TORONTO, Sept. 4, 2019 /CNW/ - Anaconda Mining Inc.
("Anaconda" or the "Company") (TSX: ANX) (OTCQX: ANXGF) is pleased
to announce results from 18 diamond drill holes (BR-19-72 to
BR-19-76 and BR-19-86 to BR-19-97 and BR-19-99) drilled in the East
Goldbrook Gold System ("EG Gold System") at the Goldboro Gold
Project in Nova Scotia
("Goldboro"). The 4,391 metres of diamond drilling were part of a
recently completed 5,734-metre diamond drill program announced on
February 28, 2019 and were designed
to infill portions of the EG Gold System (6 drill holes) to upgrade
resource categorization (the "Infill Drill Program") and to extend
the EG Gold System (12 drill holes) east of the 2018 resource model
limits at Section 9550E (the "Extension Drill Program") (Exhibit A,
B and C).
Selected composited highlights from the recent Infill Drill
Program include:
- 50.60 g/t grams per tonne ("g/t") gold over 1.0 metre (246.0
to 247.0 metres) in hole BR-19-89;
- 12.23 g/t gold over 2.0 metres (214.3 to 216.3 metres) in
hole BR-19-89;
- 6.03 g/t gold over 2.9 metres (200.7 to 203.6 metres) in
hole BR-18-90;
- 72.40 g/t gold over 0.6 metres (21.0 to 21.6 metres) in hole
BR-18-87; and
- 32.62 g/t gold over 0.9 metres (290.7 to 291.6 metres) in
hole BR-18-87.
Selected composited highlights from the recent Extension Drill
Program include:
- 27.12 g/t gold over 2.5 metres (51.3 to 53.8 metres) in hole
BR-19-97 including 133.11 g/t gold over 0.5 metres;
- 102.43 g/t gold over 0.7 metres (142.0 to 142.7 metres) in
hole BR-19-86;
- 16.65 g/t gold over 2.0 metres (167.5 to 169.5 metres) in
hole BR-18-88 including 65.49 g/t gold over 0.5 metres;
- 5.36 g/t gold over 2.2 metres (321.1 to 323.3 metres) in
hole BR-18-75; and
- 17.79 g/t gold over 0.5 metres (192.8 to 193.3 metres) in
hole BR-18-74.
"The Infill Drill Program successfully infilled specific
portions of the EG Gold System that were identified for development
in the 2018 Preliminary Economic Assessment and intersected gold
mineralization with grade and widths consistent with those
encountered during earlier drill programs. It is anticipated that
the density of drilling will upgrade these areas of the resource to
the Indicated category and will be able to be included in the
upcoming mineral resource update. In addition to these results, the
Extension Drill Program successfully demonstrated that the Goldboro
Deposit continues eastward at least 375 metres beyond the previous
geological modelling. These drill results will likewise be used to
model the deposit eastward and will be included in a resource
update. Anaconda has completed 15,837 metres of diamond drilling
since July of 2018 which will be included in the new resource
update and published in a Feasibility Study expected to be
completed in the fourth quarter of 2019. "
~Kevin Bullock, CEO, Anaconda
Mining Inc.
The Infill Drill Program intersected high-grade, mineralized
gold zones as predicted by the geological model and is expected to
upgrade resource categorization in this area of the EG Gold System
(Exhibit A and B), which was part of the mining scenario outlined
in the Company's 2018 Preliminary Economic Assessment. The Infill
Drill Program also demonstrated the continuity of mineralization in
the EG Gold System where it intersected 10 instances of visible
gold.
The Extension Drill Program extended the strike of the Goldboro
Deposit eastward by 375 metres from the 2018 resource model limit
(Exhibit A and C), encountering typical high-grade mineralization.
In addition to extending the deposit strike, the Extension Drill
Program identified 15 new mineralized zones in total and
encountered 14 instances of visible gold. The EG Gold System now
contains 26 separate mineralized zones (15 more than the 2018
resource model), has been tested to a known depth of 400 metres,
and remains open for expansion.
Anaconda also intersected strong concentrations of high-grade
mineralization (e.g. 27.12 g/t gold over 2.5 metres in hole
BR-19-97) contiguous with other high-grade gold intercepts
previously reported on February 28,
2019, which included 25.07 g/t gold over 1.5 metres
(Exhibit C). These intercepts are located approximately 150 metres
up plunge from another high-grade result of 215.74 g/t gold over
3.65 metres as previously reported from historical drilling.
These results indicate there may be high-grade chutes located along
the south dipping limb of the host fold structure within the EG
Gold System (Exhibit C), which are common in other areas of the
Goldboro Deposit. Several of these intercepts are less than 75
metres from surface and will be evaluated for open-pit potential as
part of the on-going feasibility study.
Selected composited highlights from historic and previously
reported drill results in the immediate area of the Infill and
Extension Drill Programs include:
- 215.74 g/t gold over 3.65 metres (193.85 to 197.50 metres)
in hole OSK-11-04, including 1570.00 g/t gold over 0.5
metres
- 137.77 g/t gold over 1.50 metres (117.00 to 118.50 metres)
in hole OSK-11-02, including 412.00 over 0.50 metres
- 252.76 g/t gold over 0.4 metres (76.6 to 77.0 metres) in
hole BR-18-15;
- 23.24 g/t gold over 2.5 metres (21.5 to 24.0 metres) in hole
BR-18-28;
- 7.12 g/t gold over 4.5 metres (193.5 to 198.0 metres) in
hole BR18-29;
- 25.31 g/t gold over 1.0 metre (62.0 to 63.0 metres) in hole
BR-18-18; and
- 12.87 g/t gold over 2.0 metres (130.6 to 132.6 metres) in
hole BR-18-18.
A table of selected composited assays from the Infill Drill
Program reported in this press release:
Hole
ID
|
From
(m)
|
To
(m)
|
Interval
(m)
|
Gold
(g/t)
|
System
|
Visible
Gold
|
BR-19-87
|
21.0
|
21.6
|
0.6
|
72.40
|
EG
|
VG
|
and
|
66.0
|
67.0
|
1.0
|
2.17
|
EG
|
|
and
|
76.5
|
78.0
|
1.5
|
2.53
|
EG
|
|
and
|
86.5
|
87.0
|
0.5
|
67.89
|
EG
|
VG
|
and
|
161.5
|
162.0
|
0.5
|
2.09
|
EG
|
|
and
|
190.4
|
191.5
|
1.1
|
1.06
|
EG
|
VG
|
and
|
227.1
|
228.8
|
1.7
|
1.30
|
EG
|
|
and
|
290.7
|
291.6
|
0.9
|
32.62
|
EG
|
|
BR-19-89
|
90.4
|
91.4
|
1.0
|
1.00
|
EG
|
|
and
|
102.5
|
103.1
|
0.6
|
33.63
|
EG
|
|
and
|
111.0
|
112.0
|
1.0
|
1.55
|
EG
|
|
and
|
116.0
|
116.5
|
0.5
|
1.86
|
EG
|
|
and
|
158.5
|
159.0
|
0.5
|
27.96
|
EG
|
VG
|
and
|
163.0
|
163.5
|
0.5
|
1.91
|
EG
|
|
and
|
196.4
|
197.0
|
0.6
|
20.91
|
EG
|
VG
|
and
|
200.7
|
202.3
|
1.6
|
1.06
|
EG
|
|
and
|
214.3
|
216.3
|
2.0
|
12.23
|
EG
|
|
including
|
214.8
|
215.3
|
0.5
|
45.42
|
EG
|
VG
|
and
|
238.1
|
238.6
|
0.5
|
1.78
|
EG
|
|
and
|
243.4
|
244.1
|
0.7
|
4.52
|
EG
|
|
and
|
246.0
|
247.0
|
1.0
|
50.60
|
EG
|
VG
|
BR-19-90
|
198.0
|
203.6
|
5.6
|
3.34
|
EG
|
|
including
|
200.7
|
203.6
|
2.9
|
6.03
|
EG
|
|
including
|
202.9
|
203.6
|
0.7
|
22.36
|
EG
|
|
and
|
242.0
|
242.7
|
0.7
|
2.78
|
EG
|
|
and
|
295.1
|
295.7
|
0.6
|
9.12
|
EG
|
VG
|
and
|
323.9
|
325.4
|
1.5
|
1.46
|
EG
|
|
BR-19-91
|
83.7
|
84.2
|
0.5
|
0.66
|
EG
|
VG
|
and
|
121.2
|
122.2
|
1.0
|
1.59
|
EG
|
|
BR-19-92
|
29.0
|
30.0
|
1.0
|
0.98
|
EG
|
VG
|
and
|
201.8
|
204.8
|
3.0
|
1.88
|
EG
|
|
including
|
202.8
|
203.8
|
1.0
|
4.75
|
EG
|
|
and
|
229.0
|
231.5
|
2.5
|
4.10
|
EG
|
|
including
|
229.0
|
229.5
|
0.5
|
18.32
|
EG
|
|
and
|
236.1
|
236.6
|
0.5
|
3.30
|
EG
|
|
and
|
375.0
|
375.5
|
0.5
|
2.42
|
EG
|
|
BR-19-99
|
44.0
|
44.5
|
0.5
|
4.52
|
EG
|
|
A table of selected composited assays from the Extension Drill
Program reported in this press release:
Hole
ID
|
From
(m)
|
To
(m)
|
Interval
(m)
|
Gold
(g/t)
|
System
|
Visible
Gold
|
BR-19-73
|
95.7
|
96.2
|
0.5
|
2.35
|
EG
|
|
BR-19-74
|
118.2
|
118.7
|
0.5
|
2.52
|
EG
|
|
and
|
192.8
|
193.3
|
0.5
|
17.79
|
EG
|
|
and
|
220.0
|
222.0
|
2.0
|
1.64
|
EG
|
|
and
|
228.2
|
230.0
|
1.8
|
0.60
|
EG
|
|
and
|
237.0
|
238.5
|
1.5
|
0.84
|
EG
|
|
and
|
249.5
|
250.1
|
0.6
|
3.18
|
EG
|
|
and
|
290.0
|
290.6
|
0.6
|
7.25
|
EG
|
|
BR-19-75
|
202.7
|
203.7
|
1.0
|
4.43
|
EG
|
VG
|
and
|
273.3
|
274.0
|
0.7
|
3.03
|
EG
|
|
and
|
290.0
|
290.5
|
0.5
|
2.49
|
EG
|
|
and
|
321.1
|
323.3
|
2.2
|
5.36
|
EG
|
|
including
|
321.1
|
321.7
|
0.6
|
17.69
|
EG
|
|
BR-19-76
|
27.0
|
28.0
|
1.0
|
1.44
|
EG
|
|
and
|
71.6
|
74.6
|
3.0
|
2.05
|
EG
|
VG
|
including
|
71.6
|
72.1
|
0.5
|
8.81
|
EG
|
VG
|
and
|
81.6
|
86.0
|
4.4
|
0.85
|
EG
|
|
and
|
94.4
|
98.0
|
3.6
|
0.78
|
EG
|
|
and
|
129.6
|
131.5
|
1.9
|
0.99
|
EG
|
|
and
|
222.0
|
222.7
|
0.7
|
1.10
|
EG
|
VG
|
BR-19-86
|
87.0
|
91.0
|
4.0
|
0.96
|
EG
|
|
and
|
93.0
|
95.0
|
2.0
|
0.53
|
EG
|
|
and
|
116.6
|
117.6
|
1.0
|
1.11
|
EG
|
|
and
|
124.0
|
127.7
|
3.7
|
0.75
|
EG
|
|
and
|
136.4
|
139.0
|
2.6
|
0.97
|
EG
|
|
and
|
142.0
|
142.7
|
0.7
|
102.43
|
EG
|
VG
|
and
|
170.3
|
171.0
|
0.7
|
5.56
|
EG
|
|
BR-19-88
|
78.0
|
80.5
|
2.5
|
2.70
|
EG
|
VG
|
including
|
79.5
|
80.5
|
1.0
|
6.47
|
EG
|
VG
|
and
|
97.0
|
98.0
|
1.0
|
1.02
|
EG
|
|
and
|
112.0
|
117.6
|
5.6
|
0.80
|
EG
|
|
and
|
131.0
|
132.0
|
1.0
|
0.87
|
EG
|
|
and
|
148.6
|
155.0
|
6.4
|
2.76
|
EG
|
|
including
|
149.7
|
150.4
|
0.7
|
17.88
|
EG
|
|
and
|
167.5
|
169.5
|
2.0
|
16.65
|
EG
|
|
including
|
168.5
|
169.0
|
0.5
|
65.49
|
EG
|
|
BR-19-93
|
21.5
|
22.0
|
0.5
|
8.40
|
EG
|
|
and
|
88.1
|
88.6
|
0.5
|
0.67
|
EG
|
VG
|
and
|
97.5
|
98.0
|
0.5
|
0.82
|
EG
|
VG
|
and
|
109.5
|
110.0
|
0.5
|
4.14
|
EG
|
VG
|
BR-19-94
|
35.5
|
37.1
|
1.6
|
0.77
|
EG
|
|
BR-19-95
|
16.0
|
18.7
|
2.7
|
2.45
|
EG
|
|
including
|
16.7
|
17.7
|
1.0
|
6.01
|
EG
|
|
and
|
27.2
|
34.9
|
7.7
|
1.00
|
EG
|
|
and
|
37.9
|
39.4
|
1.5
|
0.68
|
EG
|
|
and
|
50.0
|
50.5
|
0.5
|
2.18
|
EG
|
VG
|
and
|
19.5
|
22.0
|
2.5
|
0.66
|
EG
|
|
and
|
27.0
|
31.7
|
4.7
|
0.81
|
EG
|
|
including
|
31.2
|
31.7
|
0.5
|
3.80
|
EG
|
|
and
|
43.5
|
46.0
|
2.5
|
2.12
|
EG
|
VG
|
and
|
67.0
|
67.5
|
0.5
|
3.32
|
EG
|
VG
|
BR-19-97
|
19.8
|
21.3
|
1.5
|
1.58
|
EG
|
|
and
|
27.5
|
28.2
|
0.7
|
1.28
|
EG
|
VG
|
and
|
51.3
|
53.8
|
2.5
|
27.12
|
EG
|
VG
|
including
|
52.3
|
52.8
|
0.5
|
133.11
|
EG
|
|
and
|
60.9
|
63.0
|
2.1
|
2.53
|
EG
|
|
including
|
61.9
|
62.4
|
0.5
|
8.28
|
EG
|
|
and
|
70.3
|
71.8
|
1.5
|
0.87
|
EG
|
|
and
|
95.0
|
101.4
|
6.4
|
1.64
|
EG
|
VG
|
including
|
99.6
|
100.4
|
0.8
|
8.02
|
EG
|
|
and
|
104.9
|
105.9
|
1.0
|
1.56
|
EG
|
|
No significant composites were noted from hole
BR-19-72.
Additional Drilling at Goldboro
As part of the drilling announced in February 28, 2019, Anaconda has completed an
additional 740 metres of drilling in 6 diamond drill holes
(BR-19-98 and BR-19-100 to BR-19-104) near the center of the
Goldboro deposit. These holes were
drilled to infill specific portions of the Goldboro Deposit that
required more drilling as identified by the ongoing resource
update. Results from these six drill holes will be released upon
receipt of the final assays.
This news release has been reviewed and approved by
Paul McNeill, P. Geo., VP
Exploration with Anaconda Mining Inc., a "Qualified Person", under
National Instrument 43-101 Standard for Disclosure for Mineral
Projects.
All samples and the resultant composites referred to in this
release are collected using QA/QC protocols including the regular
insertion of standards and blanks within the sample batch for
analysis and check assays of select samples. All samples quoted in
this release were analyzed at Eastern Analytical Ltd. in
Springdale, NL, for Au by fire
assay (30 g) with an AA finish.
Samples analyzing greater than 0.5 g/t Au via 30 g fire assay
were re-analyzed at Eastern via total pulp metallic. For the total
pulp metallic analysis, the entire sample is crushed to -10mesh and
pulverized to 95% -150mesh. The total sample is then weighed and
screened to 150mesh. The +150-mesh fraction is fire assayed for Au,
and a 30 g subsample of the -150mesh fraction analyzed via fire
assay. A weighted average gold grade is calculated for the final
reportable gold grade. Anaconda considers total pulp metallic
analysis to be more representative than 30 g fire assay in coarse
gold systems such as the Goldboro Deposit.
Reported mineralized intervals are measured from core
lengths. Intervals are estimated to be approximately 80-100% of
true widths.
A version of this press release will be available in French
on Anaconda's website (www.anacondamining.com) in two to three
business days.
ABOUT ANACONDA
Anaconda is a TSX and OTCQX-listed gold mining, development, and
exploration company, focused in Atlantic
Canada. The company operates mining and milling operations
in the prolific Baie Verte Mining District of Newfoundland which includes the
fully-permitted Pine Cove Mill, tailings facility and deep-water
port, as well as ~11,000 hectares of highly prospective mineral
lands including those adjacent to the past producing, high-grade
Nugget Pond Mine at its Tilt Cove Gold Project. Anaconda is also
developing the Goldboro Gold Project in Nova Scotia, a high-grade resource and the
subject of an on-going feasibility study.
FORWARD-LOOKING STATEMENTS
This news release contains "forward-looking information"
within the meaning of applicable Canadian and United States securities legislation.
Generally, forward-looking information can be identified by the use
of forward-looking terminology such as "plans", "expects", or "does
not expect", "is expected", "budget", "scheduled", "estimates",
"forecasts", "intends", "anticipates", or "does not anticipate", or
"believes" or variations of such words and phrases or state that
certain actions, events or results "may", "could", "would",
"might", or "will be taken", "occur", or "be achieved".
Forward-looking information is based on the opinions and estimates
of management at the date the information is made, and is based on
a number of assumptions and is subject to known and unknown risks,
uncertainties and other factors that may cause the actual results,
level of activity, performance or achievements of Anaconda to be
materially different from those expressed or implied by such
forward-looking information, including risks associated with the
exploration, development and mining such as economic factors as
they effect exploration, future commodity prices, changes in
foreign exchange and interest rates, actual results of current
production, development and exploration activities, government
regulation, political or economic developments, environmental
risks, permitting timelines, capital expenditures, operating or
technical difficulties in connection with development activities,
employee relations, the speculative nature of gold exploration and
development, including the risks of diminishing quantities of
grades of resources, contests over title to properties, and changes
in project parameters as plans continue to be refined as well as
those risk factors discussed in Anaconda's annual information form
for the year ended December 31, 2018,
available on www.sedar.com. Although Anaconda has attempted to
identify important factors that could cause actual results to
differ materially from those contained in forward-looking
information, there may be other factors that cause results not to
be as anticipated, estimated or intended. There can be no assurance
that such information will prove to be accurate, as actual results
and future events could differ materially from those anticipated in
such information. Accordingly, readers should not place undue
reliance on forward-looking information. Anaconda does not
undertake to update any forward-looking information, except in
accordance with applicable securities laws.
SOURCE Anaconda Mining Inc.