Highlights

  * Additional drill results continue to show significant depth and
    strike extensions of high grade gold mineralisation and
    additional hydrothermally altered zones at Tulu Kapi

  * Significant intersection results include 4.0m @ 10.2g/t Au (with
    1.0m @ 37.3 g/t Au), 4.1m @ 5.0g/t Au (with 1.2m @ 14.8g/t Au),
    3.0m @ 5.1g/t Au (with 1.0m @ 12.2g/t Au), 0.6m @ 11.2g/t Au and
    1.0m @ 5.8g/t Au

  * Drilling at the nearby Dina gold prospect shows mineralised
    intersections beneath old workings.

  * Assay results from the adjacent Gudeya-Guji and Guji gold
    prospects are expected in the forthcoming month

Terry Ward,  Managing  Director,  commented  today,  "The  continuing
multiple mineralised intersections with high grade values support the
presence of a widely mineralised system at the Tulu Kapi project. The
initial results at Dina indicate that it may have the potential to be
included with the  Gudeya-Guji and  Guji prospects  in the  potential
establishment of  a  'one treatment  plant  - multiple  feed  sources
scenario'".

Tulu Kapi Prospect (100% Minerva Resources)

Minerva Resources has completed 22 diamond drill holes on a 600m
section of a large gold zone delineated by numerous 1930s mine
workings and more recent exploration activity at its Tulu Kapi gold
prospect in western Ethiopia.

Additional assay results from holes 13 to 17 have been received and
are shown in Appendix A, with the previously announced results from
holes 1 to 12. The results from holes 18 to 22 are expected to be
received over the forthcoming month, delayed due to the excessive
demand on the assay laboratories.

The holes have been drilled, 40m apart, on fence lines at intervals
of 80m along a 600m length of the strike of the deposit on a
north-west/south-east base line. The aim was to examine the depth and
strike continuity and the grades of the altered zones, which were
identified in the initial scout drilling programme.

The deposit is located on the flanks and centre of a large hill,
which rises from an elevation of 1,640m at the base to 1,770m at the
top. A UNDP borehole, drilled in the 1970's, showed a 0.7m @ 27.0g/t
Au intersection some 650m to the north east of the northern most
fence line of the recent drill pattern.

The holes drilled recently confirm a significant depth extension, to
some 200m, of the two altered zones intercepted in the scout drilling
programme and also show several additional altered zones, of varying
thicknesses, beneath these zones. Visible gold is present in a couple
of core sections, while gold nuggets have been picked out of the soil
after rains. Independent preliminary petrographic studies indicate
that the gold mineralisation would give good recoveries using
standard processing techniques.

The zones remain open along strike in both directions and at depth.
Holes 23, 24 and 25 are being drilled at present to investigate the
continuity at depth.

Dina Prospect (100% Minerva Resources)

Reconnaissance work by the Company identified ancient gold workings
at Dina, situated 20km north-west of Tulu Kapi, in an area of
anomalous gold in stream sediments. Several old pits occur on a
northerly trending structure. The structure can be traced over a
strike length of more than 400 metres and over widths of up to 35m.

The initial diamond drill hole, in a three hole scout drilling
programme aimed at targets arising from a ground based geophysical
survey, intersected the expected mineralised target from 146 metres
to 180 metres down hole. The core has been forwarded for assay, with
results expected in the next six weeks.

The second hole has reached a down hole depth of 70 metres and
drilling is continuing. A mineralised quartz vein was intersected
from 46 metres to 70 metres down hole.

Qualified Person

The information in this release which relates to exploration results
is based on information compiled by Chris Wilson, BSc(Hons), PhD,
FAusIMM (CP), FSEG. Dr.Wilson is a consultant to Minerva Resources
and has provided Best Practice and QA/QC training resources to the
Company's geologists in Ethiopia. He is auditing the current drill
programme and is responsible for signing off exploration results for
news releases to the market. Dr. Wilson is a Competent Person as
defined in the Australian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves and has reviewed and approved this
release.


For further information please contact:

Roger Clegg
Minerva Resources plc
Tel: +44 (0)20 76344700
roger.clegg@ambrian.com
web: www.minervaresources.com

Jane Stacey / Ed Portman
Conduit PR
Tel: +44 (0)20 74296606 / (0)7922923306
jane@conduitpr.com

James Joyce
W. H. Ireland
Tel: +44 (0)20 72201666
james.joyce@wh-ireland.co.uk

                             Appendix A


+-------------------------------------------------------------------+
|               Tulu Kapi - Significant Intersections               |
|-------------------------------------------------------------------|
| Hole      |  From  |   To   | Length  |   Au   | Comments         |
| Number    |  (m)   |  (m)   |   (m)   | (g/t)  |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 01   |   10.3 |   20.3 |    10.0 |    2.1 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 02   |  137.3 |  143.0 |     5.7 |    2.9 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  147.9 |  153.9 |     6.0 |    1.9 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 04   |   46.4 |   84.3 |    37.9 |    4.6 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |   46.4 |   84.3 |    37.9 |    1.6 | With 157g/t Au   |
|           |        |        |         |        | cut to 31.1g/t   |
|           |        |        |         |        | Au               |
|-------------------------------------------------------------------|
| Including several 0.3m to 1.1m intersections with grades ranging  |
| from 2.1 to 4.2g/t Au                                             |
|-------------------------------------------------------------------|
| TKBH 05   |   36.7 |   41.9 |     5.2 |    2.7 | Including 3.0m @ |
|           |        |        |         |        | 3.7g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |   71.8 |   75.7 |     3.9 |    2.9 | Including 1.1m @ |
|           |        |        |         |        | 6.9g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 06   |  146.7 |  160.8 |    14.1 |    2.7 | Including 5.0m @ |
|           |        |        |         |        | 6.3g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 07   |   53.5 |   62.3 |     8.8 |    2.2 | Including 5.0m @ |
|           |        |        |         |        | 4.9g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |   95.8 |   96.7 |     0.9 |    2.3 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  112.2 |  117.1 |     4.9 |    2.9 | Including 1.2m @ |
|           |        |        |         |        | 10.4g/t Au       |
|-----------+--------+--------+---------+--------+------------------|
|           |  121.8 |  122.8 |     1.0 |    2.3 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  157.0 |  157.6 |     0.6 |   13.8 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 08   |   64.9 |   80.6 |    15.7 |    2.7 | Including 6.9m @ |
|           |        |        |         |        | 4.5g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |   87.8 |   98.8 |    11.0 |    2.0 | Including 6.8m @ |
|           |        |        |         |        | 2.6g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |  107.0 |  111.1 |     4.1 |    5.8 | Including 2.1m @ |
|           |        |        |         |        | 10.5g/t Au       |
|-----------+--------+--------+---------+--------+------------------|
|           |  221.5 |  227.0 |     5.5 |    5.0 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  231.5 |  234.0 |     2.5 |    3.8 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  239.0 |  244.3 |     5.3 |    2.1 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 09   |   75.3 |   76.5 |     1.2 |    5.8 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  118.5 |  122.0 |     3.5 |    2.6 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 10   |   16.4 |   18.6 |     2.2 |    2.0 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |   28.0 |   48.7 |    20.7 |    4.8 | Including 5.3m @ |
|           |        |        |         |        | 13.2g/t Au and   |
|-----------+--------+--------+---------+--------+------------------|
|           |        |        |         |        | 3.0m @ 5.3g/t Au |
|-----------+--------+--------+---------+--------+------------------|
|           |   68.9 |   75.2 |    11.3 |    1.9 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  201.0 |  203.8 |     2.8 |    9.3 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 11   |   16.0 |   32.0 |    16.0 |    1.7 | Including 4.7m @ |
|           |        |        |         |        | 3.1g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |   55.0 |   56.1 |     1.1 |   18.0 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  162.0 |  165.3 |     3.3 |    2.5 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  185.0 |  186.7 |     1.7 |    4.6 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 12   |    0.5 |   19.0 |    18.5 |    4.3 | Including 9.6m @ |
|           |        |        |         |        | 5.7g/t Au and    |
|-----------+--------+--------+---------+--------+------------------|
|           |        |        |         |        | 3.1m @ 6.1g/t Au |
|-----------+--------+--------+---------+--------+------------------|
|           |   56.6 |   68.4 |    11.8 |    4.6 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 13*  |   49.7 |   57.7 |     8.0 |    1.9 | Including 4.4m @ |
|           |        |        |         |        | 3.2g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |   63.0 |   69.0 |     6.0 |    1.7 | Including 1.9m @ |
|           |        |        |         |        | 4.5g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 14*  |   59.0 |   63.0 |     4.0 |   10.2 | Including 1.0m @ |
|           |        |        |         |        | 37.2g/t Au       |
|-----------+--------+--------+---------+--------+------------------|
|           |   93.8 |   98.2 |     4.4 |    2.9 | Including 1.2m @ |
|           |        |        |         |        | 8.85g/t Au       |
|-----------+--------+--------+---------+--------+------------------|
|           |  160.6 |  164.6 |     4.0 |    5.0 | Including 1.1m @ |
|           |        |        |         |        | 14.8g/t Au       |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 15*  |   35.4 |   36.0 |     0.6 |   11.2 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  103.5 |  104.5 |     1.0 |    3.4 |                  |
|-----------+--------+--------+---------+--------+------------------|
| TKBH 17*  |    2.0 |    6.3 |     4.3 |    2.2 | Including 1.3m @ |
|           |        |        |         |        | 6.3g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |   58.7 |   62.9 |     4.2 |    2.5 | Including 1.0m @ |
|           |        |        |         |        | 6.3g/t Au        |
|-----------+--------+--------+---------+--------+------------------|
|           |   67.0 |   68.0 |     1.0 |    5.8 |                  |
|-----------+--------+--------+---------+--------+------------------|
|           |  137.0 |  140.0 |     3.0 |    5.1 | Including 1.0m @ |
|           |        |        |         |        | 12.2g/t Au       |
+-------------------------------------------------------------------+

* indicates the latest assay results. The other results have been
announced previously and are presented here for completeness of
reporting.

Notes to Editors

Minerva  Resources  plc  is  a  UK  based  mineral  exploration   and
development company quoted on London's Alternative Investment  Market
(AIM: MVA). The Company is intent on delivering shareholder value  by
increasing and developing  its mineral  resources in  a socially  and
environmentally responsible manner.

The main focus is resource development in Ethiopia where the  Company
has first-mover advantage on prospective ground on the Arabian-Nubian
shield. Key projects  include the  gold resources at  the Tulu  Kapi,
Gudeya-Guji, Guji and  Dina Prospects  and the  Yubdo Platinum  Mine,
located in western Ethiopia, some 560km west of Addis Ababa.

Tulu Kapi was mined in the 1930s by an Italian company. In the 1970s,
the United Nations  Development Programme (UNDP)  mapped and  drilled
Tulu Kapi.  Tan  Range  Exploration carried  out  soil  sampling  and
further mapping and drilling in the  1990s. These two phases of  work
confirmed mineralisation extending over a strike length of 1.5km. The
project is undergoing resource drilling on a 600m section at present,
after   encouraging   Minerva   Resources   ground   mapping,    data
reinterpretation and excellent scout drilling results.

Drilling programmes are  also underway at  the Gudeya-Guji, Guji  and
Dina gold prospects,  which are  located in close  proximity to  Tulu
Kapi. The drilling has shown  mineralised intersections on all  three
prospects.

The results  from  the  drilling  on  Tulu  Kapi  and  the  satellite
prospects and their close proximity point towards a new gold province
with the potential for  the establishment of  a 'one treatment  plant
- -multiple feed scenario'.

The Company  is examining  the potential  to expand  the small  scale
platinum production operations at Yubdo, some 25km from the Tulu Kapi
Project. A  pilot  gravity  recovery  plant  has  been  installed,  a
metallurgical research  programme  has  been  initiated  and  further
exploration activities have  commenced on  the 9km  by 1.5km  surface
expression of the orebody.

In Sierra  Leone,  the  Company  holds  gold,  platinum  and  diamond
exploration licences, which  will for  the most part  continue to  be
developed by existing Joint Venture partners.

- ---END OF MESSAGE---





Minerva Res (LSE:MVA)
Historical Stock Chart
From Oct 2024 to Nov 2024 Click Here for more Minerva Res Charts.
Minerva Res (LSE:MVA)
Historical Stock Chart
From Nov 2023 to Nov 2024 Click Here for more Minerva Res Charts.