TORONTO, Jan. 29, 2021 /CNW/ - Orefinders Resources
Inc. ("Orefinders" or the "Company") (TSX.V: ORX) is pleased report
its latest results including a high-grade intercept in drill hole
TYR20-004 of 15.6 g/t gold over 3.6m on its 100% owned
Knight Project in the Shining Tree Greenstone Belt, 110km southwest
of Kirkland Lake, Ontario.
Newly received results from drill hole TYR20-004 define two
mineralized intervals (Table 1).
1. 15.6 g/t gold over 3.6m between 604.4m and 608m
downhole.
- The intersection is hosted by sheared metavolcanic rocks 200
metres below the mine's previously excavated zone and approximately
80 metres to the north of previous reported mineralized intervals
from drill hole TYR20-001 (News Release of November 5, 2020).
- This high-grade intersection is hosted by a sheared zone within
the footwall (about 60 metres structurally below) the historically
mined Tyranite fault structure. The footwall structure hosting that
mineralized zone may be linked to a similar structure that deforms
a syenitic intrusive body in drill hole TYR20-001 and that hosts a
previously reported mineralized interval in that drill hole.
Ongoing structural analysis should validate that interpreted
structural continuity.
- This mineralized interval includes an assay of 42.1 g/t over
0.8 m (Table 1).
2. 2.2 g/t gold over 9.0m between 530m and 539m
downhole.
- The mineralized interval is hosted by sheared metavolcanic
rocks within the Tyranite fault structure, which was the primary
target of the drill hole and about 145 metres below the mine's
previously excavated zone.
- The mineralized interval includes two higher grade assays for 1
metre sample lengths including 4.6 g/t from 530 metres; 6.9 g/t
from 538m.
Assay Laboratory Delays
Orefinders would like to
update shareholders that it has faced significant delays in the
receipt of its assays results. The Company has kept in close
communications with the laboratory which has communicated that the
previous backlog of results is expected to improve
substantially.
Drilling of TYR20-004 was completed on November 20, 2020; the samples for which the
results are reported here were received by the assay laboratory on
November 27, 2020 and the results
were returned from the assay laboratory on January 27, 2021.
Table 1.
Mineralized Intervals from Drill Hole TYR20-004
|
From
(m)
|
To
(m)
|
Sample
Length (m)
|
Assay Result
(g/t)
|
Interval
Grade (g/t)
|
Interval
Length (m)
|
|
|
|
|
|
|
530
|
531
|
1
|
4.6
|
|
|
531
|
532
|
1
|
1.2
|
|
|
532
|
533
|
1
|
1.9
|
|
|
533
|
534
|
1
|
0.8
|
|
|
534
|
535
|
1
|
0.6
|
|
|
535
|
536
|
1
|
0.1
|
|
|
536
|
537
|
1
|
1.6
|
|
|
537
|
538
|
1
|
1.9
|
|
|
538
|
539
|
1
|
6.9
|
2.2
|
9.0
|
|
|
|
|
|
|
604.4
|
605.4
|
1
|
13.4
|
|
|
605.4
|
606.2
|
0.8
|
42.1
|
|
|
606.2
|
607
|
0.8
|
8.8
|
|
|
607
|
608
|
1
|
2.1
|
15.6
|
3.6
|
Further Technical Detail on TYR20-004 and Ongoing Drilling at
the Knight Gold Project
TYR20-004 was designed primarily to
validate the continuity, at depth, of the mineralized Tyranite
Shear structure beneath the historical workings at the Tyranite
Mine, which represents one of several drill target zones at the
Knight Gold Project.
The mineralized intervals reported here are grade composites
calculated using the Leapfrog Geo 3-D modeling software platform
and applying a 2.0 g/t cut-off grade for composited intervals.
The drilling program at Knight is focused on three target zones
described in a news release dated October
15, 2020. They include the Tyranite mine zone, the Porphyry
Lake zone (including several Minto-style targets) and the Duggan
West zone. The thirteen drill holes planned for the Tyranite target
zone have now been completed and drilling commenced on the Porphyry
Lake target zone on January 26, 2021.
Orefinders looks forward to reporting further results for Tyranite
as assays are returned from the assay laboratory.
QP Statement
The technical information in this news
release has been reviewed and approved by Dr. Keith Benn, P.Geo., Vice President Exploration
for Orefinders, a Qualified Person as defined in "National
Instrument 43-101, Standards of Disclosure for Mineral
Projects." For the exploration undertaken by Orefinders, all
assay batches are accompanied by rigorous Quality Assurance
procedures that include insertion of standards and blanks and
verification assays in a secondary laboratory. Quality
Control results, including the laboratory's control samples, are
evaluated immediately on reception of batch results and corrections
implemented immediately if necessary.
About Orefinders Resources Inc.
Orefinders is a Gold exploration and development company focused
exclusively on the Abitibi Greenstone Belt. The Company is listed
on the Toronto Venture Exchange under the symbol ORX.
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in
the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this
release. Certain information in this press release may contain
forward-looking statements. This information is based on current
expectations that are subject to significant risks and
uncertainties that are difficult to predict. Actual results might
differ materially from results suggested in any forward-looking
statements. Orefinders' assumes no obligation to update the
forward-looking statements, or to update the reasons why actual
results could differ from those reflected in the forward
looking-statements unless and until required by securities laws
applicable to Orefinders. Additional information identifying risks
and uncertainties is contained in filings by Orefinders with
Canadian securities regulators, which filings are available under
Orefinders' profile at www.sedar.com.
For the latest updates, please contact or follow us on Twitter
@OrefindersR
SOURCE Orefinders Resources Inc.