Mining Investments Resources PLC Primorsky Silver Project Update (9867K)
July 01 2014 - 2:00AM
UK Regulatory
TIDMMIR
RNS Number : 9867K
Mining Investments Resources PLC
01 July 2014
Mining Investments Resources plc
Primorsky Silver Project Update
Mining Investments Resources plc ("MIR" or the "Company") is
pleased to announce that the initial assaying results of the
tailings survey at the Taezhny Silver Mine in the Primorsky region
of Russia ("Taezhny Mine") have been provided by SGS Minerals
Services in Chita, Southern Russia. The results have been
calculated for 21 drill holes drilled on a grid of approximately 30
metres, sampled at approximately 1 metre depth intervals.
The average tailings grade based on the drill hole data (length
weighted) is approximately 84 g/t of silver and 0.1 g/t of gold
(non-JORC compliant). The grade of silver equivalent (including the
gold as a by-product based on current gold and silver prices)
indicates a silver equivalent grade of around 90 g/t. This compares
favourably to the average grade calculated by Saint Barbara LLP
from old mine production records of 68 g/t.
MIR's metallurgical testing has the objective of evaluating the
ability to recover silver and gold from the tailings through
gravity and/or additional flotation and whether it would be
advantageous to install cyanide recovery at the Taezhny Mine. The
results of gravity tests on the tailings are expected in the near
future.
Trading in the shares of the Company on AIM was suspended on 20
January 2014 pending the publication of an AIM Admission Document
in respect of the proposed acquisition of the Taezhny Mine or until
such time as the Company decides not to proceed with the
transaction.
Drilling results
Hole Length Av Au Av Ag
(m) (g/t) (g/t)
B 21.7 0.09 71.27
R 8.8 0.17 110.88
H 18.7 0.09 69.98
P 10.1 0.14 123.21
E 20.5 0.09 69.15
G 16 0.09 82.34
Y 14 0.10 74.14
F 16.7 0.09 70.30
I 10 0.076 73.283
L 14 0.12 93.20
D 14 0.11 75.97
N 11.9 0.13 104.87
T 3 0.19 93.01
A 13 0.10 76.45
O 10.9 0.10 87.49
C 24.1 0.10 76.87
K 16.3 0.08 79.76
S 9.9 0.14 108.38
Q 10.3 0.13 134.29
U 8.3 0.13 100.85
M 12 0.08 67.70
All intercepts are from surface to end of hole.
The information contained in this announcement has been reviewed
and approved by Dr Pavel Kepezhinskas on behalf of MIR. Dr
Kepezhinskas is a Director of MIR and is a Qualified Professional
Geologist as defined by the Toronto and Vancouver Stock
Exchanges.
Enquiries
Mining Investments Resources plc
Michael Nosworthy +33 675657274
Steve Roberts 07812043436
Northland Capital Partners Limited (Nomad and Joint Broker)
Matthew Johnson / William Vandyk 020 7382 1100
Peterhouse Corporate Finance Limited (Joint Broker)
Peter Greensmith / Eran Zucker 020 7469 0932
This information is provided by RNS
The company news service from the London Stock Exchange
END
MSCEAKKEDLSLEFF
Mining Inv Re (LSE:MIR)
Historical Stock Chart
From Nov 2024 to Dec 2024
Mining Inv Re (LSE:MIR)
Historical Stock Chart
From Dec 2023 to Dec 2024