SUDBURY,
ON, Dec. 14, 2022 /CNW/ - Frontier Lithium
Inc. (TSXV: FL) (FRA: HL2) (OTCQX: LITOF) ("Frontier" or "the
Company") is pleased to announce the results for seven more drill
holes completed during Phase XII drill program on the Spark
pegmatite which began in May with two diamond drill rigs and
finished in October of 2022 with 14,641m in 45 holes. The main objective of
the program was focused on converting inferred material to the
indicated category for the planned open pit. The Spark
pegmatite is one of the two delineated premium spodumene-bearing
lithium deposits on the PAK Lithium Project.
Highlights
- When combining Phase XI and Phase XII delineation and infill
drilling, the Company completed 15,984m of drilling in 50 holes in 2022.
Highlights from the seven Phase XII diamond drill holes reported
are included below.
- DDH PL-077-22 intersected 126.8m
of pegmatite from 56.9m to
183.7m averaging 1.31%
Li2O. Drilled from the south, PL-077-22 was the first of
4 holes designed to define the eastern extent where the main Spark
pegmatite orebody begins to break up into smaller pods separated by
mafic rafts.
-
- Includes two narrow lithium and tantalum enriched zones at
depth including 11.1m from 260.2 to
271.3m averaging 1.79%
Li2O and 459 ppm Ta2O5 and
13.5m from 414.5 to 428.0m averaging 1.01% Li2O and 194
ppm Ta2O5.
- DDH PL-078-22 intersected 104.9m
of pegmatite from 120.4 to 225.3m
averaging 1.58% Li2O and a second 33.5m pegmatite zone from 246.7 to 280.2m averaging 1.63% Li2O. Collared
in the mafic volcanic host rock 24m
west of PL-040-19, the hole designed to define the eastern extent
where the main Spark pegmatite orebody begins to break up into
smaller pods separated by mafic rafts.
-
- Includes 35m from 149.0 to
184.0m averaging 2.39%
Li2O.
- Includes 24.3m from 255.5m to 259.8m
averaging 2.04% Li2O.
"We are pleased with the drilling results from the 2022 Drill
Program to date, with the Spark deposit remaining open in all
directions. The focus continues to be at depth and to the west
where the grade and thicknesses of the deposit remain robust."
states Garth Drever, V.P.
Exploration. "Of the 14,641m drilled
during Phase XII, a total of 8,720m
of drill core was cut and submitted for analysis. 15 holes are
outstanding and will be disseminated as they are received and pass
quality assurance and control protocols."
The initial objective for the Phase XII drill program was
focused on converting the inferred resource within the Spark
deposit to the indicated category in preparation for a
pre-feasibility study on the PAK Lithium Project. The latter
half of the program included geotechnical drilling for ground
control and pit design purposes as well as step out drilling to
define the eastern and western extents of the ore body.
Figure 1 is a location map showing the project area including
Frontier's land tenure and location of the three
lithium-cesium-tantalum pegmatites.
Figure 2 is a plan view showing all drilling with analytical
data completed to date with emphasis on drill hole traces reported
in this release.
Table 1 details the drill holes and channel with mineralized
intersections while Table 2 summarizes all Phase XII drill holes
completed as well as the channel.
Table 1: Details of Mineralized Intersections
Drill Hole
PL-077-22
|
Collared in between
PL-076-22 and PL-045-19, the hole was designed to define the
pegmatite east of the main body where it begins to break up into
smaller pods separated by
mafic rafts. In total, 159m of pegmatite was intersected, most of
which was mineralized
(>1% Li2O).
|
Zone
|
From
(m)
|
To
(m)
|
Width
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta2O5 (ppm)
|
Nb2O5 (ppm)
|
SnO2 (ppm)
|
Rb2O
(%)
|
Unit
|
Li-Enriched
|
56.9
|
183.7
|
126.8
|
1.31
|
0.02
|
85
|
70
|
113
|
0.26
|
Pegmatite-Aplite
|
|
including
|
76.0
|
102.0
|
26.0
|
1.77
|
0.02
|
89
|
70
|
160
|
0.28
|
Pegmatite
|
Li-Ta-Rb
Enriched
|
260.2
|
271.3
|
11.1
|
1.79
|
0.31
|
459
|
49
|
122
|
0.68
|
Aplite
|
Li-Ta-Rb
Enriched
|
414.5
|
428.0
|
13.5
|
1.01
|
0.19
|
194
|
37
|
113
|
0.47
|
Aplite
|
Drill Hole
PL-078-22
|
Collared 24m west of
PL-040-19, the hole was designed to define the pegmatite on the
east
extent of Spark where the pegmatite pods begin to pinch
out
|
Zone
|
From
(m)
|
To
(m)
|
Width
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta2O5 (ppm)
|
Nb2O5 (ppm)
|
SnO2 (ppm)
|
Rb2O
(%)
|
Unit
|
Li-Enriched
|
120.4
|
225.3
|
104.9
|
1.58
|
0.04
|
153
|
64
|
120
|
0.35
|
Aplite
|
|
|
including
|
149.0
|
184.0
|
35.0
|
2.39
|
0.03
|
208
|
69
|
120
|
0.38
|
Aplite
|
|
Li-
Enriched
|
246.7
|
280.2
|
33.5
|
1.63
|
0.07
|
186
|
50
|
56
|
0.26
|
Pegmatite
|
|
including
|
255.5
|
279.8
|
24.3
|
2.04
|
0.05
|
256
|
69
|
48
|
0.29
|
Pegmatite
|
Drill Hole
PL-080-22
|
Collared 16m south of
PL-051-21 on the of the main Spark pegmatite, the hole
was designed to define the west end where the main ore body begins
to break up into smaller
pegmatite pods separated by mafic rafts. A total of 190m of
pegmatite was intersected with
much of the southern lower intersections barren of
spodumene.
|
Zone
|
From
m)
|
To
(m)
|
Width
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta2O5 (ppm)
|
Nb2O5 (ppm)
|
SnO2 (ppm)
|
Rb2O
(%)
|
Unit
|
Li-Enriched
|
2.5
|
81.0
|
78.5
|
1.12
|
0.02
|
69
|
83
|
69
|
0.25
|
Aplite-pegmatite
|
|
including
|
2.5
|
32.0
|
29.5
|
1.75
|
0.01
|
44
|
71
|
72
|
0.31
|
Pegmatite
|
Li-Enriched
|
94.5
|
100.0
|
5.5
|
2.07
|
0.01
|
51
|
27
|
52
|
0.19
|
Pegmatite
|
Li-Enriched
|
106.0
|
121.1
|
15.1
|
2.20
|
0.03
|
93
|
66
|
75
|
0.42
|
Pegmatite
|
|
|
|
|
|
|
|
|
|
|
|
|
Drill Hole
PL-081-22
|
Collared 13m south of
PL-080-22 on top of the main Spark pegmatite, the hole was
designed
to fill in a gap to convert material and to further define the
southern contact of the main ore
body. The intent was to extend the hole and further define
smaller pegmatite pods to the
south. A total of 227.3m of pegmatite was intersected with mostly
barren pegmatite below 200m..
|
Zone
|
From
(m)
|
To
(m)
|
Width
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta2O5 (ppm)
|
Nb2O5 (ppm)
|
SnO2
(ppm)
|
Rb2O
(%)
|
Unit
|
Li-Enriched
|
3.4
|
48.1
|
44.7
|
1.40
|
0.02
|
56
|
74
|
36
|
0.26
|
Aplite-pegmatite
|
|
including
|
32.9
|
40.3
|
7.4
|
2.98
|
0.01
|
71
|
72
|
36
|
0.18
|
Pegmatite
|
Li-Enriched
|
59.3
|
144.1
|
84.9
|
1.63
|
0.01
|
92
|
87
|
45
|
0.26
|
Aplite
|
|
|
including
|
112.5
|
140.5
|
28.0
|
2.06
|
0.01
|
86
|
86
|
42
|
0.27
|
Aplite
|
|
Li-Enriched
|
162.1
|
198.2
|
36.1
|
1.75
|
0.03
|
78
|
106
|
64
|
0.24
|
Aplite
|
|
|
including
|
163.0
|
189.0
|
26.0
|
2.03
|
0.02
|
82
|
109
|
60
|
0.27
|
Aplite
|
|
Drill Hole
PL-082-22
|
Collared on the
southern end of CH-50 on top of the main Spark pegmatite, designed
to fill in
a gap and define the northern contact of the main
orebody.
|
Zone
|
From
(m)
|
To
(m)
|
Width
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta2O5 (ppm)
|
Nb2O5 (ppm)
|
SnO2 (ppm)
|
Rb2O
(%)
|
Unit
|
Li-Enriched
|
0.0
|
25.5
|
25.5
|
1.08
|
0.04
|
43
|
53
|
58
|
0.20
|
Pegmatite
|
|
including
|
0.0
|
17.5
|
17.5
|
1.35
|
0.05
|
43
|
51
|
60
|
0.21
|
Pegmatite
|
Li-Enriched
|
36.3
|
86.0
|
49.8
|
1.80
|
0.01
|
67
|
82
|
42
|
0.24
|
Pegmatite-Aplite
|
|
including
|
76.5
|
86.0
|
9.5
|
2.92
|
0.01
|
50
|
54
|
32
|
0.20
|
Aplite-pegmatite
|
Li-Enriched
|
111.7
|
187.3
|
75.7
|
1.70
|
0.02
|
130
|
98
|
71
|
0.29
|
Aplite-pegmatite
|
|
including
|
123.5
|
141.0
|
17.5
|
2.14
|
0.03
|
119
|
85
|
106
|
0.30
|
Pegmatite
|
Drill Hole
PL-083-22
|
Collared 32m east of
PL-078-22, the hole was designed to define the pegmatite on the
east
extent of Spark where the pegmatite pods begin to pinch
out
|
Zone
|
From
(m)
|
To
(m)
|
Width
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta2O5 (ppm)
|
Nb2O5 (ppm)
|
SnO2 (ppm)
|
Rb2O
(%)
|
Unit
|
Li-Enriched
|
121.4
|
154.9
|
33.5
|
1.67
|
0.04
|
165
|
58
|
109
|
0.29
|
Aplite-Pegmatite
|
|
including
|
145.0
|
153.9
|
8.8
|
3.09
|
0.00
|
322
|
80
|
59
|
0.06
|
Pegmatite
|
Li-Enriched
|
169.5
|
209.6
|
40.1
|
1.04
|
0.03
|
100
|
42
|
100
|
0.26
|
Aplite
|
|
|
including
|
171.9
|
202.4
|
30.5
|
1.19
|
0.03
|
107
|
46
|
111
|
0.29
|
Aplite
|
|
Li-Enriched
|
316.5
|
361.0
|
44.5
|
1.56
|
0.11
|
202
|
49
|
146
|
0.82
|
Pegmatite-Aplite
|
|
including
|
337.0
|
353.8
|
16.8
|
2.34
|
0.09
|
143
|
37
|
93
|
0.99
|
Pegmatite
|
Drill Hole
PL-084-22
|
Collared 18m east of
PL-083-22, the hole was stepped out to cut off the east extent
of
the Spark pegmatite. Although the pegmatite is narrowing, it
still remains open
|
|
Zone
|
From
(m)
|
To
(m)
|
Width
(m)
|
Li2O
(%)
|
Cs2O
(%)
|
Ta2O5 (ppm)
|
Nb2O5 (ppm)
|
SnO2 (ppm)
|
Rb2O
(%)
|
Unit
|
|
Li-Enriched
|
14.4
|
20.2
|
5.9
|
2.41
|
0.01
|
73
|
45
|
21
|
0.25
|
Pegmatite
|
|
Li-Enriched
|
92.1
|
97.0
|
4.9
|
1.21
|
0.01
|
150
|
79
|
76
|
0.21
|
Aplite
|
|
Li-Enriched
|
107.2
|
123.0
|
15.8
|
1.36
|
0.02
|
134
|
71
|
80
|
0.35
|
Aplite
|
|
Table 2: Summary of Phase XII Drill Program (May to
October 2022)
DDHNo
|
Date
Drilled
|
UTM Zone 15N
(NAD83)
|
Collar
Orient
|
Metres
Drilled
|
Start
|
End
|
Easting
|
Northing
|
(mASL)
|
Azim
|
Dip
|
Start
|
End
|
Phase
XII
|
PL-057-221
|
2022-05-15
|
2022-10-01
|
472,733
|
5,829,489
|
355.9
|
359
|
-55
|
0
|
225
|
PL-058-221
|
2022-05-17
|
2022-10-03
|
472,733
|
5,829,489
|
355.9
|
177
|
-70
|
0
|
400
|
PL-059-222
|
2022-05-24
|
2022-05-28
|
472,698
|
5,829,535
|
356.0
|
165
|
-78
|
0
|
316
|
PL-060-222
|
2022-05-27
|
2022-06-04
|
472,749
|
5,829,559
|
360.0
|
180
|
-73
|
0
|
360
|
PL-061-222
|
2022-05-20
|
2022-05-27
|
472,773
|
5,829,561
|
360.2
|
178
|
-65
|
0
|
327
|
PL-062-223
|
2022-05-28
|
2022-06-05
|
472,712
|
5,829,596
|
356.2
|
176
|
-65
|
0
|
360
|
PL-063-221
|
2022-06-05
|
2022-06-10
|
472,746
|
5,829,539
|
360.0
|
187
|
-70
|
0
|
348.5
|
PL-064-221
|
2022-06-05
|
2022-06-10
|
472,712
|
5,829,596
|
356.2
|
141
|
-65
|
0
|
352.5
|
PL-065-224
|
2022-06-10
|
2022-06-22
|
472,686
|
5,829,583
|
354.0
|
173
|
-72
|
0
|
330.86
|
PL-066-223
|
2022-06-12
|
2022-06-27
|
472,732
|
5,829,371
|
325.0
|
323
|
-70
|
0
|
365.67
|
PL-067-224
|
2022-06-29
|
2022-07-04
|
472,778
|
5,829,383
|
327.0
|
315
|
-70
|
0
|
352.5
|
PL-068-222
|
2022-06-22
|
2022-06-27
|
472,790
|
5,829,540
|
360.0
|
171
|
-55
|
0
|
343.5
|
PL-069-224
|
2022-07-06
|
2022-07-15
|
472,814
|
5,829,385
|
326.0
|
324
|
-61
|
0
|
412.3
|
PL-070-223
|
2022-06-28
|
2022-07-04
|
472,805
|
5,829,588
|
360.0
|
184
|
-54
|
0
|
405
|
PL-071-223
|
2022-07-04
|
2022-07-15
|
472,805
|
5,829,588
|
360.0
|
160
|
-52
|
0
|
384.6
|
PL-072-224
|
2022-07-15
|
2022-07-21
|
472,847
|
5,829,384
|
326.0
|
349
|
-61
|
0
|
386.2
|
PL-073-223
|
2022-07-16
|
2022-07-23
|
472,816
|
5,829,589
|
360.0
|
146
|
-52
|
0
|
392
|
PL-074-225
|
2022-07-28
|
2022-08-02
|
472,584
|
5,829,497
|
354.0
|
162
|
-47
|
0
|
403.5
|
PL-075-225
|
2022-08-01
|
2022-08-06
|
472,571
|
5,829,490
|
354.0
|
177
|
-47
|
0
|
408
|
PL-076-225
|
2022-07-25
|
2022-08-05
|
472,846
|
5,829,384
|
326.0
|
314
|
-63
|
0
|
438
|
PL-077-22
|
2022-08-08
|
2022-08-24
|
472,864
|
5,829,390
|
326.0
|
354
|
-56
|
0
|
433.38
|
PL-078-22
|
2022-08-25
|
2022-09-01
|
472,939
|
5,829,369
|
326.0
|
341
|
-55
|
0
|
339.7
|
PL-079-225
|
2022-08-06
|
2022-08-15
|
472,538
|
5,829,480
|
357.0
|
177
|
-48
|
0
|
417
|
PL-080-22
|
2022-08-16
|
2022-08-23
|
472,687
|
5,829,511
|
354.0
|
193
|
-55
|
0
|
418.5
|
PL-081-22
|
2022-08-24
|
2022-08-30
|
472,689
|
5,829,499
|
354.0
|
177
|
-46
|
0
|
367.7
|
PL-082-22
|
2022-08-30
|
2022-09-02
|
472,718
|
5,829,455
|
355.0
|
6
|
-61
|
0
|
241.5
|
PL-083-22
|
2022-09-02
|
2022-09-06
|
472,971
|
5,829,367
|
326.0
|
343
|
-57
|
0
|
377.3
|
PL-084-22
|
2022-09-07
|
2022-09-11
|
472,983
|
5,829,380
|
325.0
|
358
|
-42
|
0
|
327
|
PL-085-22
|
2022-09-02
|
2022-09-05
|
472,731
|
5,829,472
|
354.0
|
309
|
-57
|
0
|
232
|
PL-086-22
|
2022-09-05
|
2022-09-08
|
472,731
|
5,829,472
|
354.0
|
162
|
-46
|
0
|
201
|
PL-087-22
|
2022-09-08
|
2022-09-11
|
472,701
|
5,829,451
|
354.0
|
318
|
-50
|
0
|
213.4
|
PL-088-22
|
2022-09-11
|
2022-09-16
|
472,706
|
5,829,453
|
354.0
|
173
|
-46
|
0
|
210.7
|
PL-089-22
|
2022-09-16
|
2022-09-17
|
472,762
|
5,829,514
|
360.0
|
360
|
-50
|
0
|
87
|
PL-090-22
|
2022-09-11
|
2022-09-15
|
472,746
|
5,829,371
|
326.0
|
334
|
-45
|
0
|
289.4
|
PL-091-22
|
2022-09-15
|
2022-09-18
|
472,663
|
5,829,362
|
327.0
|
338
|
-43
|
0
|
261.4
|
PL-092-22
|
2022-09-17
|
2022-10-20
|
472,762
|
5,829,514
|
360.0
|
174
|
-46
|
0
|
274.5
|
PL-093-22
|
2022-09-20
|
2022-09-23
|
472,614
|
5,829,329
|
328.0
|
345
|
-47
|
0
|
253.6
|
PL-094-22
|
2022-09-24
|
2022-10-01
|
472,657
|
5,829,357
|
326.0
|
351
|
-54
|
0
|
339
|
PL-095-22
|
2022-09-20
|
2022-09-23
|
472,785
|
5,829,531
|
362.0
|
165
|
-44
|
0
|
258.6
|
PL-096-22
|
2022-09-23
|
2022-09-30
|
472,865
|
5,829,583
|
359.0
|
136
|
-44
|
0
|
425.3
|
PL-097-22
|
2022-10-03
|
2022-10-04
|
472,698
|
5,829,535
|
354.0
|
6
|
-70
|
0
|
12.5
|
PL-098-22
|
2022-10-01
|
2022-10-09
|
472,756
|
5,829,387
|
327.0
|
317
|
-58
|
1
|
471
|
PL-099-22
|
2022-10-09
|
2022-10-15
|
472,529
|
5,829,361
|
330.0
|
345
|
-65
|
0
|
477
|
PL-GDH-11-22
|
2022-07-22
|
2022-07-24
|
473,046
|
5,829,379
|
325.0
|
285
|
-47
|
0
|
173.5
|
PL-GDH-12-22
|
2022-07-23
|
2022-07-25
|
472,456
|
5,829,470
|
358.0
|
119
|
-45
|
0
|
228
|
|
Total metres
drilled
|
14,641.1
|
Notes:
|
1: Reported on
Release July 25, 2022
|
|
2: Reported on
Release August 17, 2022
|
|
3: Reported on
Release September 20, 2022
|
|
4: Reported on
Release October 11, 2022
|
|
5: Reported on
Release November 16, 2022
|
Due Diligence
All scientific and technical information in this release has
been reviewed and approved by Garth Drever, P.Geo., the
qualified person (QP) under the definitions established by National
Instrument 43-101. Under Frontier's QA/QC procedures,
all drilling was completed by Chenier Drilling Ltd. of Val Caron, ON using thin walled BTW drill rods
(4.2 cm core diameter) and a Reflex ACT III oriented core system.
Using the Reflex system, the drill core was oriented and marked as
it was retrieved at the drill. The core was boxed and delivered to
the Frontier core shack where it was examined, geologically logged,
and marked for sampling. The core was photographed prior to
sampling. Using a rock saw, the marked sample intervals were
halved with one-half bagged for analysis. Sample blanks along with
lithium, rubidium and cesium certified reference material was
routinely inserted into the sample stream in accordance with
industry recommended practices. Field duplicate samples were also
taken in accordance with industry recommended practices. The
samples were placed in poly sample bags and transported to
Red Lake by float plane and then
shipped to AGAT Laboratories Ltd. (AGAT) in Thunder Bay for sample preparation and to
Mississauga, Ontario for
processing and quantitative multi-element analysis. AGAT is an ISO
accredited laboratory. The core is stored on site at the Pakeagama
Lake exploration camp.
New Stock Option Plan and Grant of Stock Options
The Company also announces that it has adopted a new 10% rolling
stock option plan (the "New Stock Option Plan"). The New
Stock Option Plan has been approved by the board of directors of
the Company, the shareholders of the Company at the annual general
meeting of shareholders on October 3,
2022, and is subject to approval by the TSX Venture Exchange
("TSXV"). The New Stock Option Plan replaces the Company's
previous 10% fixed stock option plan.
Under the New Stock Option Plan, the Company may grant options
to acquire common shares of the Company in an aggregate amount of
up to 10% of the then current issued and outstanding common shares,
subject to the terms and conditions of the New Stock Option Plan,
the Policies of the TSXV and applicable securities laws. Any
options outstanding under the previous stock option plan will be
governed by the New Stock Option Plan. The New Stock Option Plan
will be filed on the Company's SEDAR profile and the terms,
limitations and conditions of this plan can be accessed at
www.sedar.com.
The board of directors of the Company would also like to
announce at this time that is has granted an aggregate of 4,900,000
stock options under the New Stock Option Plan (the
"Options"). The Options have been issued to certain
directors, officers, consultants and employees of the Company for
retention purposes, and in recognition of these individuals
continuing efforts in assisting the Company's with its growth. The
Options are exercisable at a price of $ $2.10 per common share and will have a term of 5
years from the date of issuance. 50% of these Options vest on the
grant date, and the remaining 50% vest on the date that is the
first anniversary date of the grant date. These Options are subject
to approval by the TSXV.
About Frontier Lithium
Frontier Lithium is a preproduction business with an objective
to become a strategic domestic supplier of spodumene concentrates
for industrial users as well as battery-grade lithium hydroxide and
other chemicals to the growing electric vehicle and energy storage
markets in North America. The
Company maintains the largest land position and resource in a
premium lithium mineral district located in Ontario's Great Lakes region.
About PAK Lithium
Project
The PAK lithium project contains one of North America's highest-grade lithium
resources. The project encompasses close to 27,000 hectares and
remains largely unexplored; however, since 2013, the company has
delineated two premium spodumene-bearing lithium deposits (PAK and
Spark), located 2.3 kilometres apart. Exploration is continuing on
the project through two other spodumene-bearing discoveries: the
Bolt pegmatite (located between the PAK and Spark deposits), as
well as the Pennock pegmatite (25 kilometres northwest of PAK
deposit within the project claims). A 2021 preliminary economic
assessment (National Instrument 43-101 technical report titled "NI
43-101 Technical Report, Pak Property, PAK, Red Lake Mining
District, Ontario, Canada" by BBA
E&C Inc., with an effective date of April 5, 2021) delivered a fully integrated
lithium operation, including the mine and mill and the conversion
plant for production of battery-quality lithium salts.
Forward-looking Statements
Neither the TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release. This release includes certain statements
that may be deemed "forward-looking statements". All statements in
this release, other than statements of historical facts, that
address future production, reserve potential, exploration drilling,
exploitation activities and events or developments that the Company
expects are forward-looking statements. Although the Company
believes the expectations expressed in such forward-looking
statements are based on reasonable assumptions, such statements are
not guarantees of future performance and actual results or
developments may differ materially from those in the
forward-looking statements. Factors that could cause actual results
to differ materially from those in forward looking statements
include market prices, exploitation and exploration successes,
continued availability of capital and financing, and general
economic, market or business conditions. Investors are cautioned
that any such statements are not guarantees of future performance
and those actual results or developments may differ materially from
those projected in the forward-looking statements. For more
information on the Company, Investors should review the Company's
registered filings available at sedar.com.
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accept responsibility for the adequacy or
accuracy of this release.
SOURCE Frontier Lithium Inc.