SÃO PAULO, March 19,
2024 /CNW/ -- Sigma Lithium Corporation
("Sigma Lithium" or the "Company") (NASDAQ: SGML,
BVMF: S2GM34, TSXV: SGML), a leading global lithium
producer dedicated to powering the next generation of electric
vehicles with carbon neutral, socially and environmentally
sustainable lithium concentrate, announces today that the Company
and its subsidiary, Sigma Mineração S.A., have received on
March 18th, 2024 an
Initiation Letter of Arbitration by LG Group subsidiary, LG Energy
Solution, Ltd. ("LG-ES") from the International Centre for
Dispute Resolution of the American Arbitration Association.
In its request for arbitration, LG-ES is alleging that Sigma
Lithium is in breach of certain provisions in connection with the
Term-Sheet dated October 5, 2021
relating to offtake arrangements for the purchase of lithium
concentrate from the Company. The Term-Sheet was subject to,
amongst other things, completion of the negotiation
of definitive written agreements between the parties.
The Company believes the claims are completely without merit and
intends to defend its interests vigorously. The Company is subject
to confidentiality obligations regarding these matters, and it will
abstain from commenting further on these proceedings unless
required by applicable law.
Sigma Lithium continues to maintain a good relationship with LG
Group, welcoming on a site visit from March
11th to March
13th 2024 a delegation from LG Group's trading
affiliate LX International organized by KOMIR (a mining agency
under Korea's Ministry of Trade, Industry, and Energy) with the
purpose of initiating a commercial relationship.
ABOUT SIGMA LITHIUM
Sigma Lithium (NASDAQ: SGML, BVMF:
S2GM34, TSXV: SGML) is a leading global lithium producer dedicated
to powering the next generation of electric vehicle batteries with
carbon neutral, socially and environmentally sustainable lithium
concentrate.
Sigma Lithium operates at the forefront of environmental and
social sustainability in the EV battery materials supply chain and
is currently producing Quintuple Zero Green Lithium concentrate
from its Grota do Cirilo Project in Brazil. Phase 1 of the project entered
commercial production in 2Q23 and has an annual capacity of 270,000
tonnes of concentrate (36,700 LCE annually). The Company is
currently evaluating a decision to expand production via a Phase 2
concentrate line and associated mine which would add another
250,000 tonnes of annual Quintuple Zero Green Lithium capacity. The
project produces lithium concentrate at its state-of-the-art
Greentech lithium plant that uses 100% renewable energy, 100%
recycled water and 100% dry-stacked tailings.
Please refer to the Company's National Instrument 43-101
technical report titled "Grota do Cirilo Lithium Project Araçuaí
and Itinga Regions, Minas Gerais, Brazil, Amended and Restated Technical Report"
issued June 12, 2023, which was
prepared for Sigma Lithium by Homero
Delboni Jr., MAusIMM, Promon Engenharia; Marc-Antoine Laporte, P.Geo, SGS Canada Inc;
Jarrett Quinn, P.Eng., Primero Group
Americas; Porfirio Cabaleiro
Rodriguez, (MEng), FAIG, GE21 Consultoria Mineral; and
Noel O'Brien, B.E., MBA, F AusIMM
(the "Updated Technical Report"). The Updated Technical Report is
filed on SEDAR and is also available on the Company's website.
For more information about Sigma Lithium, visit
https://www.sigmalithiumresources.com/
Sigma Lithium
LinkedIn: Sigma Lithium
Instagram: @sigmalithium
Twitter: @SigmaLithium
FORWARD-LOOKING STATEMENTS
This news release includes certain "forward-looking
information" under applicable Canadian and U.S. securities
legislation, including but not limited to statements relating to
timing and costs related to the general business and operational
outlook of the Company, the environmental footprint of tailings and
positive ecosystem impact relating thereto, donation and upcycling
of tailings, timing and quantities relating to tailings and Green
Lithium, achievements and projections relating to the Zero Tailings
strategy, achievement of ramp-up volumes, production estimates and
the operational status of the Groto do Cirilo Project, and other
forward-looking information. All statements that address future
plans, activities, events, estimates, expectations or developments
that the Company believes, expects or anticipates will or may occur
is forward-looking information, including statements regarding the
potential development of mineral resources and mineral reserves
which may or may not occur. Forward-looking information contained
herein is based on certain assumptions regarding, among other
things: general economic and political conditions; the stable and
supportive legislative, regulatory and community environment in
Brazil; demand for lithium,
including that such demand is supported by growth in the electric
vehicle market; the Company's market position and future financial
and operating performance; the Company's estimates of mineral
resources and mineral reserves, including whether mineral resources
will ever be developed into mineral reserves; and the Company's
ability to operate its mineral projects including that the Company
will not experience any materials or equipment shortages, any
labour or service provider outages or delays or any technical
issues. Although management believes that the assumptions and
expectations reflected in the forward-looking information are
reasonable, there can be no assurance that these assumptions and
expectations will prove to be correct. Forward-looking information
inherently involves and is subject to risks and uncertainties,
including but not limited to that the market prices for lithium may
not remain at current levels; and the market for electric vehicles
and other large format batteries currently has limited market share
and no assurances can be given for the rate at which this market
will develop, if at all, which could affect the success of the
Company and its ability to develop lithium operations. There can be
no assurance that such statements will prove to be accurate, as
actual results and future events could differ materially from those
anticipated in such statements. Accordingly, readers should not
place undue reliance on forward-looking information. The Company
disclaims any intention or obligation to update or revise any
forward-looking information, whether because of new information,
future events or otherwise, except as required by law. For more
information on the risks, uncertainties and assumptions that could
cause our actual results to differ from current expectations,
please refer to the current annual information form of the Company
and other public filings available under the Company's profile at
www.sedar.com.
Neither the TSX Venture Exchange nor its Regulation
Services Provider (as that term is defined in the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or
accuracy of this news release.
View original content to download
multimedia:https://www.prnewswire.com/news-releases/sigma-lithium-receives-initiation-letter-of-arbitration-by-lg-es-from-icdr-302093666.html
SOURCE Sigma Lithium