- High-Grade Ruth Vein Adjacent to Open-Pit Intercepts 15.2
Meters of 9.11 gpt Gold and 85.99 gpt Silver Including 6.1 Meters
of 21.8 gpt Gold & 211.48 gpt Silver; and 1.5 Meters of 69.3
gpt Gold (2.02 ounces of Gold) & 716 gpt Silver, HIGH GRADES
TYPICAL OF ORE SHOOTS MINED IN THE OATMAN DISTRICT
- Emerging Discovery at West
Oatman; Drilling Intercepts of 53.3 Meters of 0.81 gpt Gold
& 14.77 gpt Silver
- Significant Gold Grades Intercepted on Strike and 1.2 Km
West of Current Open pit
VANCOUVER, BC, Aug. 12, 2020 /CNW/ - Northern Vertex
Mining Corp. (TSX.V: NEE) (OTC Nasdaq Intl.:
NHVCF) (the "Company" or "Northern Vertex") is
pleased to announce initial results from the multi-phase drilling
and resource expansion program (the "Program") underway at the Moss
Mine in NW Arizona. Drilling has
successfully intercepted high-grade gold and widespread district
scale mineralization within a 2-kilometer radius of mining
operations. The Moss Mine land holdings are contained within
Arizona's historic Oatman Mining
District, recognized for its numerous high-grade gold
discoveries.
Ken Berry, President & CEO
stated: "We are very pleased to report high-grade gold results
and widespread gold and silver mineralization from our current
drilling and resource expansion program at Moss. Importantly,
results from the Gold Bridge and
Ruth Vein areas underscore the potential for the unification of the
west and center pits and expansion of the center pit to the south
to incorporate the former producing, high-grade Ruth Vein.
Moreover, results within the West Extension show good continuity to
the current resource with sporadic higher-grade intersections along
a strike-length of more than 1.2 kilometers. We believe continued
drilling within this area has the potential to add significant gold
ounces to the Moss Mine Resource. Results at West Oatman show excellent potential for both
high-grade and bulk tonnage mineralization. This area is
considered as a prime target for a maiden resource and expansion of
active operations as the emerging West
Oatman trend is only two kilometers south of the active
leach pad."
Initial results from Northern Vertex's drill campaign, follows
three consecutive quarters of increased gold production and record
revenues for the quarter ended June 30,
2020 at the Moss Gold Mine (see news release dated
July 14, 2020). To date, the Company
has completed 54 holes from its ongoing drill program totaling
6,902 meters, and has received results from 34 holes highlighted by
the following drilling information:
High-Grade Gold Intercepted in Ruth Vein in Close Proximity
to Moss Open pit
- Hole AR20-286R returned 15.2 meters of 9.11 gpt gold and
85.99 gpt silver including 6.1 meters of 21.8 gpt gold
and 211.48 gpt silver and 1.5 meters of 69.3 gpt gold
(2.02 ounces of gold) and 716 gpt silver within;
(estimated true width is calculated to be 85% of the drilled
intercept).
- Hole AR20-255R returned 3.0 meters of 3.73 gpt gold
and 22.85 gpt silver.
Resource Expansion within the 5.6Km Mineralized Moss
Vein
- Hole AR20-251R returned 6.1 meters of 0.93 gpt gold in
the West Extension area, representing significant mineralization on
strike and 1.2 km to the west of the current boundary of the Moss
open-pit
- Holes AR20-246R intercepted 21.3 meters of 0.57 gpt gold
and AR20-248R returned 25.9 meters of 0.5 gpt gold indicating
extensive mineralization at Gold
Bridge, located in the pillar between the Center pit and the
West pit
- Hole AR20-253R in Midwest returned intercepts of 45.7 meters
of 0.323 gpt gold and 1.21 gpt silver; 4.6 meters of 0.442
gpt gold and 1.53 gpt silver; 3.0 meters of 1.182 gpt
gold and 0.7 gpt silver and 4.6 meters of 0.539 gpt gold
and 0.76 gpt silver. Hole AR20-253R, located in Midwest, was
drilled into disseminated mineralization over a wide area for which
insufficient information is available at this stage to determine
deposit characteristics and true width of the intercept.
Emerging Discovery to Feed Hub & Spoke Production
Model
- Hole AR20-259R at the West
Oatman intercepted 53.3 meters of 0.81 gpt gold and
14.77 gpt silver including 10.7 meters of 2.22 gpt
gold and 55.13 gpt silver. Currently there is
insufficient information to determine the true width of the
intercept.
Drilling Discussion and Assay Results Overview
The Program continues with two reverse circulation drill rigs,
which are expected to remain on the property until October
2020. The Program has focused on several high-priority
exploration targets, which include:
- Ruth Vein: a high-grade gold vein with historic
production, which runs parallel to the Moss Mine open pit
- Gold Bridge Zone: mineralized area between the Center
and West pits
- West and Midwest Extensions: 1.7km mineral trend
adjacent to current operations and on strike with the Moss
Vein
- West Oatman: 3km
mineral trend located approximately 2km south from the Moss mineral
trend
- Eastern Extension: 1.5-kilometer mineral trend adjacent
to current Moss Mine Operations
The Ruth Vein
The Ruth Vein is a former producing high-grade vein
subparallel to the Moss Vein and dipping north back towards the
Moss Vein. An objective of the 2020 drill program is to find
high-grade ore shoots within the Ruth Vein and to test the downdip
intersection of the Ruth and Moss veins, with the goal of
developing higher grade resources and expanding the pit to the
south. The Ruth Vein outcrops less than 500 feet south of the
Center open-pit boundary. Current drilling demonstrates
continuous down-dip gold mineralization from a surface outcrop for
at least 260 feet longitudinally and to at least 215 feet below the
surface. Eight holes have been completed to date, testing the
strike and depth of the Ruth Vein with assays having been received
for three holes and are provided in the table below.
Gold Bridge Zone
Gold Bridge lies between the
Center pit (active mining) and the West pit (active pioneering) and
previously was considered a waste pillar. Drilling is
designed to infill the gap in previous drilling, with the objective
of proving continuous mineralization between the two planned pits
to add gold ounces to the Moss resource and facilitate combining
the pits into one. In addition to intersecting significant
and consistent tonnage above cut-off grade, drilling in this
area has shown significant stockwork veining up to 500 feet into
the Moss Vein hanging wall with gold grades up to 1.86 gpt.
Several holes drilled to the south showed gold mineralization
continuing at depth. Assays have been received for 6 of 16 holes
drilled in the Gold Bridge Zone, with the results presented in the
table below.
The West Extension
The West Extension of the Moss Vein is a 1.7
kilometer-long zone of vein and stockwork veining along the Moss
structure west of the West Pit. Numerous vein stockworks have
been observed in outcrop in the area and there is potential to add
significant tons and gold ounces to the Moss mine resource in this
area. To date, only the first 1.2 kilometers of observed
strike length have been tested.
Hole AR20-253R was drilled furthest to the west into stockwork
veining at the Midwest Extension. Several holes were drilled
between AR20-253R and the current mining operations including one
hole at the Mordor Vein, and two widely spaced wildcat holes along
the mineralized corridor. Significant assay results are
presented in the table below.
West Oatman Prospect
The West Oatman
prospect is a vein and breccia system situated 2.5 kilometer
south of the Moss Mine. Shallow drilling of the target
by Northern Vertex in 2017 encountered 8 to 20-meter-thick sections
of mineralization with several high-grade internal zones (up to 12
gpt gold). One deeper hole, AR20-259R was completed by the
Company to test thick mineralization previously drilled by Reynolds
Metals in 1992. This hole encountered a very thick section of
medium grade with a high-grade core. Significant assay
results for drilling completed in 2020 at the West Oatman prospect are presented in the
table below.
Eastern Extension
The Eastern Extension is a continuation of the Moss Vein to the
east of the current mining operations. Only shallow drilling has
been completed to date and returned results of only narrow
low-grade mineralized intervals within the Moss Vein structure near
surface. Two additional exploration drill holes were completed in
the Far East Extension which targeted the intersection of the
New York and Moss Veins in areas
not previously drilled. It is presumed that the collar locations
were in a non-mineralized portion of the vein, and ore shoots have
the potential to exist at depth and along strike.
Moss Detailed Drill Results:
Click the following link to view: Drill Plan Map, Plan Map of
Cross Sections and Cross Sections for Holes AR20-286R, 255R, 256R
& 268R. Click here to view: further drill
information such as azimuth and dip.
Location
|
Hole
ID
|
From
(m)
|
To
(m)
|
From
(ft)
|
To
(ft)
|
Length
(m)
|
Length
(ft)
|
Gold
(gpt)
|
Silver (gpt)
|
Ruth
|
AR20-255R
|
42.67
|
57.91
|
140
|
190
|
15.24
|
50
|
1.11
|
6.85
|
including
|
53.34
|
56.38
|
175
|
185
|
3.0
|
10
|
3.73
|
22.85
|
AR20-256R
|
57.91
|
79.25
|
190
|
260
|
21.3
|
70
|
0.6
|
4.05
|
including
|
67.05
|
70.1
|
220
|
230
|
3.1
|
10
|
1.95
|
10.55
|
AR20-265R
|
57.95
|
61
|
190
|
200
|
3.1
|
10
|
0.57
|
0.25
|
AR20-266R
|
67.1
|
71.68
|
220
|
235
|
4.6
|
15
|
0.57
|
0.57
|
AR20-268R
|
47.275
|
67.1
|
155
|
220
|
19.8
|
65
|
1.55
|
7.06
|
including
|
57.95
|
65.58
|
190
|
215
|
7.6
|
25
|
3.35
|
15.0
|
AR20-286R
|
36.6
|
51.8
|
120
|
170
|
15.2
|
50
|
9.11
|
85.99
|
including
|
38.125
|
44.23
|
125
|
145
|
6.1
|
20
|
21.8
|
211.48
|
|
39.65
|
41.18
|
130
|
135
|
1.5
|
5
|
69.3
|
716
|
Location
|
Hole
ID
|
From
(m)
|
To
(m)
|
From
(ft)
|
To
(ft)
|
Length
(m)
|
Length
(ft)
|
Gold
(gpt)
|
Silver
(gpt)
|
Gold
Bridge
|
AR20-245R
|
0.00
|
10.67
|
0
|
35
|
10.67
|
35
|
0.447
|
5.90
|
|
38.10
|
44.20
|
125
|
145
|
6.10
|
20
|
0.568
|
10.65
|
|
80.83
|
88.39
|
265
|
290
|
7.56
|
25
|
0.674
|
6.18
|
|
100.58
|
118.87
|
330
|
390
|
18.29
|
60
|
0.552
|
13.59
|
AR20-246R
|
0.00
|
21.34
|
0
|
70
|
21.34
|
70
|
0.569
|
8.20
|
including
|
13.72
|
16.76
|
45
|
55
|
3.04
|
10
|
1.343
|
28.05
|
|
131.06
|
137.2
|
430
|
450
|
6.10
|
20
|
0.611
|
13.30
|
AR20-247R
|
10.67
|
21.33
|
35
|
70
|
10.66
|
35
|
0.370
|
4.41
|
|
51.81
|
56.39
|
170
|
185
|
4.58
|
15
|
0.389
|
7.74
|
|
74.67
|
91.44
|
245
|
300
|
16.77
|
55
|
0.438
|
5.69
|
|
100.58
|
111.25
|
330
|
365
|
10.67
|
35
|
0.445
|
3.97
|
including
|
108.20
|
111.25
|
355
|
365
|
3.05
|
10
|
0.828
|
4.95
|
AR20-248R
|
0.00
|
25.91
|
0
|
85
|
25.91
|
85
|
0.498
|
7.67
|
|
19.81
|
24.38
|
65
|
80
|
4.57
|
15
|
1.102
|
18.70
|
AR20-249R
|
6.10
|
10.67
|
20
|
35
|
4.57
|
15
|
0.449
|
1.90
|
|
33.53
|
60.96
|
110
|
200
|
27.43
|
90
|
0.395
|
5.63
|
including
|
48.77
|
56.39
|
160
|
185
|
7.62
|
25
|
0.572
|
10.12
|
AR20-250R
|
22.86
|
42.67
|
75
|
140
|
19.81
|
65
|
0.381
|
5.06
|
AR20-267R
|
10.67
|
16.76
|
35
|
55
|
6.10
|
20
|
0.723
|
0.80
|
|
24.38
|
28.96
|
80
|
95
|
4.57
|
15
|
0.399
|
0.57
|
|
39.62
|
47.24
|
130
|
155
|
7.62
|
25
|
0.409
|
1.14
|
AR20-270R
|
6.10
|
22.86
|
20
|
75
|
16.8
|
55
|
0.523
|
1.09
|
including
|
6.1
|
10.67
|
20
|
35
|
4.6
|
15
|
1.440
|
2.13
|
|
67.05
|
73.15
|
220
|
240
|
6.1
|
20
|
0.828
|
23.35
|
|
96.075
|
99.13
|
315
|
325
|
3.1
|
10
|
0.370
|
0.90
|
AR20-271R
|
0
|
6.1
|
0
|
20
|
6.1
|
20
|
0.570
|
0.65
|
|
61
|
68.63
|
200
|
225
|
7.6
|
25
|
0.763
|
8.18
|
including
|
64.05
|
65.58
|
210
|
215
|
1.5
|
5
|
1.898
|
4.70
|
AR20-272R
|
7.625
|
13.73
|
25
|
45
|
6.1
|
20
|
0.356
|
0.85
|
AR20-273R
|
0
|
4.575
|
0
|
15
|
4.6
|
15
|
0.578
|
4.53
|
|
32.025
|
44.23
|
105
|
145
|
12.2
|
40
|
1.045
|
3.00
|
including
|
32.025
|
35.08
|
105
|
115
|
3.1
|
10
|
2.722
|
5.60
|
|
85.4
|
100.7
|
280
|
330
|
15.3
|
50
|
0.353
|
0.82
|
AR20-274R
|
0
|
3.05
|
0
|
10
|
3.1
|
10
|
0.460
|
2.40
|
|
32.025
|
35.08
|
105
|
115
|
3.1
|
10
|
0.577
|
0.70
|
|
48.8
|
61
|
160
|
200
|
12.2
|
40
|
0.412
|
1.10
|
AR20-275R
|
33.55
|
54.9
|
110
|
180
|
21.4
|
70
|
1.11
|
25.84
|
including
|
42.7
|
50.33
|
140
|
165
|
7.6
|
25
|
2.47
|
60.24
|
AR20-276R
|
0
|
24.4
|
0
|
80
|
24.4
|
80
|
0.37
|
2.23
|
including
|
0
|
4.575
|
0
|
15
|
4.6
|
15
|
0.72
|
6.9
|
AR20-279R
|
19.825
|
25.93
|
65
|
85
|
6.1
|
20
|
0.69
|
1.08
|
including
|
21.35
|
22.88
|
70
|
75
|
1.5
|
5
|
1.46
|
1.2
|
AR20-280R
|
4.575
|
15.25
|
15
|
50
|
10.7
|
35
|
0.98
|
5.11
|
including
|
7.625
|
12.2
|
25
|
40
|
4.6
|
15
|
1.74
|
7.0
|
|
67.1
|
122
|
220
|
400
|
54.9
|
180
|
0.43
|
7.33
|
including
|
73.2
|
89.98
|
240
|
295
|
16.8
|
55
|
0.39
|
3.78
|
including
|
102.18
|
114.4
|
335
|
375
|
12.2
|
40
|
0.87
|
17.74
|
Location
|
Hole
ID
|
From
(m)
|
To
(m)
|
From
(ft)
|
To
(ft)
|
Length
(m)
|
Length
(ft)
|
Gold
(gpt)
|
Silver
(gpt)
|
West
Extension
|
AR20-251R
|
12.19
|
18.29
|
40
|
60
|
6.1
|
20
|
0.93
|
3.65
|
|
53.34
|
77.72
|
175
|
255
|
24.4
|
80
|
0.36
|
1.21
|
AR20-252R
|
No Significant
Intersection
|
AR20-253R
|
15.24
|
60.96
|
50
|
200
|
45.7
|
150
|
0.32
|
1.21
|
including
|
22.86
|
32
|
75
|
105
|
9.1
|
30
|
0.44
|
2.13
|
|
68.58
|
73.15
|
225
|
240
|
4.6
|
15
|
0.44
|
1.53
|
|
94.49
|
97.53
|
310
|
320
|
3.0
|
10
|
1.18
|
0.7
|
|
114.3
|
118.9
|
375
|
390
|
4.6
|
15
|
0.54
|
0.76
|
AR20-254R
|
32
|
44.2
|
105
|
145
|
12.2
|
40
|
0.37
|
3.26
|
including
|
42.67
|
44.19
|
140
|
145
|
1.5
|
5
|
1.08
|
11.4
|
|
94.49
|
118.9
|
310
|
390
|
24.4
|
80
|
0.4
|
0.84
|
including
|
109.73
|
118.9
|
360
|
390
|
9.1
|
30
|
0.66
|
0.72
|
Location
|
Hole
ID
|
From
(m)
|
To
(m)
|
From
(ft)
|
To
(ft)
|
Length
(m)
|
Length
(ft)
|
Gold
(gpt)
|
Silver
(gpt)
|
West
Oatman
|
AR20-259R
|
68.58
|
121.9
|
225
|
400
|
53.3
|
175
|
0.81
|
14.77
|
including
|
91.44
|
102.1
|
300
|
335
|
10.7
|
35
|
2.22
|
55.13
|
including
|
100.58
|
102.1
|
330
|
335
|
1.5
|
5
|
9.78
|
275
|
RC Holes Completed
with No Significant Results
|
Location
|
Hole
ID
|
From
(m)
|
To
(m)
|
From
(ft)
|
To
(ft)
|
Length
(m)
|
Length
(ft)
|
Gold
(gpt)
|
Silver
(gpt)
|
Mid East
Ext
|
AR20-257R
|
No Significant
Intersection
|
Mid East
Ext
|
AR20-258R
|
No Significant
Intersection
|
East Ext
|
AR20-260R
|
No Significant
Intersection
|
East Ext
|
AR20-261R
|
No Significant
Intersection
|
East Ext
|
AR20-262R
|
No Significant
Intersection
|
East Ext
|
AR20-263R
|
No Significant
Intersection
|
East Ext
|
AR20-264R
|
No Significant
Intersection
|
Hole AR20-286 Detailed Drill Results:
SAMPLE
ID
|
From
(m)
|
To (
m)
|
From
(ft)
|
To
(ft)
|
Gold
(gpt)
|
Silver
(gpt)
|
AR20-286_
115-120
|
35.1
|
36.6
|
115
|
120
|
0.011
|
0.5
|
AR20-286_
120-125
|
36.6
|
38.1
|
120
|
125
|
0.732
|
1.3
|
AR20-286_
125-130
|
38.1
|
39.7
|
125
|
130
|
9.39
|
110.1
|
AR20-286_
130-135
|
39.7
|
41.2
|
130
|
135
|
69.3
|
716
|
AR20-286_
135-140
|
41.2
|
42.7
|
135
|
140
|
5.33
|
16.7
|
AR20-286_
140-145
|
42.7
|
44.2
|
140
|
145
|
3.114
|
3.1
|
AR20-286_
145-150
|
44.2
|
45.8
|
145
|
150
|
0.828
|
6.3
|
AR20-286_
150-155
|
45.8
|
47.3
|
150
|
155
|
0.415
|
1.2
|
AR20-286_
155-160
|
47.3
|
48.8
|
155
|
160
|
0.356
|
1
|
AR20-286_
160-165
|
48.8
|
50.3
|
160
|
165
|
0.302
|
1.1
|
AR20-286_
165-170
|
50.3
|
51.9
|
165
|
170
|
1.312
|
3.1
|
AR20-286_
170-175
|
51.9
|
53.4
|
170
|
175
|
0.194
|
0.3
|
AR20-286_
175-180
|
53.4
|
54.9
|
175
|
180
|
0.158
|
0.4
|
AR20-286_
180-185
|
54.9
|
56.4
|
180
|
185
|
0.043
|
0.3
|
AR20-286_
185-190
|
56.4
|
58.0
|
185
|
190
|
0.112
|
0.5
|
AR20-286_
190-195
|
58.0
|
59.5
|
190
|
195
|
0.275
|
0.4
|
AR20-286_
195-200
|
59.5
|
61.0
|
195
|
200
|
3.081
|
8.5
|
AR20-286_
200-205
|
61.0
|
62.5
|
200
|
205
|
0.897
|
0.6
|
AR20-286_
205-210
|
62.5
|
64.1
|
205
|
210
|
0.084
|
0.3
|
AR20-286_
210-215
|
64.1
|
65.6
|
210
|
215
|
0.564
|
0.6
|
AR20-286_
215-220
|
65.6
|
67.1
|
215
|
220
|
0.103
|
0.2
|
AR20-286_
220-225
|
67.1
|
68.6
|
220
|
225
|
0.258
|
0.2
|
QA/QC
Samples of drill cuttings were
collected by the drilling crew using a wet rotary splitter to
ensure a representative sample of each five-foot interval. Field
notes were recorded for each sample documenting what was sampled
and how the sample was taken. Samples were collected in bags with a
sample tag inserted and delivered to a secure on-site location
prior to pick-up by Skyline Labs, a commercial laboratory in
Tucson, Arizona. Skyline
Labs is an ISO 9001:2008 qualified assay lab that uses and makes
available internal assaying controls. Quality control
consisted of one certified gold standard, one blank, and one
duplicate sample inserted into every 20 samples submitted to
Skyline Labratories.
At the lab, rock samples are dried, crushed and pulverized to
85% passing through a 200-mesh sieve. The pulps are assayed for
gold using a 30 g split, Fire Assay (FA) and Atomic Absorption (AA)
finish. Over limit assays for both gold and silver (10 gpt for gold
and 100 gpt for silver) were rerun using a gravimetric procedure.
Rejects and pulps are stored at Golden Vertex's warehouse in
Bullhead City for future
reference.
Qualified Person
The foregoing technical information contained in this news
release has also been reviewed and verified by Mr. Joseph Bardswich, P.Eng., a director of the
Company and a Qualified Person ("QP") for the purpose of National
Instrument 43-101 (Disclosure Standards for Mineral Projects).
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
About Northern Vertex Mining Corp.
Northern Vertex Mining Corp. is focused on low cost gold and
silver production at its 100% owned Moss Mine in NW Arizona. The Company has experience across
all areas of operations, mine development, exploration,
acquisitions, and financing of mining projects. With operations at
the flagship Moss Mine achieving commercial production the Company
intends to consolidate additional producing or near-term production
gold assets within the Western US. Through mergers and acquisitions
Northern Vertex's corporate goal is to become a mid-tier gold
producer.
ON BEHALF OF THE BOARD OF NORTHERN VERTEX
"Kenneth
Berry"
President & CEO
Cautionary Note Regarding Forward-Looking
Statements:
This news release contains statements about our future
business and planned activities. These are "forward-looking"
because we have used what we know and expect today to make a
statement about the future. Forward-looking statements including
but are not limited to comments regarding the timing and content of
upcoming work and analyses. Forward-looking statements usually
include words such as scheduled, may, intend, plan, expect,
anticipate, believe or other similar words. Forward-looking
statements are necessarily based upon a number of factors and
assumptions that, while considered reasonable by the Company as of
the date of such statements, are inherently subject to significant
business, economic and competitive uncertainties, and
contingencies. Many factors, known and unknown, could cause
actual results to be materially different from those expressed or
implied by such forward-looking statements. We believe the
expectations reflected in these forward-looking statements are
reasonable. However, actual events and results could be
substantially different because of the risks and uncertainties
associated with our business or events that happen after the date
of this news release. Readers are cautioned not to place undue
reliance on forward-looking statements, which speak only as of the
date made. As a general policy, we do not update forward-looking
statements except as required by securities laws and
regulations. US investors should be aware that mining
terminology used for Canadian mineral project reporting purposes
differs significantly from US
terminology.
2020 number 15
View original content to download
multimedia:http://www.prnewswire.com/news-releases/northern-vertex-intercepts-high-grade-mineralization-of-21-8-gpt-gold--211-48-gpt-silver-over-6-1-meters-including-69-3-gpt-2-02-oz-gold--716-gpt-silver-over-1-5-meters-at-moss-mine-arizona-301111081.html
SOURCE Northern Vertex Mining Corp.