Sama Resources Inc. ("Sama" or the "Company") (TSX VENTURE:SME) is pleased to
announce that the Phase II drilling program was completed in late November 2011,
with the 2 last holes drilled at the "Samapleu Extension 1 poly-metallic
deposit" returning excellent mineralization. Borehole SM25-009620, located at
the northeast end of the known mineralized strike, intersected 45 metres ("m")
of highly disseminated sulphide mineralization starting from 33 m vertically
from surface with an additional zone of 2.6 m of massive sulphides
mineralization at 127 m from surface. Borehole SM24-627794, located at the
southwest end of the known strike and 277 m from the previous one, returned 28.6
m of disseminated to highly disseminated sulphide mineralization including a
combined 2.5 m of massive sulphide zones, starting from 35 m from surface. True
widths of these mineralized zones have not been established at this point.


From March 2010 to November 2011, Sama has established a 200 line/kilometre
("km") grid layout, performed a 121 line/km surface geophysical Induced
Polarization survey ("IP"), a 132 line/km surface Magnetometer survey and 198
boreholes, for a total of 20,994 m of drilling on Exploration Permit PR123. All
together,70 boreholes, for at total of 10,272 m have drilled at the Samapleu
Main deposit on a 50 m by 25 m drill spacing. The Samapleu Extension 1 was
discovered by Sama in June 2010 after drilling surface IP anomalies. Thirty-two
boreholes for a total of 5,577 m have been drilled at Samapleu Extension 1 on
grid spacing ranging from 25 m x 25 m to 50 m x 50 m and larger. Sama has also
completed 80 boreholes for a total of 2,663 m at the "Sipilou South
Nickel-Cobalt laterite deposit" located 5 km north of the Samapleu deposits.
Drilling was performed on 200 m x 200m spacing.


The mineralization is open at depth at the "Samapleu Main poly-metallic deposit"
and remains untested below 200 m from surface. The mineralization is open at
depth but also along strike at the Samapleu Extension 1 deposit.


With the Phase II drilling program now complete, the process for establishing
mineral resources estimates for these deposits has started and will be completed
upon receiving the last remaining assays results. Assay results are still
pending for a total of 52 boreholes.


Sama's regional compilation and exploration work highlights the very high
prospective potential of the whole area surrounding these known deposits and
beyond. Sama has also discovered a 19 km long northeast-southwest oriented ridge
(Gangbapleu-Bounta Ridge) that contains several outcropping mafic and ultramafic
bodies as well as newly discovered Massive Chromite occurrences in 2 distinct
locations, all of these features, in addition to being of very significant
economic potential by itself, are indicative of a highly favourable geological
environment for additional Samapleu nickel-copper style mineralization.


The newly discovered chromites occurrence forms a 600 m by 350 m feature at
surface outlined by scattered fragments of massive chromite defining the outer
edge. The second discovered occurrence is located in a parallel ridge at 10 km
southwest of the first one, whereby the occurrence outcrops continuously over 12
m. Chrome has been confirmed in grades and chrome-to-iron ratios that are
comparable to grades and ratios of known chromites deposits using a Niton XRF
portable analyzer. Samples are being sent to a recognized assay laboratory for
standard assay procedures. Assays will be reported when received. Chromites are
used in Ferro-Chrome alloy and it is produced in several countries. 


Field investigations and detailed geological mapping are ongoing at both
locations. Mineralogical determination, under the supervision of Dr Christian
Picard of the University of Franche-Comte, France, is ongoing.


Lola Project, Republic of Guinea

The Lola Project encompasses 1,212 square km ("km2") of fully-owned, highly
prospective properties in the Republic of Guinea, West Africa. The Guinean
permits were acquired to cover the extensions in Guinea of the very large
laterite nickel-colbalt deposits with additional massive sulphide potential
discovered in adjacent Cote d'Ivoire. Dr Audet first identified this potential
while working on adjacent permits in Cote d'Ivoire in the 1990s.


The exploration program performed this year has identified 14 new laterite
plateaus ranging from 0.06 km2 to 1.8 km2 for a total of 5.34 km2 of highly
prospective laterite plateaus, including the 1.8 km2 large Gogota laterite
plateau. Field investigation has covered only 30% of the 1,212 km2 license area.
Drilling exploration work is due to start at the Gogota plateau in February
2012, with the Company's newly purchased man-portable drilling equipment. Sama
has filed an Exploration Permit application for an additional 250 km2.


The Company's exploration program also includes an extensive stream sediment
sampling program covering areas with similar mafic to ultramafic rock types that
host the Samapleu deposits in Cote d'Ivoire.


Sama Resources Commitments and Work Program

While continuing to explore for additional new nickel and copper occurrences, as
well as reducing the drill spacing at the Sipilou South Nickel-Cobalt laterite
deposit, Sama's objective is to launch a Preliminary Economic Assessment Study
("PEA"), within the first half of 2012 on the viability of an open-pit mining
operation at the known Samapleu Main and Samapleu Extension 1 deposits. The
scope of the PEA still needs to be detailed and will be based on the final
outcome of the mineral resources estimate currently ongoing. However, it is
expected that the PEA will aim at investigating the viability of an opencast
mining operation with processing through an upgrading circuit followed by a
classic flotation circuit producing a nickel+copper concentrate. The concentrate
will be delivered to San-Pedro port using the existing highway network.


Drilling was performed by Global Exploration Services SARL of Abidjan, Cote
d'Ivoire. Core logging and sampling was performed at Sama's facility in
Yorodougou village. Sample preparations for the nickel-copper sulphide
exploration program were performed at Societe de Developpement de Gouessesso's
sample preparation facility in Gouessesso village under Sama's supervision.
Sample pulps were delivered to Bureau Veritas Mineral Laboratory's facility in
Abidjan ("BVML") and then dispatched by BVML directly to their assay laboratory,
Ultra Trace Pty, in Perth, Australia. All samples are assayed for nickel,
copper, cobalt, iron, sulphur, platinum, palladium, rhodium and gold using
sodium peroxide fusion and determined by inductively coupled plasma optical
emission spectrometry. All samples for the nickel-cobalt laterite programs were
delivered to BVML for sample preparation and then dispatched to Ultra Trace Pty,
in Perth, Australia. All samples are assayed for nickel, cobalt, scandium and
all major oxides using peroxide fusion XRF.


The Samapleu Nickel-Copper Sulphide Project in Cote d'Ivoire is currently in its
exploration phase. Future production will be managed by a joint venture
controlled 66 2/3% by Sama Nickel Corporation, a wholly-owned subsidiary of the
Company, and 33 1/3% by SODEMI. The exploration licences for the Lola Project in
Guinea are exclusively held by a wholly-owned branch office of Sama.


This news release was prepared by Dr. Marc-Antoine Audet, P.Geo., President and
CEO of Sama, acting as a Qualified Person under National Instrument 43-101.


Forward-Looking Statements

Certain of the statements made and information contained herein are
"forward-looking statements" within the meaning of Canadian securities
legislation or "forward-looking information" within the meaning of the Ontario
Securities Act and the Securities Act (British Columbia). This includes
statements concerning the Company's plans at its mineral properties, which
involve known and unknown risks, uncertainties and other factors which may cause
the actual results, performance or achievements of the Company, or industry
results, to be materially different from any future results, performance or
achievements expressed or implied by such forward-looking statements or
forward-looking information. Information regarding drilling results may also be
deemed to be forward-looking statements or forward-looking information in that
they reflect a prediction of what may be found to be present when and if a
project is actually developed.


Forward-looking statements and forward-looking information are subject to a
variety of risks and uncertainties which could cause actual events or results to
differ from those reflected in the forward-looking statements or forward-looking
information, including, without limitation, the availability of financing for
activities, risks and uncertainties relating to the interpretation of drill
results, the geology, grade and continuity of mineral deposits, the possibility
that future exploration, development or mining results will not be consistent
with the Company's expectations, metal price fluctuations, environmental and
regulatory requirements, availability of permits, escalating costs of
remediation and mitigation, risk of title loss, the effects of accidents,
equipment breakdowns, labour disputes or other unanticipated difficulties with
or interruptions in exploration or development, the potential for delays in
exploration or development activities, the inherent uncertainty of cost
estimates and the potential for unexpected costs and expenses, commodity price
fluctuations, currency fluctuations, expectations and beliefs of management and
other risks and uncertainties.


In addition, forward-looking statements and forward-looking information are
based on various assumptions. Should one or more of these risks and
uncertainties materialize, or should underlying assumptions prove incorrect,
actual results may vary materially from those described in forward-looking
information or forward-looking statements. Accordingly, readers are advised not
to place undue reliance on forward-looking statements or forward-looking
information. Except as required under applicable securities legislation, the
Company undertakes no obligation to publicly update or revise forward-looking
statements or forward-looking information, whether as a result of new
information, future events or otherwise.


Inca Pacific Resources (TSXV:IP)
Historical Stock Chart
From Jun 2024 to Jul 2024 Click Here for more Inca Pacific Resources Charts.
Inca Pacific Resources (TSXV:IP)
Historical Stock Chart
From Jul 2023 to Jul 2024 Click Here for more Inca Pacific Resources Charts.