons has verified that the assay results presented above have been accurately summarized from the official assay certificates provided to Alderon.

For more information on Alderon, please visit our website at www.alderonmining.com.

ALDERON RESOURCE CORP.

On behalf of the Board

Mark J Morabito, President & CEO

This news release may contain forward-looking statements. These statements are based on current expectations and assumptions that are subject to risks and uncertainties. Actual results could differ materially because of factors discussed in the management discussion and analysis section of our interim and most recent annual financial statement or other reports and filings with the TSX Venture Exchange and applicable Canadian securities regulations. We do not assume any obligation to update any forward-looking statements.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Contacts: Alderon Resource Corp. - Vancouver Office Mark Morabito 604-681-8030 604-681-8039 (FAX) mmorabito@explorationgroup.com Alderon Resource Corp. - Toronto Office 416-309-2135 416-861-5887 (FAX) info@alderonmining.com www.alderonmining.com

Alderon Iron Ore Corp (TSXV:ADV)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Alderon Iron Ore Corp Charts.
Alderon Iron Ore Corp (TSXV:ADV)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Alderon Iron Ore Corp Charts.