Form 6-K - Report of foreign issuer [Rules 13a-16 and 15d-16]
June 10 2024 - 9:22AM
Edgar (US Regulatory)
UNITED
STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
Form 6-K
Report
of Foreign Private Issuer
Pursuant to Rule 13a-16 or 15d-16
under the Securities Exchange Act of 1934
For
the month of June 2024 (Report No. 2)
Commission
file number: 001-41402
BRENMILLER
ENERGY LTD.
(Translation
of registrant’s name into English)
13
Amal St. 4th Floor, Park Afek
Rosh
Haayin, 4809249 Israel
(Address of principal executive offices)
Indicate
by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
Form 20-F
☒ Form 40-F ☐
CONTENTS
On
June 10, 2024, the Company issued a press release titled
“Brenmiller Begins bGen™ ZERO Construction at Tempo’s Beverage Manufacturing Plant”, a copy of which is furnished
as Exhibit 99.1 to this Report of Foreign Private Issuer on Form 6-K (this “Report”).
The
first, second, third, fourth, and sixth paragraphs and the section titled “Forward-Looking Statements” of the press release
attached as Exhibit 99.1 to this Report are incorporated by reference into the Company’s Registration Statements on Form F-3 (File
Nos. 333-272377 and 333-273028) and Form S-8 (File Nos. 333-272266 and 333-278602), filed with the Securities and Exchange Commission,
to be a part thereof from the date on which this Report is submitted, to the extent not superseded by documents or reports subsequently
filed or furnished.
EXHIBIT
INDEX
SIGNATURES
Pursuant
to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on
its behalf by the undersigned, thereunto duly authorized.
|
Brenmiller
Energy Ltd. |
|
|
Date: June 10, 2024 |
By: |
/s/ Avraham
Brenmiller |
|
|
Name: |
Avraham
Brenmiller |
|
|
Title: |
Chief Executive Officer |
2
Exhibit 99.1
Brenmiller Begins bGen™ ZERO Construction
at Tempo’s Beverage Manufacturing Plant
| ● | Brenmiller expected to break ground on highly anticipated
electrification project for Tempo, Heineken-backed beverage manufacturer |
| ● | Brenmiller will replace Tempo’s fossil fuel boilers
with 32 MWh bGen™ TES system to deliver sustainable process heat |
| ● | Brenmiller’s bGen™ TES system estimated to
mitigate over 6,200 tons of carbon emissions annually and save Tempo an estimated $7.5 million over 15 years by eliminating the use of
approximately 2,000 tons of heavy fuel each year |
Rosh Ha’ayin, Israel, June 10, 2024 – Brenmiller
Energy Ltd. (“Brenmiller”, “Brenmiller Energy” or the “Company”) (Nasdaq: BNRG), a leading global provider
of thermal energy storage (“TES”) solutions to industrial and utility markets, today announced that it has moved into the construction
phase of development at Tempo Beverages Ltd.’s (“Tempo”) beverage production plant in Netanya, Israel, with plans to
begin on-site assembly by the end of September 2024. Brenmiller is replacing Tempo’s fossil fuel boilers with a 32 MWh bGen™
TES system and will deliver sustainable process heat through an Energy as a Service (EaaS) model. Tempo is partially owned by Heineken
International B.V. and is one of Israel’s largest producers and distributors of beverages for brands including Heineken and Pepsi.
Brenmiller’s bGen™ TES system for Tempo will charge using
a combination of roof-top solar and ultra-low-cost off-peak grid power. The system is being configured to meet the beverage manufacturer’s
precise operational needs and the final system design is expected to be completed by the end of July 2024. Brenmiller has started procuring
the necessary components to manufacture Tempo’s bGen™ system and all system manufacturing will be completed at Brenmiller’s
TES gigafactory in Dimona, Israel. System assembly is expected to be completed by the end of 2024 and commissioned in May 2025.
“We are pleased to report that our project to replace Tempo’s
polluting heavy oil boilers with our bGen™ thermal battery is progressing according to schedule and is on-track to be commissioned
less than a year from now,” stated Brenmiller’s Chairman and CEO, Avi Brenmiller. “The food and beverage industry is
one of the top global consumers of thermal energy. Our project with Tempo serves as a great model for how our bGen™ TES system can
benefit other food and beverage producers, a sector from which we are seeing strong demand.”
Approximately 15% of Brenmiller’s $500 million-plus project pipeline
is with food and beverage manufacturers, representing its largest industry vertical by project count. The Company’s Dimona gigafactory
has the production capacity to support potential sales of up to $200 million.
About bGen™
bGen™, Brenmiller’s TES system, converts electricity into
heat to power sustainable industrial processes at a price that is competitive with natural gas. The bGen™ charges by capturing low-cost
electricity from renewables or the grid and stores it in crushed rocks. It then discharges steam, hot water or hot air on demand according
to customer requirements. The bGen™ also supports the development of utility-scale renewables by providing critical flexibility
and grid-balancing capabilities. bGen™ was named among TIME’s Best Inventions of 2023 in the Green Energy category.
About Brenmiller Energy Ltd.
Brenmiller Energy helps energy-intensive industries and power producers
end their reliance on fossil fuel boilers. Brenmiller’s patented bGen™ thermal battery is a modular and scalable energy storage
system that turns renewable electricity into zero-emission heat. It charges using low-cost renewable electricity and discharges a continuous
supply of heat on demand and according to its customers’ needs. The most experienced thermal battery developer on the market, Brenmiller
operates the world’s only gigafactory for thermal battery production and is trusted by leading multinational energy companies. For
more information visit the Company’s website at https://bren-energy.com/ and follow the company on X (formerly Twitter) and LinkedIn.
Information on, or accessible through, the websites mentioned above does not form part of this press release.
Forward-Looking Statements
This press release contains “forward-looking statements”
within the meaning of the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 and other federal securities
laws. Statements that are not statements of historical fact may be deemed to be forward-looking statements. For example, the Company is
using forward-looking statements in this press release when it discusses: the installation of bGen™ ZERO at the Tempo plant and
the timeline for the various installation phases, including that the final system design is expected to be completed by the end of July
2024, that the Company will commence on site assembly of the bGen™ system by the end of September 2024, that assembly is expected
to be completed by the end of the 2024 and commissioned in May 2025, the Company’s $500 million-plus project pipeline, and that
the Company’s Dimona gigafactory has the production capacity to support potential sales of up to $200 million. Without limiting
the generality of the foregoing, words such as “plan,” “project,” “potential,” “seek,”
“may,” “will,” “expect,” “believe,” “anticipate,” “intend,” “could,”
“estimate” or “continue” are intended to identify forward-looking statements. Readers are cautioned that certain
important factors may affect the Company’s actual results and could cause such results to differ materially from any forward-looking
statements that may be made in this press release. Factors that may affect the Company’s results include, but are not limited to:
the Company’s planned level of revenues and capital expenditures; risks associated with the adequacy of existing cash resources;
the demand for and market acceptance of our products; impact of competitive products and prices; product development, commercialization
or technological difficulties; the success or failure of negotiations; trade, legal, social and economic risks; and political, economic
and military instability in the Middle East, specifically in Israel. The forward-looking statements contained or implied in this press
release are subject to other risks and uncertainties, many of which are beyond the control of the Company, including those set forth in
the Risk Factors section of the Company’s Annual Report on Form 20-F for the year ended December 31, 2023 filed with the SEC on
March 18, 2024, which is available on the SEC’s website, www.sec.gov. The Company undertakes no obligation to update these statements
for revisions or changes after the date of this release, except as required by law.
Media Contact:
Tori Bentkover
brenmillerenergy@antennagroup.com
Brenmiller Energy (NASDAQ:BNRG)
Historical Stock Chart
From Oct 2024 to Nov 2024
Brenmiller Energy (NASDAQ:BNRG)
Historical Stock Chart
From Nov 2023 to Nov 2024