NEWS
RELEASE
NOT FOR
DISSEMINATION IN THE UNITED STATES OR FOR
DISTRIBUTION TO U.S. WIRE SERVICES
FOR
IMMEDIATE RELEASE
TSXV/AIM: THX
5 September 2024
Vancouver, British Columbia
EXPLORATION UPDATE ON THE
DOUTA GOLD PROJECT, SENEGAL
Thor Explorations Ltd. (TSXV/AIM:
THX) ("Thor" or the
"Company") is pleased to
announce the latest set of drilling results from its 2024 drilling
programme at the Douta Gold Project, Senegal (the "Douta Project"). The
drill-intersections of significant gold mineralisation are from the
Makosa East Prospect ("Makosa
East"), a more recently discovered prospect which runs 300
metres ("m") parallel to
the east of the previously defined Makosa deposit.
The Douta Gold Project encompasses
the Makosa gold deposit which currently comprises a total resource
of approximately 1.78 million ounces ("Moz") of gold ("Au") that consists of an indicated
resource of 21.2 million tonnes ("Mt") grading 1.3 grammes per tonne
("g/t") Au for 874,900
ounces of gold ("oz Au")
together with an inferred resource of 24 Mt grading 1.2 g/t Au for
909,400 oz Au.
A reverse circulation ("RC") drilling programme this year has
focussed on increasing the percentage of oxide resources with most
of the holes being terminated at relatively shallow depths. This
phase of the drilling has focussed on Makosa East which runs
parallel to the main Makosa mineralised trend, and which is
additional to the declared current mineral resource. Additional
infill drilling was completed at the Makosa North, Mansa and Maka
prospects.
The assay results from the drilling
completed to date include the following highlights:
· Drillhole DTRC1012- 32m at 1.76 g/t Au from 0m
· Drillhole DTDD995 - 14m at 1.20 g/t Au from 26m
· Drillhole DTDD1015 - 12m at 1.51 g/t Au from 40m
· Drillhole DTRC1028 - 8m at 1.90 g/t Au from 16m
Segun Lawson, President &
CEO, stated:
"We are pleased to announce
continuing positive drilling results from the Douta Prospect and in
particular, this set of results from Makosa East which lies
completely outside the existing 1.78 million ounce
resource.
"As per our strategy, these
results are expected to add additional oxide material to the
resource inventory from which we aim to design the initial period
of a potential future mining operation.
"We are encouraged by these
results from a new prospect outside the existing resource base. The
results are from surface and remain open at depth. The Makosa East
Prospect now has a strike length of over 1.5 kilometres. We look
forward to receiving the remaining outstanding results from the
vicinity of the current known deposits and the larger project area
with the objective of updating our resource and subsequently
completing our Preliminary Feasibility Study for the Douta
Project."
Introduction
The Douta Gold Project comprises two
exploration permits located within the Kéniéba inlier, eastern
Senegal. The Douta permit, EL02038, is held by Thor, through its
wholly owned subsidiary African Star Resources Incorporated
("African Star") which
acquired a 70% economic interest in the licence through a joint
venture agreement with the permit holder, International Mining
Company SARL ("IMC"). IMC
has a 30% free carry until the announcement by Thor of a probable
reserve. EL02038 is currently in the process of being converted
from an exploration licence to a mining licence.
The Douta West Project, comprising
exploration permit E03709, is contiguous with Thor's EL02038
(Figure 1). Douta West is operated by Thor under an agreement with
Birima Gold Resources Consulting and encompasses several historic
gold-in-soil geochemical anomalies that extend south from the
southern end of the Makosa Tail prospect and that also run parallel
and to the north of the known Makosa trend in a corridor that
occupies the ground between Makosa and Endeavour Mining's Masawa
gold mine.
The Company also has an interest in
the Sofita Gold Exploration Licence, located approximately 45
kilometres ("km") south
west of the Douta Project and is operated by Thor under an
agreement with Sofita Services Et Logistiques (Figure
1).
Figure 1: Douta Project
Location Map
Drilling Results
During July and August 2024, Thor
completed a RC drilling programme totalling 4,550m for 87 holes
with an average depth of 52m. The objective of the programme was to
increase the oxide resources along the Makosa East trend and to
infill earlier wide-spaced drilling at the Makosa North, Mansa and
Maka Prospects (Figure 2).
The significant intersections from
this programme are listed in Table 1. All results are reported in
Appendix 1. Drill samples were analysed by ALS Laboratories in Mali
using the AA26 fire assay method (50 gram charge).
Prospect
|
Hole ID
|
Easting
|
Northing
|
Depth
|
Dip
|
Azimuth
|
From
(m)
|
To
(m)
|
Interval
(m)
|
Grade
(g/tAu)
|
True Width
(m)
|
Mansa
|
DTRC958
|
182238
|
1444156
|
50
|
-60
|
130
|
20
|
29
|
9
|
1.06
|
8.1
|
Makosa East
|
DTRC995
|
176353
|
1436886
|
54
|
-60
|
130
|
26
|
40
|
14
|
1.20
|
12.6
|
Makosa East
|
DTRC1012
|
177020
|
1437703
|
72
|
-60
|
130
|
0
|
32
|
32
|
1.76
|
28.8
|
Makosa East
|
DTRC1015
|
177023
|
1437724
|
74
|
-60
|
130
|
16
|
28
|
12
|
1.51
|
10.8
|
Makosa East
|
DTRC1019
|
177031
|
1437748
|
84
|
-60
|
130
|
46
|
58
|
12
|
1.27
|
10.8
|
Makosa North
|
DTRC1028
|
178018
|
1439309
|
66
|
-60
|
130
|
40
|
48
|
8
|
1.90
|
7.2
|
Makosa North
|
DTRC1034
|
178366
|
1439793
|
20
|
-60
|
130
|
3
|
9
|
6
|
1.64
|
5.4
|
Table 1: Douta Project
Significant Results (>5 gram-metres: grade*true
width)
(0.5 g/t
Au lower cut off; minimum width 2m with 2m max internal
waste)
Previously reported intersections
from Makosa East (refer
Positive Exploration Results from the Douta Gold
Project, Senegal, June 25, 2024) included:
- 24m
grading 3.53 g/t Au in drillhole DTRC941,
- 12m
grading 1.40 g/t Au in DTRC920 and;
- 9m grading
2.74 g/t Au in DTRC921.
Current drilling results from this
area include 32m grading 1.76g/tAu in DTRC1012 and 12m grading
1.51g/tAu in DTRC1015 (Figure 2). These intersections are located
in the oxidised weathering zone.
Figure 2: Drillhole Location
Map
The Makosa East prospect is located
parallel to the Makosa mineralised trend and currently is not
included in the Douta resource inventory. Makosa East has been
tested over a strike length of about 3km on a series of 200m spaced
sections (Figure 3). The current programme has infilled the drill
pattern to 100m sections over most of the strike length. Towards
the northern end, tighter infill drilling has been adopted in order
to obtain a higher resource classification in a future mineral
resource estimate.
Additional extensional and infill
drilling is planned to test for additional resources with the
priority being the near-surface, oxidised weathering
zone.
Figure 3: Drillhole Location
Map - Makosa East
Ongoing Exploration
The Douta Project permits encompass
numerous additional targets that are yet to be fully tested. Within
the Douta licence itself, the main targets are Mansa, Maka and
Sambara. Additional detailed drilling during 2024 is planned to
fully test these targets. Target generation using geochemical
sampling methods in continuing within the Douta permit, the
adjoining Douta West permit and the Sofita permit that is located
south of the regional centre of Kedougou.
Qualified Person
The above
information has been prepared under the supervision of Alfred
Gillman (Fellow AusIMM, CP), who is designated as a "qualified
person" under National Instrument 43-101 and the AIM Rules and has
reviewed and approves the content of this news release. He has also
reviewed QA/QC, sampling, analytical and test data underlying the
information.
About Thor
Thor Explorations Ltd. is a Canadian
mineral exploration company engaged in the acquisition, exploration
and development of mineral properties located in Nigeria, Senegal
and Burkina Faso. Thor holds a 100% interest in the Segilola Gold
Project located in Osun State of Nigeria. Mining and production
commenced at Segilola in 2021. Thor holds a 70% interest in the
Douta Gold Project located in south-eastern Senegal. Thor trades on
the TSX Venture Exchange under the symbol "THX".
THOR EXPLORATIONS LTD.
Segun Lawson
President & CEO
For
further information please contact:
Thor Explorations Ltd
Email: info@thorexpl.com
Canaccord Genuity (Nominated Adviser
& Broker)
James Asensio / Henry
Fitzgerald-O'Connor / Harry Rees
Tel: +44 (0) 20 7523 8000
Hannam & Partners
(Broker)
Andrew Chubb / Matt Hasson / Nilesh
Patel / Franck Nganou
Tel: +44 (0) 20 7907 8500
BlytheRay (Financial
PR)
Tim Blythe / Megan Ray / Said
Izagaren
Tel: +44 207 138 3203
Yellow Jersey PR (Financial
PR)
Charles Goodwin / Shivantha
Thambirajah / Soraya Jackson
Tel: +44 (0) 20 3004
9512
Neither TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or
accuracy of this release.
This press release does not
constitute an offer to purchase securities. The securities to be
offered in the offering have not been and will not be registered
under the United States Securities Act of 1933, as amended, or any
state securities laws and may not be offered or sold in the United
States or to, or for the benefit or account of, a U.S. person,
except pursuant to an available exemption from such registration
requirements.
Cautionary Note Regarding Forward-Looking
Statements
Except for the statements of historical fact contained herein,
the information presented constitutes "forward looking statements"
within the meaning of certain securities laws, and is subject to
important risks, uncertainties and assumptions that could
cause the actual results of the Company to differ materially form
the forward-looking statements. Such forward-looking statements,
including but not limited to, the Company's ability to fully
finance the Project, to bring the Project into operation or to
produce gold from the Project, and the use of the proceeds.
The words "may", "could", "should", "would", "suspect", "outlook",
"believe", "anticipate", "estimate", "expect", "intend", "plan",
"target" and similar words and expressions are used to identify
forward-looking information. The forward-looking information in
this news release describes the Company's expectations as of the
date of this news release and accordingly, is subject to change
after such date. Readers should not place undue importance on
forward-looking information and should not rely upon this
information as of any other date. While the Company may
elect to, it does not undertake to update this information at any
particular time.
Appendix 1
Makosa
East Drilling Results
(0.5g/tAu
lower cut off; minimum width 2m with 2m max internal
waste)
Prospect
|
Hole ID
|
Easting
|
Northing
|
Depth
|
Dip
|
Azimuth
|
From
(m)
|
To
(m)
|
Interval
(m)
|
Grade
(g/tAu)
|
True Width
(m)
|
Mansa
|
DTRC958
|
182238
|
1444156
|
50
|
-60
|
130
|
15
|
19
|
4
|
0.63
|
3.6
|
|
|
|
|
|
|
|
20
|
29
|
9
|
1.06
|
8.1
|
Mansa
|
DTRC959
|
182220
|
1444174
|
50
|
-60
|
130
|
45
|
50
|
5
|
0.70
|
4.5
|
Mansa
|
DTRC960
|
182202
|
1444191
|
50
|
-60
|
130
|
8
|
10
|
2
|
0.82
|
1.8
|
Mansa
|
DTRC961
|
182374
|
1444270
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC962
|
182356
|
1444288
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC963
|
182338
|
1444306
|
50
|
-60
|
130
|
18
|
20
|
2
|
0.96
|
1.8
|
Mansa
|
DTRC964
|
182320
|
1444322
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC965
|
182447
|
1444345
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC966
|
182430
|
1444363
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC967
|
182413
|
1444381
|
50
|
-60
|
130
|
10
|
13
|
3
|
0.76
|
2.7
|
Mansa
|
DTRC968
|
182395
|
1444399
|
50
|
-60
|
130
|
41
|
46
|
5
|
0.57
|
4.5
|
Mansa
|
DTRC969
|
182614
|
1443402
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC970
|
182592
|
1443415
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC971
|
182571
|
1443428
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC972
|
182691
|
1443527
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC973
|
182670
|
1443541
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC974
|
182648
|
1443554
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC975
|
182747
|
1443612
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC976
|
182726
|
1443625
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC977
|
182705
|
1443638
|
50
|
-60
|
130
|
28
|
30
|
2
|
2.35
|
1.8
|
Mansa
|
DTRC978
|
182684
|
1443651
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC979
|
182662
|
1443665
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC980
|
181823
|
1442835
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC981
|
181803
|
1442848
|
50
|
-60
|
130
|
40
|
44
|
4
|
1.02
|
3.6
|
Mansa
|
DTRC982
|
181782
|
1442861
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC983
|
181846
|
1442940
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC984
|
181861
|
1442927
|
50
|
-60
|
130
|
9
|
16
|
7
|
0.75
|
6.3
|
Mansa
|
DTRC985
|
181955
|
1443028
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Mansa
|
DTRC986
|
181936
|
1443045
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC987
|
176179
|
1436516
|
40
|
-60
|
130
|
7
|
9
|
2
|
0.61
|
1.8
|
MakosaEast
|
DTRC988
|
176157
|
1436528
|
50
|
-60
|
130
|
1
|
5
|
4
|
0.54
|
3.6
|
MakosaEast
|
DTRC989
|
176297
|
1436662
|
50
|
-60
|
130
|
3
|
6
|
3
|
0.74
|
2.7
|
|
|
|
|
|
|
|
23
|
25
|
2
|
0.83
|
1.8
|
MakosaEast
|
DTRC990
|
176279
|
1436682
|
62
|
-60
|
130
|
54
|
56
|
2
|
1.10
|
1.8
|
MakosaEast
|
DTRC991
|
176260
|
1436698
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC992
|
176241
|
1436714
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC993
|
176275
|
1436802
|
84
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC994
|
176371
|
1436869
|
50
|
-60
|
130
|
6
|
9
|
3
|
0.55
|
2.7
|
MakosaEast
|
DTRC994
|
|
|
|
|
|
20
|
22
|
2
|
1.09
|
1.8
|
MakosaEast
|
DTRC995
|
176353
|
1436886
|
54
|
-60
|
130
|
18
|
22
|
4
|
1.03
|
3.6
|
|
|
|
|
|
|
|
26
|
40
|
14
|
1.20
|
12.6
|
MakosaEast
|
DTRC996
|
176487
|
1437028
|
46
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC997
|
176467
|
1437044
|
55
|
-60
|
130
|
31
|
34
|
3
|
1.10
|
2.7
|
MakosaEast
|
DTRC998
|
176531
|
1437120
|
50
|
-60
|
130
|
19
|
26
|
7
|
0.85
|
6.3
|
MakosaEast
|
DTRC999
|
176512
|
1437136
|
60
|
-60
|
130
|
46
|
48
|
2
|
0.84
|
1.8
|
MakosaEast
|
DTRC1000
|
176892
|
1437497
|
50
|
-60
|
130
|
40
|
42
|
2
|
1.95
|
1.8
|
MakosaEast
|
DTRC1001
|
176962
|
1437530
|
41
|
-60
|
130
|
62
|
65
|
3
|
0.66
|
2.7
|
MakosaEast
|
DTRC1002
|
176980
|
1437592
|
35
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1003
|
176960
|
1437610
|
75
|
-60
|
130
|
54
|
56
|
2
|
0.64
|
1.8
|
MakosaEast
|
DTRC1004
|
176942
|
1437627
|
83
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1005
|
177010
|
1437631
|
48
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1006
|
177044
|
1437650
|
32
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1007
|
177022
|
1437669
|
46
|
-60
|
130
|
42
|
44
|
2
|
0.80
|
1.8
|
MakosaEast
|
DTRC1008
|
177003
|
1437684
|
90
|
-60
|
130
|
0
|
6
|
6
|
1.01
|
5.4
|
|
|
|
|
|
|
|
67
|
75
|
8
|
0.89
|
7.2
|
|
|
|
|
|
|
|
79
|
85
|
6
|
0.66
|
5.4
|
MakosaEast
|
DTRC1009
|
176981
|
1437703
|
48
|
-60
|
130
|
nsr
|
|
|
|
0.0
|
MakosaEast
|
DTRC1010
|
177055
|
1437669
|
28
|
-60
|
130
|
21
|
23
|
2
|
0.60
|
1.8
|
MakosaEast
|
DTRC1011
|
177038
|
1437686
|
47
|
-60
|
130
|
12
|
20
|
8
|
0.96
|
7.2
|
|
|
|
|
|
|
|
29
|
32
|
3
|
1.66
|
2.7
|
|
|
|
|
|
|
|
42
|
46
|
4
|
0.95
|
3.6
|
Prospect
|
Hole ID
|
Easting
|
Northing
|
Depth
|
Dip
|
Azimuth
|
From
(m)
|
To
(m)
|
Interval
(m)
|
Grade
(g/tAu)
|
True Width
(m)
|
MakosaEast
|
DTRC1012
|
177020
|
1437703
|
72
|
-60
|
130
|
0
|
32
|
32
|
1.76
|
28.8
|
|
|
|
|
|
|
|
65
|
69
|
4
|
0.60
|
3.6
|
MakosaEast
|
DTRC1013
|
177001
|
1437719
|
54
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1014
|
177054
|
1437699
|
53
|
-60
|
130
|
22
|
24
|
2
|
1.44
|
1.8
|
MakosaEast
|
DTRC1015
|
177023
|
1437724
|
74
|
-60
|
130
|
0
|
11
|
11
|
0.99
|
9.9
|
|
|
|
|
|
|
|
16
|
28
|
12
|
1.51
|
10.8
|
|
|
|
|
|
|
|
33
|
41
|
8
|
1.17
|
7.2
|
|
|
|
|
|
|
|
50
|
52
|
2
|
0.69
|
1.8
|
|
|
|
|
|
|
|
60
|
64
|
4
|
0.63
|
3.6
|
|
|
|
|
|
|
|
67
|
73
|
6
|
1.23
|
5.4
|
MakosaEast
|
DTRC1016
|
177089
|
1437702
|
30
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1017
|
177070
|
1437718
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1018
|
177050
|
1437733
|
65
|
-60
|
130
|
27
|
29
|
2
|
0.70
|
1.8
|
MakosaEast
|
DTRC1019
|
177031
|
1437748
|
84
|
-60
|
130
|
12
|
24
|
12
|
0.81
|
10.8
|
|
|
|
|
|
|
|
25
|
28
|
3
|
1.48
|
2.7
|
|
|
|
|
|
|
|
46
|
58
|
12
|
1.27
|
10.8
|
|
|
|
|
|
|
|
68
|
71
|
3
|
0.80
|
2.7
|
MakosaEast
|
DTRC1020
|
177081
|
1437739
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1021
|
177061
|
1437754
|
63
|
-60
|
130
|
44
|
46
|
2
|
0.97
|
1.8
|
MakosaEast
|
DTRC1022
|
177041
|
1437770
|
60
|
-60
|
130
|
50
|
52
|
2
|
0.66
|
1.8
|
MakosaEast
|
DTRC1023
|
177124
|
1437767
|
36
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1024
|
177101
|
1437786
|
42
|
-60
|
130
|
nsr
|
|
|
|
|
MakosaEast
|
DTRC1025
|
177040
|
1437707
|
34
|
-60
|
130
|
9
|
15
|
6
|
0.55
|
5.4
|
|
|
|
|
|
|
|
16
|
20
|
4
|
0.59
|
3.6
|
Makosa North
|
DTRC1026
|
177909
|
1439121
|
33
|
-60
|
130
|
20
|
22
|
2
|
0.67
|
1.8
|
Makosa North
|
DTRC1026
|
|
|
0
|
-60
|
|
27
|
33
|
6
|
0.96
|
5.4
|
Makosa North
|
DTRC1027
|
177890
|
1439137
|
60
|
-60
|
130
|
20
|
23
|
3
|
1.24
|
2.7
|
Makosa North
|
DTRC1028
|
178018
|
1439309
|
66
|
-60
|
130
|
40
|
48
|
8
|
1.90
|
7.2
|
|
|
|
|
|
|
|
52
|
54
|
2
|
0.97
|
1.8
|
|
|
|
|
|
|
|
62
|
65
|
3
|
0.81
|
2.7
|
Makosa North
|
DTRC1029
|
178037
|
1439293
|
24
|
-60
|
130
|
nsr
|
|
|
|
|
Makosa North
|
DTRC1030
|
178142
|
1439459
|
32
|
-60
|
130
|
nsr
|
|
|
|
|
Makosa North
|
DTRC1031
|
178122
|
1439475
|
50
|
-60
|
130
|
47
|
50
|
3
|
0.94
|
2.7
|
Makosa North
|
DTRC1033
|
178242
|
1439655
|
57
|
-60
|
130
|
47
|
53
|
6
|
0.81
|
5.4
|
Makosa North
|
DTRC1034
|
178366
|
1439793
|
20
|
-60
|
130
|
3
|
9
|
6
|
1.64
|
5.4
|
Makosa North
|
DTRC1035
|
178346
|
1439808
|
54
|
-60
|
130
|
43
|
45
|
2
|
0.70
|
1.8
|
Makosa North
|
DTRC1036
|
179557
|
1441167
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Makosa North
|
DTRC1037
|
179538
|
1441184
|
72
|
-60
|
130
|
22
|
28
|
6
|
0.62
|
5.4
|
|
|
|
|
|
|
|
30
|
34
|
4
|
0.57
|
3.6
|
|
|
|
|
|
|
|
36
|
40
|
4
|
0.80
|
3.6
|
|
|
|
|
|
|
|
43
|
45
|
2
|
0.87
|
1.8
|
Makosa North
|
DTRC1038
|
179584
|
1441272
|
84
|
-60
|
130
|
66
|
74
|
8
|
0.65
|
7.2
|
Makosa North
|
DTRC1039
|
179659
|
1441341
|
57
|
-60
|
130
|
42
|
47
|
5
|
1.05
|
4.5
|
Makosa North
|
DTRC1041
|
180237
|
1441900
|
50
|
-60
|
130
|
12
|
19
|
7
|
0.77
|
6.3
|
Makosa North
|
DTRC1042
|
180218
|
1441916
|
66
|
-60
|
130
|
46
|
54
|
8
|
0.65
|
7.2
|
Makosa North
|
DTRC1043
|
180130
|
1441732
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Makosa North
|
DTRC1044
|
180112
|
1441749
|
56
|
-60
|
130
|
nsr
|
|
|
|
|
Makosa North
|
DTRC1045
|
180417
|
1442044
|
50
|
-60
|
130
|
nsr
|
|
|
|
|
Makosa North
|
DTRC1046
|
180385
|
1442068
|
78
|
-60
|
130
|
24
|
30
|
6
|
0.59
|
5.4
|