Parlane Commences Drilling at the Big Bear Project in Central British Columbia
November 14 2012 - 9:00AM
Marketwired Canada
Parlane Resource Corp. (TSX VENTURE:PPP) ("Parlane" or the "Company") has
started a core drilling program at the Big Bear property on the Nechako Plateau.
The Company is pleased to announce that drilling has commenced at the Big Bear
property, which is situated between two mineralized systems: New Gold Inc.'s
Blackwater and the Capoose properties.
Five target areas (see Parlane news release Oct. 2, 2012
www.parlaneresource.com) are being drill-tested. The drill sites are easily
accessed by a dense logging road network and it is anticipated that the planned
1,500 metres of core drilling will be completed before the end of December. Core
samples are being sent to an accredited laboratory and results will be reported
as soon as they are available.
The Big Bear property is located in the Omineca Mining Division, Nechako Plateau
in central British Columbia, approximately 100 kilometres south of Vanderhoof,
and contains 14,366 hectares.
Ian Webster, P.Geo. is the Qualified Person as defined by National Instrument
43-101 who has reviewed and approved the contents of this release.
ON BEHALF OF THE BOARD
Robert Eadie, President, Chief Executive Officer and Director
FOR FURTHER INFORMATION PLEASE CONTACT:
Parlane Resource Corp.
Robert Eadie
1-604-602-4935
1-604-602-4936 (FAX)
info@parlaneresource.com
www.parlaneresource.com
Prospector Metals (TSXV:PPP)
Historical Stock Chart
From Nov 2024 to Dec 2024
Prospector Metals (TSXV:PPP)
Historical Stock Chart
From Dec 2023 to Dec 2024