Bedford Metals Announces Phase 1 of Exploration Program for Close Lake Uranium Project
July 23 2024 - 2:00AM
UK Regulatory
Bedford Metals Announces Phase 1 of Exploration Program for Close
Lake Uranium Project
VANCOUVER, British
Columbia, July 23, 2024 (GLOBE NEWSWIRE) -- Bedford Metals Corp.
(TSX-V: BFM, FWB: O8D, ISIN: CA0762301012) (the “Company” or
“Bedford”) is pleased to announce its 2024 Phase I field program
for the Close Lake Uranium Project, located on the west side of the
Athabasca Basin. Results from this program will be integrated with
historical datasets to further enhance the dataset for the
project.
The Phase I
exploration program will include a comprehensive radon gas survey
over the identified helium blooms (He1 and He2), as well as a 1000m
hematite anomaly detected through VNIR (Visible Near Field
Infrared) and SWIR (Shortwave Infrared) satellite investigations.
Radon gas, like helium, is a decay product of uranium and serves as
a pathfinder element for uranium.
The program will be
executed in two stages. The initial stage involves deploying gas
cups to collect radon gas. In the subsequent recovery stage, the
cups will be collected and analyzed. This survey aims to prioritize
and refine the exploration targets at Close Lake, setting the stage
for subsequent diamond drilling.
Peter Born, President
of Bedford, commented, “We are excited to commence the Phase I
exploration program at Close Lake. The radon gas survey will
provide us with critical data to better understand the subsurface
uranium potential and refine our drilling targets. This program
underscores our commitment to leveraging advanced exploration
techniques to unlock the full potential of our projects.”
This exploration
program at Close Lake will build on the Company’s other initiatives
to advance its uranium projects. By integrating the radon gas
survey data with existing datasets, Bedford aims to enhance its
understanding of the project area and move closer to a significant
uranium discovery.
Bedford remains
dedicated to conducting all exploration activities to the highest
environmental standards. The Company is committed to minimizing its
environmental footprint and ensuring that all operations are
sustainable and responsible. Additionally, Bedford values its
relationships with local communities and indigenous groups and is
committed to working collaboratively with these stakeholders to
ensure its activities bring positive benefits to the region.
Dr. Peter Born, P.Geo., is the designated
qualified person as defined by National Instrument 43-101, and the
President of the Company, and is responsible for and has approved
the technical information in this release.
About Bedford
Metals Corp.
Bedford Metals Corp. is a mineral exploration
company. We create value for our shareholders by identifying and
developing highly prospective mineral exploration opportunities.
Our strategy is to advance our projects from discovery to
production.
The Close Lake Uranium Project
lies on the eastern side of the Athabasca Basin, adjoining claims
held by Cameco Corporation, the largest uranium producer in the
world. The claim is approximately 245 hectares and lies within the
primary exploration corridor, which hosts the Keys Lake Mine, the
Cigar Lake Mine and the McArthur River Mine. Access to the property
is done through a network of roads and trails.
The Ubiquity Lake Uranium
Project, covering 1382 hectares, lies just south of the
bottom lip of the Athabasca Basin, adjacent to ALX Uranium’s
Carpenter Lake Project to the east. Situated near the Cable Bay
Shear Zone, parallel to the Virgin River Shear Zone, which hosts
Cameco’s Centennial uranium deposit, the project holds immense
potential. Furthermore, it is located 100 km west of Cameco’s
past-producing Key Lake uranium mine, underscoring the strategic
significance of its location.
The Sheppard Lake Uranium
Project, covers an area of approximately 2250 hectares and
adjoins the Ubiquity Lake Project to the southeast. The project
area is characterized by rocks of the Mudjatik domain, where
uranium mineralization is typically basement-hosted, situated
within shears or faults, and formed through hydrothermal
redistributions of dissolved metals and subsequent redox
reactions.
For further information, please contact the
Company at info@bedfordmetals.com or 604-622-1199 or visit the
Company’s website at www.bedfordmetals.com.
On behalf of the
Board,
Bedford Metals
Corp.
“Peter Born”
President
Neither the TSX Venture Exchange nor its
Regulation Services Provider (as that term is defined in policies
of the TSX Venture Exchange) accepts responsibility for the
adequacy or accuracy of this release.
This news release may include forward-looking
statements that are subject to risks and uncertainties. All
statements within, other than statements of historical fact, are to
be considered forward looking. Although the Company believes the
expectations expressed in such forward-looking statements are based
on reasonable assumptions, such statements are not guarantees of
future performance and actual results or developments may differ
materially from those in forward-looking statements. There can be
no assurances that such statements will prove accurate and,
therefore, readers are advised to rely on their own evaluation of
such uncertainties. We do not assume any obligation to update any
forward-looking statements except as required under the applicable
laws.
CONTACT:
MRKT360 INC
https://mrkt360.com
Alex Zertuche
alexz@mrkt360.com
For E.S.T Office Hours, Call 1
416-477-0587
Photos accompanying this announcement are available
at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/a6a187ac-a91d-402f-92c4-591b31328b0c
https://www.globenewswire.com/NewsRoom/AttachmentNg/0d7531a8-ddf0-4ac0-9548-dacd7dc3d160
Bedford Metals (TG:O8D)
Historical Stock Chart
From Oct 2024 to Nov 2024
Bedford Metals (TG:O8D)
Historical Stock Chart
From Nov 2023 to Nov 2024