UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of September, 2023
Commission File Number: 0001-34184
NEW PACIFIC METALS CORP.
(Translation of registrant’s name into English)
Suite 1750 - 1066 W. Hastings Street
Vancouver BC, Canada, V6E 3X1
(Address of principal executive office)
Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.
[ ] Form 20-F [ X ] Form 40-F
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
|
|
|
|
NEW PACIFIC METALS CORP. |
|
|
|
Dated: September 20, 2023 |
By: |
/s/ Jalen Yuan |
|
|
Jalen Yuan |
|
|
Chief Accounting Officer |
Exhibit 99.1
Anderson Goncalves Candido
RPM Global
8º floor,330 St Antonio
de Albuquerque
Belo Horizonte, MG - Brazil
Phone: +55 31 99969 1205
agcandido@rpmglobal.com
I, Anderson Goncalves Candido,
am working as a Principal Resource Geologist for RPM Global, of 8º floor,330 St Antonio de Albuquerque, Belo Horizonte, MG - Brazil.
This certificate applies to the NI 43-101 Mineral Resources Technical Report on the Carangas Gold-Silver Project, Bolivia, prepared for
New Pacific Metals Corp., dated effective as of 25 August 2023 (the “Technical Report”), do hereby certify that:
1. I am a Fellow Member of the
Australasian Institute of Mining and Metallurgy (“FAusIMM”).
2. I
am a professional geologist having graduated with an undergraduate degree of Bachelor of Science (Geology Engineer) from the Ouro Preto
Federal University in 2003.
3. I
have worked as a geologist for a period in excess of 19 years since my graduation from university. I have been continuously and actively
engaged in the geology discipline on assessment, development, and operation of mineral Projects.
4. I
am a Qualified Person for the purposes of the National Instrument 43-101 of the Canadian Securities Administrators (“NI 43-101”).
5. I
visited the Carangas Gold-Silver Project site from March 27 to 30, 2023 to verify and have a good geology understanding and project perspectives.
6. I approved the preparation and compilation of the Technical Report.
7. I have had no prior involvement with the properties that are the subject of the Technical Report.
8. To
the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required
to be disclosed to make the Technical Report not misleading as of the effective date of the report, 25 August 2023.
9. I
am independent of New Pacific Metals Corp. in accordance with the application of Section 1.5 of NI 43- 101.
10. I
have read NI 43-101 and Form 43-101F1 and the Technical Report has been prepared in compliance with that instrument and form.
11. I
consent to the filing of the Technical Report with any stock exchange or any other regulatory authority and any publication by them for
regulatory purposes, including electronic publication in the public company files on their website and accessible by the public, of the
Technical Report.
Dated at Brazil, 25 August 2023
“Anderson Goncalves Candido”
“Anderson Goncalves Candido” (QP)
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page i of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Marcelo del Giudice
RPM
Global
8º floor,330 St Antonio
de Albuquerque
Belo Horizonte, MG - Brazil
Phone: +55 31 98478 2939
mgiudice@rpmglobal.com
I, Marcelo del Giudice am working
as a Principal Metallurgist for RPM Global, of 8º floor,330 St Antonio de Albuquerque, Belo Horizonte, MG - Brazil. This certificate
applies to the NI 43-101 Mineral Resources Technical Report on the Carangas Gold-Silver Project, Bolivia, prepared for New Pacific Metals
Corporation, dated 25 August 2023 (the “Technical Report”), do hereby certify that:
1. I am a Fellow Member of the Australasian Institute of Mining and Metallurgy (“FAusIMM”).
2. I
am a professional metallurgist with an undergraduate degree of Bachelor of Science (Metallurgical Engineering) from the Minas Gerais Federal
University in 2009. I obtained a Master of Science degree in Chemical Engineering in 2014 from the University of São Paulo.
3. I
have been continuously and actively engaged in the mineral processing, project development, and operation of mineral projects since graduation
from university.
4. I
am a Qualified Person for the purposes of the National Instrument 43-101 of the Canadian Securities Administrators (“NI 43-101”).
5. I have not visited the Carangas Gold-Silver Project site.
6. I am author of this report and responsible for section 13 and parts of 1 and 26.
7. I have had no prior involvement with the properties that are the subject of the Technical Report.
8. To
the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required
to be disclosed to make the Technical Report not misleading as of the effective date of the report, 25 August 2023.
9. I
am independent of New Pacific Metals Corp. in accordance with the application of Section 1.5 of NI 43-101.
10. I
have read NI 43-101 and Form 43-101F1 and the Technical Report has been prepared in compliance with that instrument and form.
11. I
consent to the filing of the Technical Report with any stock exchange or any other regulatory authority and any publication by them for
regulatory purposes, including electronic publication in the public company files on their website and accessible by the public, of the
Technical Report.
Dated at Brazil, 25 August 2023
“Marcelo del
Giudice”
“Marcelo del Giudice” (QP)
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page ii of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
TABLE OF CONTENTS
1. |
SUMMARY |
8 |
|
|
|
1.1 |
Introduction |
8 |
1.2 |
Scope and Terms of Reference |
8 |
1.3 |
Technical Summary |
9 |
|
|
|
2. |
INTRODUCTION |
15 |
|
|
|
2.1 |
Terms of Reference |
15 |
2.2 |
Sources of Information |
15 |
2.3 |
Participants and Responsibilities |
15 |
2.4 |
Limitations and Exclusions |
16 |
2.5 |
List of Abbreviations |
16 |
|
|
|
3. |
RELIANCE ON OTHER EXPERTS |
19 |
|
|
|
4. |
PROPERTY DESCRIPTION AND LOCATION |
20 |
|
|
|
4.1 |
Prospecting and Exploration Licenses (PEL) |
21 |
4.2 |
Terms of the Joint Venture |
23 |
4.3 |
Environmental Liabilities |
24 |
|
|
|
5. |
ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY |
25 |
|
|
|
5.1 |
Physiography and Climate |
25 |
5.2 |
Accessibility, Infrastructure and Local Resources |
25 |
|
|
|
6. |
HISTORY |
27 |
|
|
|
7. |
GEOLOGICAL SETTING AND MINERALISATION |
28 |
|
|
|
7.1 |
Regional Geology |
28 |
7.2 |
Geology of Carangas Property |
30 |
7.3 |
Project Mineralisation |
32 |
|
|
|
8. |
DEPOSIT TYPE |
35 |
|
|
|
9. |
EXPLORATION |
36 |
|
|
|
9.1 |
Sampling and Mapping |
36 |
9.2 |
Geophysics |
37 |
|
|
|
10. |
DRILLING |
38 |
|
|
|
10.1 |
Drilling Type |
39 |
10.2 |
Drilling Locational Data |
39 |
10.3 |
Drilling Sample Recovery |
39 |
10.4 |
Process Verification |
39 |
|
|
|
11. |
SAMPLE PREPARATION, ANALYSES AND SECURITY |
40 |
|
|
|
11.1 |
Sample Collection |
40 |
11.2 |
Assay Laboratory Sample Preparation and Analysis |
41 |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page iii of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
11.3 |
Bulk Density |
42 |
11.4 |
Quality Control Data |
42 |
11.5 |
Security and Storage |
48 |
11.6 |
RPM Opinion on Adequacy of Sample Preparation, Analyses, Security and QA/QC |
49 |
|
|
|
12. |
DATA VERIFICATION |
50 |
|
|
|
12.1 |
Data Verification Measures |
50 |
12.2 |
Database Validation |
50 |
12.3 |
Validation of Mineralisation |
50 |
12.4 |
Drill Hole Location Validation |
51 |
12.5 |
Core Logging, Sampling, and Storage Facilities |
52 |
12.6 |
RPM Opinion on Validity of the Data |
52 |
|
|
|
13. |
MINERAL PROCESSING AND METALLURGICAL TESTING |
53 |
|
|
|
13.1 |
Introduction |
53 |
13.2 |
Sample selection and detailed head assay |
53 |
13.3 |
Bulk flotation testwork for Sample 1 |
55 |
13.4 |
Sequential selective flotation testwork for Sample 2 |
60 |
13.5 |
Sequential selective flotation testwork for Sample 3 |
67 |
13.6 |
Whole rock cyanide leach for gold recovery |
75 |
13.7 |
Whole rock cyanide leach for silver recovery |
77 |
13.8 |
Cyanide leach of lead/silver flotation concentrate for silver recovery |
78 |
13.9 |
Recommendations |
80 |
|
|
|
14. |
MINERAL RESOURCE ESTIMATE |
82 |
|
|
|
14.1 |
Mineral Resource Database |
82 |
14.2 |
Depletion Areas |
83 |
14.3 |
Geological and Mineralisation Interpretation |
83 |
14.4 |
Compositing and Statistics |
85 |
14.5 |
Mineral Resource Estimation |
87 |
|
|
|
15. |
MINERAL RESERVE ESTIMATE |
99 |
|
|
|
16. |
MINING METHODS |
100 |
|
|
|
17. |
RECOVERY METHODS |
101 |
|
|
|
18. |
PROJECT INFRASTRUCTURE |
102 |
|
|
|
19. |
MARKET STUDIES AND CONTRACTS |
103 |
|
|
|
20. |
ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL/COMMUNITY IMPACT |
104 |
|
|
|
21. |
CAPITAL AND OPERATING COSTS |
105 |
|
|
|
22. |
ECONOMIC ANALYSIS |
106 |
|
|
|
23. |
ADJACENT PROPERTIES |
107 |
|
|
|
24. |
OTHER RELEVANT DATA AND INFORMATION |
108 |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page iv of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
25. |
INTERPRETATION AND CONCLUSIONS |
109 |
|
|
|
26. |
RECOMMENDATIONS |
110 |
|
|
|
26.1 |
Drilling |
110 |
26.2 |
Geology Study, Mapping and Prospecting |
110 |
26.3 |
Processing and Metallurgt Tests |
110 |
26.4 |
Undergound Mining Study |
111 |
26.5 |
Techncial and Economic Studies |
111 |
26.6 |
Estimated Budget for Recommendations |
111 |
|
|
|
27. |
REFERENCES |
112 |
LIST OF TABLES |
|
|
|
Table 1-1 Carangas Deposit - Conceptual Pit* Constrained Mineral Resource as of 25 August 2023 |
12 |
Table 4-1 Mining Rights of Carangas Property |
21 |
Table 5-1 Weather of Carangas Region |
25 |
Table 7-1 Summary of Carangas mineralized zones |
33 |
Table 9-1 Summary of exploration programs at Carangas |
36 |
Table 10-1 Carangas Drilling History |
38 |
Table 11-1 QA/QC samples status |
43 |
Table 11-2 CRMs of Carangas Project |
43 |
Table 11-3 Statistical summary for duplicate samples July 2021 – April 2023 |
45 |
Table 11-4 Statistical summary for umpire duplicates samples |
48 |
Table 12-1 Drill Core Intervals Viewed |
50 |
Table 13-1 Selections of five composite samples |
54 |
Table 13-2 Head assays of five composite samples |
54 |
Table 13-3 Locked cycle flotation results for Sample 1 |
60 |
Table 13-4 Silver/lead cleaner flotation results for Sample 2 |
66 |
Table 13-5 Locked cycle flotation results for Sample 2 |
67 |
Table 13-6 Silver/lead cleaner flotation results for Sample 3 |
74 |
Table 13-7 Zinc cleaner flotation results for Sample 3 |
74 |
Table 13-8 Locked cycle flotation results for Sample 3 |
75 |
Table 13-9 Cyanide leach conditions and results for Sample 4 and Sample 5 |
76 |
Table 13-10 Cyanide leach conditions and results for Sample 1, Sample 2 and Sample 3 |
78 |
Table 13-11 Cyanide leach results for silver/lead concentrates |
79 |
Table 14-1 Density Statistics Table |
83 |
Table 14-2 Univariate Statistics of Grade Composites, by Domain |
86 |
Table 14-3 Top Cut Values into all Domains |
87 |
Table 14-4 Carangas Block Model Definition Parameters |
88 |
Table 14-5 Carangas Grade Estimation Search Parameters |
89 |
Table 14-6 Density Estimation Parameters |
90 |
Table 14-7 Composite vs. Block Model Grade Statistical Validation |
91 |
Table 14-8 3D Volumetric Model comparison |
91 |
Table 14-9 Commodity Prices Used in the Resource Calculation |
96 |
Table 14-10 Statement of Mineral Resources* at the Carangas Project as of 25th August 2023 |
97 |
Table 26-1 Estimated Budget for Recommendations |
111 |
|
|
LIST OF FIGURES |
|
|
|
Figure 4-1 Carangas Project General Location Plan |
20 |
Figure 4-2 Location of Carangas Mineral Rights |
22 |
Figure 7-1 Regional Geology Map of Bolivia Central Andes |
29 |
Figure 7-2 Regional Geology of Carangas Property |
30 |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page v of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 7-3 Carangas Local Geology |
31 |
Figure 7-4 Carangas diatreme structure section view – looking NW |
32 |
Figure 7-5 Mineralized Zones by Metal Zoning- Oblique Section |
33 |
Figure 8-1 Schematic cross section of Bolivia region |
35 |
Figure 9-1 IP chargeability anomalies of Carangas Area |
37 |
Figure 10-1 Drillhole Location |
38 |
Figure 11-1 Drill core box example - drill hole DCAr0171 |
40 |
Figure 11-2 Core cutting and sample bag |
41 |
Figure 11-3 Specific gravity Measurement |
42 |
Figure 11-4 Control chart for CDN-ME-1501 (Ag) (July 2021 – November 2022) |
44 |
Figure 11-5 Control chart for Coarse Blank Samples |
44 |
Figure 11-6 Control chart for Pulp Blank CDN-GEO-1901 |
45 |
Figure 11-7 Precision plot of field (1/4 core) duplicates for silver assays |
46 |
Figure 11-8 Quantile-Quantile plot of field (1/4 core) duplicates for silver assays |
46 |
Figure 11-9 Coarse Duplicate Precision scatterplot - silver assays |
47 |
Figure 11-10 Precision plot of pulp duplicates for silver assays |
47 |
Figure 11-11 Umpire pulp duplicates precision scatterplot for silver assays |
48 |
Figure 11-12 Secure core yard storage |
49 |
Figure 12-1 Drill core mineralization intercepts examples |
51 |
Figure 12-2 Drillholes collar field registration |
51 |
Figure 13-1 Silver recovery as a function of concentrate mass pull for Sample 1 |
56 |
Figure 13-2 Lead recovery as a function of concentrate mass pull for Sample 1 |
56 |
Figure 13-3 Silver recovery as a function of concentrate mass pull for Sample 1 by ALS |
57 |
Figure 13-4 Lead recovery as a function of concentrate mass pull for Sample 1 by ALS |
58 |
Figure 13-5 Silver recovery and silver content in the concentrate for Sample 1 |
59 |
Figure 13-6 Lead recovery and lead content in the concentrate for Sample 1 |
59 |
Figure 13-7 Silver recovery as a function of concentrate mass pull for Sample 2 |
61 |
Figure 13-8 Lead recovery as a function of concentrate mass pull for Sample 2 |
61 |
Figure 13-9 Silver recovery versus enrichment ratio between silver and zinc for Sample 2 |
62 |
Figure 13-10 Lead recovery versus enrichment ratio between lead and zinc for Sample 2 |
62 |
Figure 13-11 Silver recovery as a function of concentrate mass pull for Sample 2 by ALS |
64 |
Figure 13-12 Lead recovery as a function of concentrate mass pull for Sample 2 by ALS |
64 |
Figure 13-13 Silver recovery versus enrichment ratio between silver and zinc for Sample 2 by ALS |
65 |
Figure 13-14 Lead recovery versus enrichment ratio between lead and zinc for Sample 2 by ALS |
65 |
Figure 13-15 Silver recovery as a function of concentrate mass pull for Sample 3 |
68 |
Figure 13-16 Lead recovery as a function of concentrate mass pull for Sample 3 |
68 |
Figure 13-17 Silver recovery versus enrichment ratio between silver and zinc for Sample 3 |
69 |
Figure 13-18 Lead recovery versus enrichment ratio between lead and zinc for Sample 3 |
69 |
Figure 13-19 Zinc recovery (net) as a function of concentrate mass pull (net) for Sample 3 |
70 |
Figure 13-20 Silver recovery as a function of concentrate mass pull for Sample 3 |
71 |
Figure 13-21 Lead recovery as a function of concentrate mass pull for Sample 3 |
71 |
Figure 13-22 Silver recovery versus enrichment ratio between silver and zinc for Sample 3 |
72 |
Figure 13-23 Lead recovery versus enrichment ratio between lead and zinc for Sample 3 |
72 |
Figure 13-24 Zinc recovery (net) as a function of concentrate mass pull for Sample 3 |
73 |
Figure 13-25 Gold dissolution rate in cyanide leach for Sample 4 |
76 |
Figure 13-26 Gold dissolution rate in cyanide leach for Sample 5 |
77 |
Figure 13-27 Silver dissolution rate in cyanide leach for Sample 1, Sample 2 and Sample 3 |
78 |
Figure 13-28 Silver dissolution rate in cyanide leach of silver/lead concentrates |
79 |
Figure 14-1 Three-Dimensional View of the Carangas Geological Model |
84 |
Figure 14-2 Length Histogram for Raw Assay Intervals |
85 |
Figure 14-3 Ag Log Histogram for 1.5 m Composites |
86 |
Figure 14-4 Estimation Density Histogram Validation |
90 |
Figure 14-5 Swath Plot along X,Y,Z Direction for Ag (g/t) Validation |
92 |
Figure 14-6 Ag (g/t) grade Section View Validation of Block Model – Section 22 |
93 |
Figure 14-7 Ag (g/t) grade Section View Validation of Block Model – Section DCAr0094 |
94 |
Figure 14-8 Classified Mineral Resources Block Model – Section 22 |
95 |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page vi of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
LIST OF APPENDICES
Appendix A. High-Grade Cuts Analysis
Appendix B. Important Information about
this Document
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page vii of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
1.
SUMMARY
1.1
Introduction
RPM Global Limited (“RPM”),
was engaged by New Pacific Metals Corp. (“NPM”, the “Company” or the “Client”) to complete an Independent
Mineral Resource Estimate Technical Report (“Technical Report” or the “Report”) of the Carangas Silver-Gold Project
(the “Project”, “Property” or “Relevant Asset”), located in Oruro Department, Bolivia. This Technical
Report conforms to the NI 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators (“NI 43-101”).
1.2
Scope and Terms of Reference
RPM operates as an independent
technical consultant providing resource evaluation, mining engineering and mine valuation services to the resources and financial services
industries. This Report was prepared on behalf of RPM by technical specialists.
This Report includes an independent
Mineral Resource estimate for the Carangas Silve-Gold Project completed by RPM. RPM considers that the Project has good potential for
eventual economic extraction using open pit mining techniques and employing conventional mineral processing methods to recover the metals.
RPM’s technical team (“the
Team”) consisted of geologists, metallurgists and mining engineers. The Qualified Person, Mr. Anderson Goncalves Candido, completed
a site visit during March 27 to 30, 2023 to become familiar with site conditions, sampling and sample handling procedures and had open
discussions with the Company personnel on technical aspects relating to the Project as a part of this Report. RPM found the NPM personnel
to be cooperative and open in facilitating RPM’s work.
In addition to the work undertaken
by RPM to generate an estimate of Mineral Resources, this Report includes information provided by the Company and verified by RPM where
applicable, either directly from the site and other offices, or from reports by other organizations whose work is the property of the
Company. The data used for the Mineral Resource estimate completed by RPM and contained in this Report, has been provided by the Company
and verified by the Qualified Persons (“QP”). All opinions, findings and conclusions expressed in the report are those of
the Qualified Persons named herein and are not warranted in any way, expressed or implied. The Report specifically excludes all aspects
of legal issues, marketing, commercial and financing matters, insurance, land titles and usage agreements, and any other agreements/contracts
that the Company may have entered into except to the extent required pursuant to NI 43-101.
In RPM’s opinion, the information
provided by the Company was sufficient and nothing was discovered during review of the data and the preparation of the Report that indicated
there was any material error or misrepresentation in respect of that information.
RPM has been paid, and has agreed
to be paid, professional fees for the preparation of this Report. However, none of RPM’s staff or sub-consultants who contributed
to this Report has any interest in:
■ | the Company, securities of the Company or companies associated with the Company; or |
| |
Drafts of the Report were provided
to the Company, for the purpose of confirming the accuracy of factual material and the reasonableness of assumptions relied upon in the
Report. This Report is mainly based on information provided by the Company, either directly from the Project site and other associated
offices or from reports by other organizations whose work is the property of the Company. The Report is based on information made available
to RPM as of June 1, 2023.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 8 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
1.3
Technical Summary
The Carangas Property (the “Property”)
or the Carangas Project (the “Project”) covers an area of 40.75 square kilometers (km2),
located in the South America Epithermal-Porphyry Belt in Western Cordillera of Bolivia. The Company, through its wholly owned subsidiaries
entered into a joint venture agreement or Mining Association Contract (“MAC”) with Mineral Granville S.R.L. (“Granville”),
a private Bolivian company which owns the mineral right of the Carangas Property to acquire 98% profits generated from the Project by
fulfilling the obligations outlined in the MAC.
Exploration at Carangas commenced
in the late 1980’s with mapping and channel chip sampling carried out in the old mining adits of San Jose and Orko Tonku at West
Dome and the adits at East Dome. More than 350 samples were collected with an average grade of 64 g/t silver. Since 2021, exploration
activities have focused on surface drilling. Drilling operations lasted until the end of April 2023.
The Carangas silver-gold polymetallic
deposit is hosted in a volcanic caldera system centered by a diatreme of Tertiary age. Mineralization is controlled by geo-thermal gradient
sourced from rhyolitic intrusions in the diatreme and zoned into three zones: an upper silver-dominated zone, a middle zinc-lead dominated
zone and a lower gold-dominated zone. Accordingly, three mineralized domains are created for Mineral Resource estimation: Ag Domain, Zn-Pb
Domain, and Au-Domain
1.3.1
Property Description and Location
The Carangas Property is located
at Carangas, in the western portion of the Oruro Department in Bolivia. It is approximately 190 kilometers (km) southwest of Oruro City.
The Property is presently held by Minera Granville S.R.L., a private Bolivian company, and comprised of three Prospecting and Exploration
Licenses (“PELs”), namely Granville I, Granville II, and Colapso, covering a total area of 40.75 km2.
New Pacific Metals entered the Mining
Association Contract with Granville to jointly explore and develop the Property under applicable Bolivian laws and pursuant to the terms
and conditions of the MAC. New Pacific will cover all costs related to the exploration, development and mining of the Project and will
take 98% of the profits generated from the mining production of the Project with the remaining 2% of profits to be taken by Granville.
As the holder of mineral title of the Property, Granville will be responsible for permitting matters to keep the Property in good standing
by applicable Bolivian laws. The agreement has a term of 30 years and is renewable for an additional 15 years.
1.3.2
History
Mining activities in the Carangas
district began in the late 16th century in the Spanish colonial era. During that time, mining activities were mainly focused on oxide
materials and native silver. Currently, widespread ruins of historical mine workings are visible in the East Dome and the West Dome, historically
known as San Antonio and Espiritu Santo hills.
Following the decline of the Spanish
colonial era, mining activities in the Carangas area diminished. In 20th century, ownership of the Property was transferred between various
international and Bolivian local mining companies. Notably, in the early 20th century, mining operations were revived by Moritz Hochschild
and Federico Alhfeld, a German geologist regarded as the father of Bolivian geology was working on the Property in 1923.
There has been a very
limited amount of historical mineral exploration at Carangas. The earliest recorded exploration was conducted by COMSUR, a local
Bolivian mining company who carried out channel sampling in underground workings of the San Jose, Orcko Tunku, and San Antonio adits
in 1985, and collected over 350 samples with an average silver grade of 64 g/t Ag. Llicancabur Mining Ltda., a local Bolivia mining
company completed a total of 1,001 meters in 9 reverse circulation holes in 1995 and COMSUR drilled 914.2 meters in 6 diamond drill
holes in 2000 (Lopez-Montaño, 2019).
1.3.3
Geology and Mineralisation
The Property sits in the South
American Epithermal-Porphyry Belt, featuring a geological sequence that includes Jurassic granites and the volcanic rocks of the Negrillos
Formation and the Carangas Formation
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 9 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
of Tertiary age. The Negrillos
Formation consists of eroded lavas, tuffs, and volcanic breccias from ancient volcanic cones. Above the Negrillos Formation, the Carangas
Formation includes rhyolitic to rhyo-dacitic intrusive dykes, lithic tuffs, phreatomagmatic breccias intercalated with fluvial sediments
in upper portion and andesitic volcanoclastic rocks in the lower portion.
The Carangas area is interpreted
as a grand volcanic caldera system of Tertiary age. The Property is located at the southwest corner of the Carangas basin, and geomorphologically
is comprised of two prominent hills namely the West Dome and the East Dome, and a fluvial valley in between called the Central Valley.
In addition, there is a small hill known as South Dome near the south end of the Central Valley. At the surface of the Property, silver-lead-zinc
mineralized vein structures predominantly strike in a West- Northwest direction with steep dips, either sub-vertically or slightly dipping
to the south or the north. In addition, there are some vein sets trending in northerly and northeast directions. To depth below the shallow
silver-lead-zinc horizon, mineralization is dominated by gold plus minor amount of silver and copper in the lower portion of the mineralized
system.
Based on data obtained from drilling,
the area of West Dome and Central Valley is interpreted as a diatreme structure with a shape of inverted cone filled with breccias of
phreatomagmatic origin and rhyo-dacitic intrusive dykes. On the top of West Dome, unlithified sandy sediments with horizontal beddings
intercalated with phreatomagmatic breccias of altered rhyolitic and older volcanoclastic clasts are well exposed on surface, evidencing
a volcanic maar environment. The intrusion of magma, once reaching the meteoric water level near surface, led to a series of intense explosive
eruption and fracturing, which in turn generated abundant open spaces including cracks and pores in breccias, favorable for the circulation
of hydrothermal fluids and the deposition of sulfide minerals of metals.
Three zones of mineralization can
be recognized as zoning of different metals. The Upper Silver Zone is near surface and dominated by silver plus moderate amount of lead
and zinc. Below the upper zone, the Middle Zinc Zone is dominated by zinc plus minor silver and lead. The Lower Gold Zone is dominated
by gold plus a small amount of silver, copper, and zinc.
1.3.4 Exploration
Status
The Carangas project underwent
a systematic exploration process, beginning with the Company’s reconnaissance mapping and sampling in 2019. This initial phase was followed
by detailed surface- underground mapping and sampling throughout 2020-2021. Exploration activities continued intermittently in 2022 and
concluded with the sampling and mapping of previously inaccessible historical underground workings.
In 2020, New Pacific collected
a total of 383 rock chip samples from 55 outcrops. The samples were taken at two-meter intervals approximately perpendicular to the strike
direction of mineralization, covering a total length of 769 meters. Out of these samples, 117 returned grades ranging from 30 to 2,350
g/t Ag, with an average grade of 160 g/t Ag. Additionally, a total of 268 samples were collected from the dumps of historical mining activities.
Among these samples, 233 (86.94%) returned assay results within the range of 30 to 1,950 g/t Ag, with an average grade of 270 g/t Ag.
The Property features historical
underground mining workings. The company conducted surveys of all safe and accessible tunnels, totaling 2.4 kilometers, which are all
developed within the Carangas Formation. To date, a total of 425 samples have been collected. Among these samples, 112 (26.35%) returned
assay results ranging from 30 to 1,060 g/t Ag, with an average grade of 122 g/t Ag.
Furthermore, the company implemented
systematic geophysical surveying programs, including a ground magnetometry survey and an Offset (3D) Bipole-Dipole Induced Polarization
(IP)-Magneto-Telluric (MT) survey, from 2021 to 2023. The known mineralization system responds well to magnetic lows and IP chargeability
highs and multiple additional anomalies were identified.
1.3.5 Drilling
The Company started exploration
drilling in June 2021 and completed resource definition drilling at the end of April 2023. During that period, as many as five rigs were
running at Carangas and a total of 81,145 meters were drilled in 189 holes. Maldonado Exploraciones, a contracted drilling company from
La Paz, Bolivia, conducted all drilling which was roughly broken down to four stages.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 10 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
■ | Phase I drilling: started on June 21, 2021, and concluded on September 24, 2021.
Thirteen holes were completed, totalling 3,790.4 meters to verify historical drill results and to test the lateral and depth extent of
the known mineralization exposed on surface at West Dome and East Dome. |
| |
■ | Phase II: drilling commenced on October 6, 2021 and completed on December 17, 2021.
In this phase, 22 holes were drilled for a total of 9,420 meters with the objective to test mineralization covered by young sediments
in the Central Valley area. |
| |
■ | The Phase III: a resource definition drill program, started on February 3, 2022,
and completed on December 14, 2022. To rapidly define the mineral resource potential at Carangas, five drill rigs were employed for the
drill program. During this period, a total of 50,311 meters were drilled in 115 holes on a drill grid of approximately 50-meter spacing
and most holes intersected broad mineralization. |
| |
■ | Phase
IV: drilling is a continuation of the 2022 resource definition drill program with the aim to infill areas drilled in 2021-2022 and step
out beyond these previously drilled areas. As of the end of April 2023, a total of 39 holes were completed for a total of 17,623.5 meters
in this phase of drilling. |
1.3.6 Sample
Preparation, Assay, and QA/QC
New Pacific has established a series
of working procedures and protocols regarding core logging, sampling, core quality assurance/quality control (QAQC) and data validation,
which include the regular submission of check samples to umpire Alfred H Knight laboratory in Lima, Peru.
All drill holes were geologically
logged and sampled by New Pacific field personnel at the company’s facilities in Carangas. Geological logging included detailed
recording of lithology, alteration, mineralization, structure and RQD measurements. Drill cores are stored at a secure core storage at
the Company’s Carangas camp for future check and audit.
New Pacific personal oversees the
delivery of drill core and rock chip samples from the Carangas camp to the ALS laboratories in Oruro, Bolivia for sample preparation,
and then the pulp samples were shipped to ALS in Lima, Peru for geochemical analysis. ALS Oruro and ALS Lima are part of ALS Global, a
commercial laboratory specializing in analytical geochemistry services, all of which are accredited in accordance with ISO/IES 17025:2017
and are independent of New Pacific.
All drill core, rock chip, and grab
samples are prepared using the following procedures: (1) crush to 70% less than 2 mm; (2) riffle split of 250 g; and (3) pulverize the
split to more than 85% passing a 75-micron sieve.
New Pacific has established comprehensive
QA/QC procedures which cover every step of sampling, preparation and geochemical analysis, including insertion of certified reference
materials (CRMs), blanks, and duplicates into regular sample sequences. The use of reasonable number of different control samples is robust
and returns a good variety of verification through the whole process, and the umpire lab check analysis gives a good level of reproducibility
of the database.
The insertion ratio of control samples
is 24%, which is higher than the industry benchmark (15-20%).
In the QP’s opinion, the data acquisition,
analysis and validation comply with the best industry practices and are trustworthy for Mineral Resource Estimate and technical reporting.
1.3.7 Metallurgical
Testing
A preliminary metallurgical testwork
program was completed by Bureau Veritas Minerals (BV Minerals) in Richmond, British Columbia, Canada and ALS Metallurgy in Kamloops, British
Columbia, Canada between June 2022 and May 2023 involving five composite samples. These five composite samples were prepared using the
mineralized materials of assay sample rejects from six drill holes in the West Dome and Central Valley mineralized zones.
Among these five composite samples,
two of them were gold mineralized samples (1.8 ~ 4.0 g/t Au). These two samples were subjected to bottle roll cyanide leach testing to
recover gold. The results showed that these two samples were very amenable to cyanide leach and the preg-robbing issue was absent. Gold
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 11 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
recovery was consistently above
97% under typical cyanide leach conditions. There were signs indicating that coarse gold particles might be present in these two samples.
The third sample was collected
from the silver/lead/zinc mineralized zone near the surface of the deposit. This sample contained 167 g/t silver, 1.18% lead and 0.019%
zinc. 69% of lead minerals in this sample were oxidized. The silver/lead concentrate produced by bulk flotation contained 7,788 g/t silver
and 41.6% lead with corresponding 79.7% silver recovery and 60.1% lead recovery. One indicative cyanide leach test showed 96% of silver
in this concentrate was leachable in cyanide solution in 24 hours.
The fourth sample was collected
from the silver/lead/zinc mineralized zone close to the surface of the deposit. This sample contained 95 g/t silver, 0.85% lead and 0.48%
zinc. 39% of lead minerals in this sample were oxidized. The silver/lead concentrate produced by sequential selective flotation contained
5,612 g/t silver and 35.2% lead with corresponding 91.1% silver recovery and 64.2% lead recovery. Further work is needed to produce a
marketable zinc concentrate. One indicative cyanide leach test showed 94% of silver in this silver/lead concentrate was leachable in cyanide
solution in 24 hours.
The fifth sample was collected at
depth in the silver/lead/zinc mineralization zone. This sample contained 143 g/t silver, 0.84% lead and 1.27% zinc. Sequential selective
flotation was successful in generating two marketable concentrates. The silver/lead concentrate contained 8,596 g/t silver and 52.1% lead
with corresponding 90.9% silver recovery and 94.1% lead recovery, and the zinc concentrate contained 53.3% zinc with 80.4% zinc recovery.
One indicative cyanide leach test showed 48% of silver in the silver/lead concentrate was leachable in cyanide solution in 24 hours. When
cyanide leach retention time is extended, silver recovery is expected to increase.
1.3.8 Mineral
Resources
RPM has independently estimated
the Mineral Resources of the Carangas Project, based on the data provided by New Pacific Metals as of June 1, 2023. The Mineral Resource
estimate and underlying data comply with the guidelines of the CIM Definition Standards under NI 43-101. RPM considers it suitable for
public reporting. The QP, Mr. Anderson Goncalves Candido, completed the Mineral Resources Estimate.
Mineral Resources were reported using
a cut-off value of 40 g/t AgEq and a conceptual open pit mining constraint, assuming that extraction will be conducted using open pit
mining method. The cut-off value was determined using consensus five-year forecast of metal prices made by industry and banks.
Three zones of mineralization can
be recognized as zoning of different metals. The Upper Silver Zone, the Middle Zinc Zone and the Lower Gold Zone, The Mineral Resources
is stated in these three zones. The results of the Mineral Resource estimate for the Carangas deposit are presented in Table 1-1.
Table 1-1 Carangas Deposit -
Conceptual Pit* Constrained Mineral Resource as of 25 August 2023
Domain |
Category |
Tonnage |
AgEq |
Ag |
Au |
Pb |
Zn |
Cu |
Mt |
g/t |
Mozs |
g/t |
Mozs |
g/t |
Kozs |
% |
Mlbs |
% |
Mlbs |
% |
Mlbs |
Upper Silver Zone |
Indicated |
119.18 |
85.3 |
326.8 |
44.7 |
171.2 |
0.1 |
216.4 |
0.3 |
916.6 |
0.7 |
1,729.6 |
0.01 |
34.5 |
Inferred |
31.30 |
80.3 |
80.8 |
43.0 |
43.3 |
0.1 |
104.6 |
0.3 |
202.4 |
0.5 |
350.0 |
0.01 |
8.9 |
Middle Zinc Zone |
Indicated |
43.42 |
56.0 |
78.1 |
10.8 |
15.0 |
0.1 |
77.4 |
0.4 |
343.6 |
0.8 |
739.4 |
0.01 |
13.7 |
Inferred |
9.32 |
54.2 |
16.2 |
8.8 |
2.6 |
0.1 |
15.6 |
0.4 |
74.1 |
0.8 |
162.3 |
0.01 |
2.5 |
Lower Gold Zone |
Indicated |
52.28 |
92.1 |
154.9 |
11.4 |
19.1 |
0.8 |
1,294.4 |
0.2 |
184.7 |
0.2 |
184.7 |
0.06 |
64.4 |
Inferred |
4.37 |
91.1 |
12.8 |
12.6 |
1.8 |
0.7 |
97.5 |
0.2 |
21.4 |
0.2 |
21.4 |
0.06 |
5.4 |
Source: compiled by RPM GLOBAL, 2023
* Notes:
| 1. | CIM Definition Standards (2014) were used for reporting the Mineral Resources. |
| 2. | The Qualified Person (as defined in NI 43-101) for the purposes of the MRE is Anderson Candido,
FAusIMM, Principal Geologist with RPM (the “QP”).. |
| 3. | Mineral Resources are constrained by an optimized pit shell at a metal price of US$23.00/oz Ag, US$1,900.00/oz
Au, US$0.95/lb Pb, US$1.25/lb Zn, US$4.00/lb Cu, recovery of 90% Ag, 98% Au, 83% Pb, 58% Zn and Cut-off grade of 40 g/t AgEq and reported
as per Section 14. |
| 4. | Mineral Resources are reported inside the claim boundary. |
| 5. | Drilling results up to June 1, 2023. |
| 6. | The numbers may not compute exactly due to rounding. |
| 7. | Mineral Resources are reported on a dry in-situ basis. |
| 8. | Mineral resources are not Mineral Reserves and have not demonstrated economic viability |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 12 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Below the conceptual pit constraint,
there exists gold-dominated mineralized material of similar size and grade to the reported Mineral Resources of the Gold Domain within
the conceptual pit. This mineralized material has the potential to be converted to Mineral Resource for underground mining after further
studies in future Preliminary Economic Study stage. Gold mineralization remains open to the north and northeast at depth.
RPM considers that the reported
Mineral Resources have reasonable prospects for eventual economic extraction using open pit mining methods.
1.3.9 Mineral
Reserves
This section is not applicable.
1.3.10 Mining
Method
This section is not applicable.
1.3.11
Project Infrastructure
This section is not applicable.
1.3.12 Market
Studies
This section is not applicable.
1.3.13 Environmental,
Permitting and Social Considerations
This section is not applicable.
1.3.14 Capital
and Operating Cost Estimates
This section is not applicable.
1.3.15 Economic
Analysis
This section is not applicable.
1.3.16 Interpretation
and Conclusions
Carangas is a large silver-gold-lead-zinc
polymetallic deposit hosted in caldera-diatreme volcanic complex of Tertiary age. Mineralization is controlled by the temperature and
pressure of the underlying hydrothermal system and zoned into sperate zones: a near-surface Upper Silver Zone, a Middle Zinc Zone and
a Lower Gold Zone. Gold mineralization remains open at depth to north and northeast directions. Beyond the drilled area, there exist multiple
IP chargeability anomalies with similar geophysical signature to that of the known mineralization which constitute targets for future
drill test.
The QP is satisfied with New Pacific’s
working procedures and protocols which follows the best practices of the industry, regarding core logging, sampling, core quality assurance/quality
control (QAQC) and data validation.
The completed preliminary metallurgy
and processing tests from selected drill core rejects identified the critical processing procedures for different types of minerals and
provided vital information on the selection of proper processing flowsheets to maximize economic values of the Mineral Resources. The
QP is satisfied with the testing procedures and the interpretations of the test results.
In the opinion of the QP, the data
and information provided by New Pacific Metals was sufficient to compete this Technical Report, and there was no indication that suggested
any material error or misrepresentation during the review of the data and the preparation of the Report.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 13 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
1.3.17 Recommendations
Based on the results of the Mineral Resources estimate
and the conclusions of this Report, following recommendations are made:
| · | Continue with drilling at Carangas Project for addition of Mineral Resources and for improvement of
the confidence of Mineral Resources. A total of 12,000 m of drilling is recommended, including resource infill drilling and step-out drilling
as well as regional exploration drilling on the IP chargeability anomalies. |
| · | Continue with the existing joint research programs with local universities to better understand the
mineralization control and genesis for guiding further exploration targeting. |
| · | Initiate exploration programs of geological mapping and prospecting over the IP chargeability anomalies
for refining targets of drilling test. |
| · | Further processing and metallurgy tests to guide the upcoming advanced technical and economic studies
of the Project. |
| · | Conduct underground mining study to investigate the potential of conversion of the mineralized material
below the conceptual open pit constraint to Mineral Resources for underground mining. |
| · | Conduct a Preliminary Economic Assessment (PEA) study to understand the potential economics of the Carangas
Project. |
The total budget for above recommended work and programs is
USD3,500,000.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 14 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
2. INTRODUCTION
RPM Global Limited (“RPM”),
was requested by New Pacific Metals Corp. (“NPM”, “New Pacific”, the “Company” or the “Client”)
to complete a Mineral Resource Estimate Technical Report (“Technical Report” or the “Report”) of the Carangas
Silver-Gold Project (the “Project”, “Property” or “Relevant Asset”), located in Bolivia. This Technical
Report conforms to the NI 43-101 Standards of Disclosure for Mineral Projects of the Canadian Securities Administrators (“NI 43-101”).
2.1 Terms
of Reference
“NPM”, “New Pacific”, “the
Company” and “the Client” refer to New Pacific Metals Corp.;
“RPM” refers to RPM Global Limited and its
representatives;
“Project” refers to the Carangas Silver-Gold Project
located in Bolivia which is owned and operated by NPM;
Silver and Gold are described in terms of grams per dry metric tonnes (g/t);
Lead, Zinc and Copper are described in terms of percentage;
Resource definitions are as outlined
in the “Canadian Institute of Mining, Metallurgy and Petroleum, CIM Standards on Mineral Resource and Mineral Reserves – Definitions
and Guidelines” adopted by CIM Council on May 10, 2014.
2.2 Sources
of Information
The QP reviewed the available project
data and incorporated the results thereof with appropriate comments and adjustments as needed in the preparation of this Report. Standard
industry review procedures were used throughout the preparation of this Report. The QP used his experience to determine whether the information
from previous reports was suitable for inclusion and adjusted information as required. This Report includes technical information which
required subsequent calculations to derive subtotals, totals and weighted averages. Such calculations inherently involve a degree of rounding
and consequently introduce a margin of error. The QP does not consider any such errors to be material.
The primary source documents for this
report were as follows:
■ | Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects, (“NI 43-101”), 2011; |
| |
■ | CIM Definition Standards for Mineral Resources and Mineral Reserves, prepared by the CIM Standing Committee
on Reserve Definitions, adopted by CIM Council on May 10, 2014; |
| |
■ | Carangas Project Technical Report, Bolivia, Birak Consulting LLC, November 2022. |
The primary source documents for the
Mineral Resource estimate were:
■ | Drill hole files (assay, collar, downhole survey, lithology, RQD, core recovery) in csv format; |
| |
■ | Density measurements from drill holes in csv format; |
| |
■ | An orthophoto file in tif format; and |
| |
■ | A topography file in dxf format. |
2.3 Participants
and Responsibilities
The Qualified Person, Mr Anderson
Goncalves Candido, completed a site visit to the Project during the period from March 27 to March 30, 2023 to review field procedures
of drilling, core logging, and sampling as well as previous work,. During this visit, RPM also observed and verified site geology, site
conditions, ,
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 15 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
and data quality. In addition, open
discussions took place with the Company personnel on technical aspects related to the Project.
RPM found the New Pacific Metals project team was cooperative
and open in facilitating RPM’s work.
Project participants included:
■ | Mr. Phillipe Baudry – Project Director; |
| |
■ | Mr. Brian Hartman – Principal Geologist; |
| |
■ | Mr. Anderson Goncalves Candido – Qualified Person for Statement of Mineral Resources and for the
entire report; |
| |
■ | Mr. Marcelo del Giudice – Qualified Person for Section 13 of Mineral Processing and Metallurgical
Testing; |
2.4 Limitations
and Exclusions
This Report was prepared by RPM
for NPM and is subject to the terms and conditions of RPM’s contractual engagement with NPM. This report must be read in its entirety
and is subject to the disclaimers, limitations and exclusions contained in Appendix B of this Report. For the purposes of this
Report, items 1-8 of the limitations and exclusions in Appendix B are incorporated as if they were included verbatim in the body
of this report.
2.5 List
of Abbreviations
Units of measurement used in this report conform to
the metric system. All currency in this report is US dollars (US$) unless
otherwise noted.
Abbreviation |
|
Unit or Term |
A |
|
Ampere |
ARD |
|
acid rock drainage |
Ag |
|
silver |
Au |
|
gold |
AgEq. |
|
silver equivalent |
|
|
|
CAPEX |
|
Capital expenses |
CFM |
|
cubic feet per minute |
CoG |
|
cutoff grade |
COO |
|
Chief Operating Officer |
CST |
|
cleaner scavenger tailings |
Cu |
|
copper |
Chl |
|
chlorite |
|
|
|
dmt |
|
dry metric tonnes |
dst |
|
dry short tons |
|
|
|
EIA |
|
Environmental Impact Assessment |
EMP |
|
Environmental Management Plan |
EMS |
|
Environmental Management System |
EP |
|
Equator Principles |
EPC |
|
Engineering, Procurement, Construction |
EPCM |
|
Engineering, Procurement, Construction Management |
ESAP |
|
Environmental and Social Action Plan |
|
|
|
F&A |
|
Finance and Administration |
Feet |
|
feet, ’ or ‘ |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 16 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
FoS |
|
factor of safety |
FS |
|
Feasibility Study |
|
|
|
G & A |
|
General and Administrative |
g |
|
grams |
g/t |
|
grams per tonnes |
|
|
|
hp |
|
horsepower |
|
|
|
k |
|
Thousand |
klbs |
|
thousands of pounds |
km |
|
kilometer |
km2 |
|
square kilometers |
koz |
|
thousands of troy ounces |
kt |
|
kilo tonnes |
kV |
|
kilovolt |
kW |
|
kilowatt |
kWhr |
|
kilowatt hour |
|
|
|
l |
|
liter |
l/s |
|
liters per second |
LAN |
|
Local Area Network (computer communications system) |
lb |
|
pound |
lbs |
|
pounds |
LOM |
|
Life of Mine |
|
|
|
m |
|
meter(s) |
m3 |
|
cubic meter |
masl |
|
meters above sea level |
MDA |
|
Mineral Development Agreement |
MDE |
|
maximum design earthquake |
MDL |
|
method detection limit |
Mlb |
|
Millions of pounds |
M+I |
|
Measured and Indicated (with respect to Resources) |
Mm3 |
|
million cubic meters |
MSHA |
|
US Department of Labor – Mine Safety and Health Administration |
Mt |
|
million tonnes |
MW |
|
megawatt |
MWhr |
|
megawatt-hour |
Mw |
|
movement magnitude (of rock, by seismic activity) |
|
|
|
NPM |
|
New Pacific Metals Corp. |
NPV |
|
net present value |
NSR |
|
net smelter return |
|
|
|
OBE |
|
Operational basis earthquake |
OPEX |
|
Operational expenses |
oz. t |
|
Troy ounces |
opt |
|
Troy ounces per short ton |
|
|
|
P80 |
|
80-percent-passing size |
PAG |
|
Potentially acid generating |
PELs |
|
Mining Rights |
PC |
|
Principal Contractor |
Pb |
|
lead |
PE or PEng |
|
Professional Engineer |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 17 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
PFS |
|
Prefeasibility Study |
PG or PGeo |
|
Professional Geologist |
PGA |
|
peak ground acceleration |
PMF |
|
probable maximum flood |
ppm |
|
parts per million |
phl |
|
phlogopite |
|
|
|
QA/QC |
|
quality-assurance/quality-control |
|
|
|
Rec |
|
recovery |
RMR |
|
Rock Mass Rating |
ROI |
|
return on investment (percentage, after tax) |
RPM |
|
RPMGlobal |
|
|
|
S |
|
sulfur |
SAG |
|
semi-autogenous grinding |
SEIA |
|
Social and Environmental Impact Assessment |
SLOS |
|
Sub-Level Open Stoping |
|
|
|
tpd |
|
metric tons per day |
|
|
|
US$ |
|
US dollars |
|
|
|
WAN |
|
Wide Area Network (computer communication system) |
WRF |
|
Waste Rock Facility |
Wi |
|
Work index (grinding characteristic of rock) |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 18 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
3. RELIANCE
ON OTHER EXPERTS
All Sections of this Report were
prepared using information provided by the Company or other third parties and verified by RPM, where applicable, or based on observations
made by RPM.
The Qualified Persons have relied
on the contribution by Company and specialist consultants engaged by Company and believe there is a reasonable basis for this reliance.
The Qualified Persons do not disclaim any responsibility for this information. RPM has relied on NPM for guidance on applicable taxes,
royalties, and other government levies or interests, applicable to revenue or income from the Project.
Regarding the background, history,
ownership and tenure, RPM has relied on the information provided by the Company, including land ownership and tenure status. RPM’s
scope has specifically excluded all aspects of legal, political, land titles and agreements, excepting such aspects may directly influence
technical, operational, or cost issues.
RPM has not researched property
title or mineral rights for the Project and expresses no opinion as to the ownership status of the Property.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 19 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
4.
PROPERTY DESCRIPTION AND LOCATION
The Carangas Property is located
at Carangas region in the western portion of the Department of Oruro, Bolivia, approximately 190 kilometres (km) from the Oruro city.
The coordinates of the center of the Property are 7,906,871 Northing and 541,116 Easting (WGS84, UTM Zone 19S), corresponding to latitude
18°55’48.05” S and longitude 68°36’34.25” W. The average altitude is approximately 3,950 meters. The Property has a
total area of 40.75 square kilometres (4,075 hectares). The location of the Property is shown in Figure 4-1.
Figure 4-1 Carangas Project
General Location Plan
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 20 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
4.1
Prospecting and Exploration Licenses (PEL)
The Property consists of three mining rights (PELs) granted
to Minera Granville S.R.L. by AJAM with the following details (Table 4-1 and Figure 4-2).
Each of the PELs in Table 4-1
has a validity term of five years, with provisions for one extension of three years. Annual costs to maintain the PELs are managed
by Minera Granville. As the Property is located within 50 kilometers from international border where foreign companies or foreigners are
not permitted to have ownership of land and right of mineral, Granville remains as the holder of all licenses, permits and rights granted
to it by Bolivian authorities. To the extent known, there are no other royalties, back-in rights, payments, or other agreements and encumbrances
to which the Property is subject.
Table 4-1 Mining Rights
of Carangas Property
Concession
Number |
National
Registry |
Name |
Concession
type |
Size in Km2
(hectares) |
Title holder |
Expiration Date |
2020081 |
4-02-
2020081-
0009-23 |
Granville I |
PEL |
2.75 (275) |
Minera Granville S.R.L. |
20/11/2027 |
2020136 |
4-02-
2020136-
0088-21 |
Granville II |
PEL |
3.50 (350) |
Minera Granville S.R.L. |
14/03/2026 |
2030438 |
4-02-
2030438-
0008-23 |
Collapso |
PEL |
34.5 (3450) |
Minera Granville S.R.L. |
20/11/2027 |
Source: New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 21 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 4-2 Location of Carangas
Mineral Rights
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 22 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
As the holder of the PELs, Granville has the right to:
■ | Carry out mining exploration and prospecting activities in the mining area indicated
in the licenses for a specific term. |
■ | Have the possibility to commercialize the eventual mineral production that is obtained
exclusively from the exploration activities. |
■ | Have a preferential right (the “Preferential Right”), which allows the
holder to request the signing of an Administrative Mining Contract on the mining area preferentially over any other interested parties. |
■ | The rights of passage, which allow transit through the land and/or neighboring
properties to access the holder’s license area, under prior agreement with the landowner, and to build paths, roads, bridges, pipelines,
aqueducts, power lines, railway lines and install the necessary basic services, at its own expense and cost. |
To maintain the PELs in good standing, Granville shall:
■ | Commence exploration and prospecting activities within one year from the date of
the grant of the license. |
■ | Not suspend activities for more than one year without justifiable reason. |
■ | Deliver reports each semester on the progress of activities to AJAM (Mining Administrative
Jurisdictional Authority). |
■ | Pay the corresponding mining patent fees every year in advance according to applicable Bolivian laws. |
■ | Obtain the required environmental license before conducting prospecting and exploration
activities in the area; and |
■ | Follow the current exploration/mining Bolivian legislation and regulations. |
4.2
Terms of the Joint Venture
The Company entered the Mining
Association Contract to form a joint venture for development of the permitted mining activities under applicable Bolivian laws. The joint
venture grants the opportunity to the Company and Granville to conduct mining activities within the mining area pursuant to the terms
and conditions of the Mining Association Contract.
Terms of the joint venture were
disclosed by the Company in its management discussion and analysis for the three and nine months ended March 31, 2022, as follows (New
Pacific SEDAR issuer profile – MD&A, May 11, 2022):
“In April 2021, the Company
signed an agreement with a private Bolivian company to acquire a 98% interest in the Carangas Project. The project is located approximately
180 km southwest of the city of Oruro and within 50 km from Bolivia’s border with Chile. The private Bolivian company is 100% owned
by Bolivian nationals and holds title to the two exploration licenses that cover an area of 6.25 km2. Under the agreement, the Company
is required to cover 100% of the future expenditures on exploration, mining, development, and production activities for the project. The
agreement has a term of 30 years and is renewable for another 15 years.”
On April 20, 2023, the Mining Association
Contract was updated for inclusion of the PEL of Colapso which has an area of 3,450 hectares with all other terms of rights and obligations
unchanged, bringing the total area to 40.75 square kilometers in three PELs.
To maintain the Property in good
standing, the Company and Granville must comply with the agreement in relation to the development of the authorized mining activities.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 23 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
4.3
Environmental Liabilities
According to applicable Bolivian
laws and administrative resolutions, prior to conducting prospecting and exploration activities, the mining project or projects developed
at the Property must have their corresponding environmental licenses. To date, the projects conducted on the Property have obtained the
corresponding environmental licenses (Dispensing Certificates Category 3) granted by the government of the Department of Oruro.
The Qualified Person is not aware
of any environmental liabilities at Carangas, other than the requirements to obtain permits to conduct work. To the extent known, there
are no other significant factors and risks that may affect access, title, or the right or ability to perform work on the Property.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 24 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
5.
ACCESSIBILITY, CLIMATE, LOCAL RESOURCES, INFRASTRUCTURE AND PHYSIOGRAPHY
5.1
Physiography and Climate
The Project area is in the Western
Andes Cordillera region of Bolivia, a rugged mountains region with elevation reaching 4,000-5,000 m. At the Project area, the elevation
ranges from 4,074 m on top of the West Dome down to 3,904 m at the Carangas River running between the West Dome and the East Dome in the
core of the Property.
Vegetation on the Property consists
of low grasses and shrubs. The climate of the Western Cordillera is cool and dry, especially in winter months. In the Carangas area, high
temperatures range from 12.4°C in July to 19.2°C in October and the low temperatures range from -3.5° C in July to 3.8°C
in January (Table 5-1). Rainfall in the area is sparse and ranges from 2 mm in June to 162 mm in January. The local climate does
not limit the length of the operating season.
Table 5-1 Weather of Carangas
Region
|
Jan. |
Feb. |
Mar. |
Apr. |
May |
Jun. |
Jul. |
Aug. |
Sep. |
Oct. |
Nov. |
Dec. |
Avg. Temperature °C |
9.2°C |
9°C |
8.7°C |
7.8°C |
5.5°C |
4.5°C |
3.8°C |
5.3°C |
7.2°C |
9°C |
10.1°C |
10.4°C |
Min. Temperature °C |
3.8°C |
3.8°C |
2.4°C |
0.3°C |
-2.4°C |
-3°C |
-3.5°C |
-2.9°C |
-1.5°C |
0.2°C |
1.2°C |
3.3°C |
Max. Temperature °C |
15.4°C |
15.1°C |
15.4°C |
15.7°C |
14.3°C |
13.1°C |
12.4°C |
14.2°C |
16.3°C |
18.1°C |
19.2°C |
18.3°C |
Precipitation (mm) |
162 |
138 |
81 |
21 |
3 |
2 |
4 |
6 |
6 |
12 |
22 |
82 |
Humidity (%) |
59% |
65% |
59% |
40% |
22% |
16% |
17% |
17% |
19% |
21% |
22% |
37% |
Rainy days (d) |
15 |
13 |
11 |
4 |
1 |
0 |
1 |
1 |
1 |
2 |
3 |
9 |
Avg. Sun hours (hours) |
8.6 |
7.9 |
8.7 |
9.8 |
10 |
9.8 |
9.8 |
10.2 |
10.7 |
11.1 |
11.5 |
10.6 |
Source: climate-data.org, 2023
5.2
Accessibility, Infrastructure and Local Resources
The Project area is accessible
by vehicle from Oruro city, with approximately 197 kilometers of paved national Highway 12 leading to Sabaya., then a flat gravel road
of 35 kilometers from Sabaya to Carangas (Figure 4-1).
The closest major population center
is Oruro city, with a population about 260,000 people. Some small farming and grazing communities (pueblos) are scattered throughout the
region, the closest being Carangas, situated between the two prominent hills – the West Dome and the East Dome – on the Property.
The official population of the Carangas pueblo is 557 people but only a small number of people reside in the community on a regular basis
with the majority living in Oruro. Oruro has a long history and culture of mining since the colonial era, and sufficient supply of skilled
mining talents will be available once the Project evolves to mining production.
There are two small local rivers
running through the Property with a flow rate of approximately 20 liters per second for each of them in dry season. This water supply
is more than enough for water consumption of the Project during exploration and drilling stage and an agreement of water usage has been
reached with local communities. Approximately five kilometers south of the Property, the small rivers join a much bigger river near La
Rivera, the Todos Santos River which has a flow rate of more than one thousand liters per second in the dry season, which may provide
adequate water supply for future mining stages of the Project.
A 220 volt, single phase electric
power is available via an approximately 250 km long power line from Oruro running along the main road, Highway 12. A three-phase, industrial
power is available about 5 km to the south of the Property near the community of La Rivera.
The Carangas community has its
essential facilities such as medical clinic, school, church, soccer field and municipal offices as well as towers for mobile telecommunication.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 25 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
The Company has set up its exploration
camp facilities at Carangas, including exploration offices, accommodation and dining, core shack for logging and sampling, and storage.
Most supplies for the Project are trucked from Oruro and La Paz.
The PELs grant the Company the right
of exploration and small-scale mining only. Surface rights belong to the local communities. The Company has obtained permissions from
the local communities to build drill roads and pads and other exploration infrastructures during the exploration stage. Agreements or
permissions need to be secured from the local communities to build the mine and other facilities such as processing plant, tailing and
waste storage as well as offices and accommodations in the vast open area surrounding the Property when it moves to mining production
stage.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 26 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
6.
HISTORY
The Property has a long history of
mining since the Spanish colonial period in the mid-1500s until the 20th century when intermittent mining was continuing. In the 1980s,
Compañia Minera del Sur S.A. (“Comsur”) was active in the area and has collected 350 samples (surface dump and underground
channels).
From 1985 to 2000, a limited amount
of exploration and drilling were conducted, and most of the exploration activities were focused on investigating the geology and potential
of the West Dome area. In 1995, Llicancabur Mining Ltda. (“Llicancabur”), a Bolivian mining company completed a total of 1,001
meters of reverse circulation drilling in nine holes.
In 2000, COMSUR drilled 914.2 meters
of diamond core drilling in six holes. The results of these drill holes confirmed the significant silver mineralization previously reported
from the earlier drilling program. Noteworthy intersections include 52 meters grading 103.4 g/t silver from a depth of 24 meters in hole
DDH- 1, and 30 meters grading 62.9 g/t silver from a depth of 8.0 meters in hole DDH-5.
In 2020, a Bolivian private company
Minera Granville S.R.L. was granted the Prospecting and Exploration License in the area of Carangas.
In April 2021, New Pacific announced
it entered an agreement with Mineral Granville to jointly explore and develop the Carangas Property. Per the agreement, the Company will
cover 100% of the future expenditures of exploration, mining, development, and production activities and will take 98% of operating profits
of the Project when it moves to mining production.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 27 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
7.
GEOLOGICAL SETTING AND MINERALISATION
7.1
Regional Geology
The Bolivian Central Andes hosts
a variety of mineral deposits grouped into distinct metallogenic belts (Figure 7-1). This region hosts epithermal deposits of silver,
gold, lead, zinc and copper. From Western Cordillera to the east into the Altiplano, several small copper deposits are hosted in the red
sandstones of Tertiary age, and some gold deposits associated with subvolcanic intrusions of Tertiary age are hosted in Paleozoic metasediments.
The Eastern Cordillera (or Cordillera
Oriental) hosts numerous tin-silver-lead-zinc-tungsten-gold-antimony- bismuth deposits, traditionally known as the Bolivian Silver-Tin
Belt which stretches more than 900 km in length from Peru in the north, through Bolivia to Argentina in the south, trending from northwest
to north- south. The Bolivian Silver-Tin Belt is a significant metallogeny belt with lots of super large silver-tin deposits such as Cerro
Rico, Silver Sand, Llallagua, Huanuni, Pulacayo, etc.
Mineral deposits in the Bolivian
Central Andes are genetically related to Miocene and Pliocene subvolcanic intrusions of dacitic-rhyolitic composition. Mineralization
occurs as veins, veinlets, stockworks, and dissemination hosted in Paleozoic and Mesozoic sedimentary rocks, Cenozoic volcanic rocks,
and Paleozoic to Mesozoic plutons.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 28 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 7-1 Regional Geology
Map of Bolivia Central Andes
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 29 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
7.2
Geology of Carangas Property
The Central Andes hosts a higher
density of volcanoes of ages from Tertiary to Quaternary than any other area in the world. The region of Carangas is interested as a caldera
system of Tertiary age, which is formed over a basement consisting of a moderately deformed Triassic-Lower Jurassic crystalline bedrock
and evolved from the Upper Oligocene to Lower Miocene period as indicated by radiometric dating (Ponce & Avila 1965). The proposed
Carangas caldera is a circular structure with a central dome (Interior Caldera) approximately 20 km in diameter, surrounded by rings of
lava domes 25 to 30 km from the center (Exterior Caldera) (Figure 7-2). The central dome is interpreted as a resurgent volcanic center
with mineralization in the ring zone including mineralization systems of Carangas, Negrillos and Todos Santos.
Figure 7-2 Regional Geology
of Carangas Property
The Carangas deposit is located
at the southwest corner of the Carangas basin, a caldera in the Carangas Exterior-Caldera system. Geomorphologically, it consists of two
prominent hills, namely the West Dome and the East Dome, and a valley in between called the Central Valley (Figure 7-3). The two
domes are
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 30 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
more than 100 m above the surrounding
fluvial plains. Near the south end of the Central Valley, a small, outcropped hill is known as the South Dome. Historically, the West
Dome is referred as Espiritu Santo Hill while the East Dome as San Antonio Hill.
Based on the results of detailed
surface geological mapping and logging of drill cores by the project geologists of the Company, the Carangas deposit is interpreted as
an epithermal silver-gold mineralization system centered by a rhyolitic diatreme filled with magmatic breccia in a shape of inverted conical
structure spanning from the top of the West Dome to east in the Central Valley (Figure 7-4). The diatreme cuts through older country
rock of volcanoclastic rocks or lithic tuffs of dacitic composition in the upper part and andesitic composition in the lower part of the
Carangas Formation.
Figure 7-3 Carangas Local
Geology
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 31 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 7-4 Carangas diatreme
structure section view – looking NW
The upper part of the diatreme is
exposed on the top of the West Dome and three types of rock were identified: hydrothermal breccia, heterolithic breccia and sandy tuff.
To the west of the diatreme breccias, spotty outcrops of dacitic to rhyolitic dykes with flow banding textures are exposed on surface.
The rhyolite dykes roughly strike north-northwest direction and the flow bandings generally dipping west at high angles.
The Central Valley is fully covered
by young fluvial sediments from a few meters up to 50 m thick. Logging of drill cores indicates the rock types beneath the valley are
mainly altered phreatic breccia and lithic tuff. To the south at the South Dome, the outcropped rocks are mainly altered phreatic breccia.
Rocks in the East Dome are mainly altered lithic tuffs, likely the overlying phreatic breccias of diatreme already eroded away.
7.3
Project Mineralisation
The mineralization of Carangas consists
of a diverse suite of metallic sulphide minerals and gangue minerals, occurring as veins/veinlets, breccia fillings and dissemination.
The Company had a joint research program with the San Andrés Major University in La Paz (SAMU) to study the mineralization style
and alteration of Carangas deposit. At least three hydrothermal mineralization phases and one supergene event are identified in the project
area.
The mineralization is controlled
by temperature and pressure of hydrothermal system, i.e., the depth from ground surface or the distance from the source of heat generated
by rhyolitic intrusions. Three zones of mineralization can be recognized as zoning of different metals. The Upper Silver Zone is near
the surface and dominated by silver plus moderate amount of lead and zinc. Below the upper zone, the Middle Zinc
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 32 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Zone is dominated
by zinc plus minor silver and lead. The Lower Gold Zone is dominated by gold plus small amount of silver, copper and zinc (Figure 7-5).
The three mineralized zones are summarized in Table 7-1.
Figure 7-5 Mineralized Zones
by Metal Zoning- Oblique Section
Table 7-1 Summary of Carangas
mineralized zones
Zone |
Size |
Style of mineralization |
Mineralization |
Upper
Silver
Zone |
approximately within 200m
from surface. Dimension:
1000m (L) by 800m(W) by
200m (T) |
Disseminated silver+lead sulfides
in the metrices of
breccia in the top portion of diatreme (surface of W
Dome) and veining plus stockworks of
silver+lead+zinc sulfides
hosted in diatreme breccia
and older volcanoclastic
rocks. |
Silver
(lead, zinc) |
Middle
Zinc
Zone |
700 (L)
by 600m(W) by
150m (T)
|
Disseminated
sphalerite and veining of zinc plus
minor amount of silver and lead sulfides hosted in the
diatreme breccia and in the surrounding
older
volcaniclastic
rocks |
Zinc
(lead, silver) |
Lower
Gold
Zone |
400m (L)
by 400m(W) by
600m (T)
|
Veining of copper-silver-zinc
sulfides and
disseminated pyrite hosted in diatreme breccia and
rhyolitic intrusions as well as surrounding older
volcaniclastic rocks |
Gold
(copper±silver-
zinc) |
Source: New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 33 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
7.3.1
Upper Silver Zone
The Upper Silver Zone is formed
in a relatively low temperature and pressure environment approximately within 150 - 200 m from surface in an area of about 1,000 m long
in east-west direction by 800 m wide in north-south direction, spanning across the entire area of West Dome-Central Valley-East Dome-South
Dome of Carangas deposit. It is interpreted as the distal phase of hydrothermal alteration and mineralization system arising from the
rhyolitic intrusions at depth of the Central Valley area.
At the top area of West Dome, there
is a mineralized horizon of up to 50 m thick, composed of hydrothermal breccia of altered rhyolite clasts cemented by low temperature
silica of chalcedony, heterolithic breccia comprised of clasts of various lithologies and a matrix of fine debris of similar lithology
as the clasts as well as unlithified loose sandy tuff layers and lenses with sedimentary beddings. These three types of rocks are intercalated
with each other. The hydrothermal breccia generally contains higher grade of silver compared to heterolithic breccia and sandy tuff. When
the cementing chalcedony of hydrothermal breccia looks grey or dark in color, it may contain silver up to 1,000 ppm. Due to erosion, the
current thickness of this silver- lead horizon is from a few meters up to 50 m thick.
7.3.2
Middle Zinc Zone
When temperature and pressure of
the hydrothermal system becomes higher at depth below the Upper Silver Zone, grades of silver and lead in mineralization drop while zinc
grades rise with low grades of copper and gold locally in the lower portion of the zone.
Mineralization in the Middle Zinc
Zone is characterized by dissemination of marmatite and veining of honey sphalerite, galena, chalcopyrite, pyrite, siderite and small
amount of silver sulfosalts. This zinc-dominated zone is generally from 150 m below surface with a thickness of tens of meters up to 150
m. The Zinc Zone is interpreted to be the peripheral zone close to the core Gold Zone formed in higher temperature/pressure environment
in the vicinity of rhyolitic intrusions.
7.3.3
Lower Gold Zone
The Lower Gold Zone lies below the
Middle Zinc Zone. Mineralization in this zone is characterized by dissemination of pyrite and sulfides veining of pyrite and chalcopyrite
plus small amount of galena and sphalerite hosted in strongly argillic-sericitic altered phreatic breccia and rhyolite intrusions. This
gold zone generally begins from depth from 200 m and extends to depth more than 800 m with a lateral extent up to 400 m wide, mostly confined
to the diatreme pipe body and partially extending laterally into surrounding older volcanoclastic rocks. ASMIN lab studies indicate that
gold occurs in form of mainly as free electrum, minor amount as native gold and very sparsely as Fe (Au) sulfides, Au-Ag sulfides and
galena (Au). Grade of gold generally gets higher with depth, and highest around elevation of 3500 m in the middle part of the gold zone.
To further depth, gold grade declines but copper grade gets relatively higher than in the upper portion. This zoning of metals is likely
induced by the higher temperature/pressure environment of hydrothermal activities at depth.
Gold mineralization is fully controlled
by the diatreme pipe structure, which is associated with rhyolitic dyke intrusions, perfectly overlay with the IP chargeability anomaly
in the Central Valley area. This coincidence may imply that other IP chargeability anomalies beyond the drilled area could be good targets
of additional mineral potential and warrant drill test in the future.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 34 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
8.
DEPOSIT TYPE
Carangas is located within the Cordillera
Occidental belt close to its eastern limit with the Andes Altiplano. The Cordillera Occidental of Bolivia, along with the Altiplano and
Cordillera Oriental, altogether known as Central Andes, is part of the Andean Cordillera, a convergent plate margin (USGS and GEOBOL,
1975). The Cordillera Occidental is defined by a chain of late Miocene to Recent volcanic peaks stretching more than 750 km in length
and some 40 km wide (Arce, 2009) that straddles the Bolivia-Chile border. This volcanic arc and associated granitic plutonic rocks of
the Coastal Batholith in northern Chile and southern Peru (USGS and GEOBOL, 1975) were emplaced in and cut a Jurassic-Cretaceous aged
eugeoclinal- miogenclinal mélange of volcanic flows and ash flows with associated sedimentary rocks (sandstone, siltstone, conglomerates,
tuffaceous sediments and tuffs (Arce, 2009) all developed over Paleozoic-aged basement rocks (Figure 8-1).
Figure 8-1 Schematic cross
section of Bolivia region
Source: Arce, 2009
The project area mineralization
is a silver-gold polymetallic epithermal deposit of low-intermediate sulfidation associated with a rhyolitic maar diatreme cutting into
volcanic and volcaniclastic country rocks of Oligocene to Miocene age. The upper portion of the Carangas deposit represents a low sulfidation
zone, characterized by argillic and propylitic alterations as well as mineralization of sulfide minerals of silver, lead and zinc featured
by argentiferous galena, silver sulfosalts, minor native silver, galena, sphalerite, and various gangue minerals, including crustiform-coloform
chalcedony, banded chalcedony, smectite, zeolites, carbonates, and chlorite.
To depth, the low sulfidation zone
gradually transitions into an intermediate sulfidation zone at depth of approximately 200 m with sericitic and phyllic alteration and
mineralization dominated by gold and a small amount of copper, represented by minerals of electrum, chalcopyrite, pyrite and native gold.
Recent microscopic studies conducted in 2022 have further identified the presence of other copper minerals, including enargite (Cu3AsS4)
and famatinite (Cu3SbS4). The zone of intermediate sulfidation
extends from depth about 200 m to depth more than 700 m. The mineralization in this zone is mainly controlled by the diatreme structure
and the intrusion of rhyolite.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 35 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
9.
EXPLORATION
9.1
Sampling and Mapping
Silver mining history of Carangas
dates back to 16th century of the colonial era, which is evidenced by the widespread historical mining workings and dumps. Systematic
exploration programs were completed at Carangas since 2019, including surface and underground (UG) geological mapping, rock chip sampling
and mine dumps sampling, geophysical ground magnetometry surveying and induced polarization (IP) surveying. These exploration programs
are summarized in Table 9-1.
At Carangas, 1,076 samples, have
been collected from an area covering 2 km2 including chip samplesand mine dump samples. The sample
campaign covers the entire Carangas deposit. Anomalous silver results occur in zones on both domes and confirm the extensive silver mineralization
at Carangas.
Table 9-1 Summary of exploration
programs at Carangas
Year |
Type
of Work |
Conducted by |
Description |
Number of
Samples
Collected |
2019 |
Surface
and UG
mapping |
New Pacific |
Grab mine dump samples |
268 |
2020 |
Surface
and UG
Mapping |
New Pacific |
Grab dump, surface chip and underground channel sampling |
729 |
2021 |
Surface
and UG
Mapping |
New Pacific |
Underground channel sampling |
79 |
2021 |
Ground
magnetometry
survey |
Arce Geofísicos
|
309.8-line km, 67 N-S lines, 100 m line spacing |
n/a
|
2022 |
3D
Bipole-Dipole IP-
MT
survey |
Southern Rock Geophysics S.A. |
149.2-line km, approx. 10 km2. |
n/a |
2022-
2023 |
3D
Bipole-Dipole IP-
MT
survey |
Southern Rock Geophysics S.A. |
28.6-line km, approx. 29 km2. |
n/a |
2022 |
UG
mapping |
New Pacific |
|
n/a |
Source: New Pacific, 2023
During the due diligence study of
the Property in 2019, reconnaissance geology mapping and an intensive sampling program of historical mine dumps were carried out to provide
an initial understanding of the geology and mineralization of the deposit. Subject to the size of mine dump, grab samples of random selection
at each mine dump were collected at a spacing of every ten meters. At least one grab sample was collected if the size of the mine dump
is smaller than ten meters in diameter. The weight of each sample is between 2-4 kilograms. A total of 268 samples were collected, of
which 233 samples (86.94%) returned assay results between 30-1,950 g/t Ag with an average grade of 270 g/t Ag.
During the detailed surface geology
mapping in 2020, a total of 383 rock chip samples were collected from 55 outcrops by the Company. Chip samples were collected continuously
at 2 m intervals of up to 5 cm deep and 10 cm wide along sample lines oriented approximately perpendicular to the strike direction of
mineralized structures, for a total length of 769 m. Of the 383 chip samples collected, 117 samples returned a grade between 30 and 2,350
g/t Ag with an average grade of 160 g/t.
Most of the historical underground
mining workings are located at the West Dome, and the Company surveyed and mapped all accessible historical mining adits, for a total
length of 2.4 kilometers in six underground adits. Chip samples were taken continuously at every two meters along the wall of underground
workings and weight of each sample is about 2-5 kg. A total of 425 samples were collected, of which 112 samples (26.35%) returned assay
results between 30 and 1,060 g/t Ag with an average grade of 122 g/t Ag.
During the site visit, the QP examined
the mineralized outcrops and sampling sites at Carangas and concluded that the sampling is representative of the mineralization. The QP
did not identify any factors that could have resulted in sample biases.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 36 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
9.2
Geophysics
The Company completed geophysical
surveying programs including Ground Magnetometry surveying and Offset (3D) Bipole-Dipole Induced Polarization/Resistivity (IP) and Magneto-Telluric
(MT) surveying at Carangas in years 2021, 2022 and 2023.
The Ground Magnetometry Surveying
was conducted by Arce Geofiscos based in Lima, Peru from November 2021 until January 2022. A total of 309.8-line kilometers in 67 North-South
lines (100m spaced lines) were completed to cover the entire Carangas area.
Results of the magnetometry survey
at Carangas show a prominent low magnetic response approximately centered in the area of the Carangas village including the area with
surface mineralization and alteration exposed at the West Dome-Central Valley-East Dome. Magnetic inversion modelling indicates the lower
magnetic response extends down to more than 1,000 m depth. The vast magnetic low beyond and to the north of the drilled area of the West
Dome-Central Valley-East Dome may imply potential of additional mineralization and justifies drill testing in future drilling campaigns.
The 3D Bipole-Dipole IP-MT Surveying
at Carangas was conducted in two separate stages:
The first stage was a pilot test carried
out in the period of July-September 2022 by Southern Rock Geophysics S.A. based in Santiago, Chile, centered in the drilled area for an
area of approximately ten square kilometers, aiming to understand the geophysical signature of the known mineralization.
The results of the test surveying
are very coherent in that multiple chargeability anomalies were identified in the surveyed area, especially with the strongest one perfectly
overlaying with the known gold mineralization in the Central Valley (Figure 9-1), which may imply IP surveying is an effective
method to identify targets of alteration and sulfidation at Carangas, and other chargeability anomalies beyond the Central Valley could
be additional mineralization systems.
An expanded second stage surveying
was conducted by the same contractor from October 2022 to January 2023 to cover the entire Carangas caldera basin area, for a total of
130,993 m line meters in an area of 29 square kilometers aiming to find more chargeability anomaly targets.
The expanded surveying confirmed
the anomalies in central drilled area of Carangas and identified additional anomalies across the Carangas caldera basin. The most prominent
anomaly of chargeability exists to the north of West Dome, trending roughly NWW parallel to the striking of the surface mineralized structures,
with the intensity of anomaly increased from a depth of 200m from surface. (elevation 3700 m), similar to the geophysical response of
the gold mineralization in the Central Valley area. This anomaly is a good target for future drilling campaigns.
Figure 9-1 IP chargeability
anomalies of Carangas Area
Source: New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 37 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
10.
DRILLING
This section details all drilling
activities completed on the Project and all the data provided to RPM to estimate the Mineral Resource. Since 2021, 189 boreholes were
drilled at Carangas Project totalling 81,145 m of diamond core drilling. These drillholes were used to compile the Mineral Resource. Drill
hole spacing averages 50 m by 50 m in the most densely drilled areas and spacing increases to 100 m by 100 m on the peripheries of the
deposit and at depth. A summary of drilling data within the Carangas Mineral Resource area is tabulated in Table 10-1, and hole
locations are shown in Figure 10.1.
Table 10-1 Carangas Drilling
History
Year |
Drilling Phase |
Carangas |
Holes |
Metres |
2021 |
Phase 1 - Discovery Drilling |
13 |
3,790.4 |
2021 |
Phase 2 - Discovery Drilling |
22 |
9,420 |
2022 |
Phase 3 - Resource Definition Drilling |
115 |
50,310.92 |
2023 |
Phase 4 - Resource Definition Drilling |
39 |
17,623.5 |
Total |
189 |
81,145 |
Source:
New Pacific, 2023
Figure 10-1 Drillhole
Location
s
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 38 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
10.1
Drilling Type
Drilling was completed using a
conventional wire-line diamond drilling technique with a triple tube core barrel inside the drilling rods to produce HQ, NQ or PQ size
diamond core. Each drill run was 3 m in length. The drill core was placed in plastic/wood core trays (each holding around 4m of drill
core) after extraction from the core barrel, where each run was marked and labelled.
10.2
Drilling Locational Data
All drill hole collar locations were
surveyed by Company surveyors utilising the Real Time Kinematic (RTK) GPS method. RPM noted that all drill collars align well with the
topography. The Client’s drilling teams utilised a Reflex EZ-trackTM, SPT GyroMaster and SPT Core Retriever instruments to measure
deviations in azimuth and inclination angles. The measurements were taken approximately every 30 m along the drill trace.
10.3
Drilling Sample Recovery
Core recoveries were calculated
by measuring the length of core recovered from each 3m run. The average core recovery is higher than 95%. Recovery was low in the voids
(historical mining activities) and overburden (mining dumps and fluvial sediments). More than 89% of core intervals have a core recovery
equal to or greater than 95%. In the opinion of the QP, there are no known factors of drilling, sampling and core recovery that could
materially impact the accuracy and reliability of the results.
10.4
Process Verification
During the site visit, RPM discussed the diamond drilling, core handling
and drilling techniques and considered them appropriate and consistent for the Mineral Resource classification. Further information is
provided in Section 12.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 39 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
11. SAMPLE
PREPARATION, ANALYSES AND SECURITY
The details of the sample preparation,
analytical methodology and sample security protocols in place for core samples from the exploration programs carried out by New Pacific
Metals are included in this section.
The 2021-2023 drill programs of
the Carangas Project were managed by New Pacific in compliance with the CIM Mineral Exploration Best Practice Guidelines and internal
working protocols. All drill cores of the Project were geologically logged and sampled by the Company’s exploration team at its
core processing facilities in accordance with the Company’s core logging & sampling protocols. A total of 58,215 half-sawn core
samples were taken and submitted for preparation and analysis.
11.1 Sample
Collection
New Pacific systematically sampled
and analysed all drill core from the 2021-2023 exploration drill programs. Core sampling totalled 58,215 half-swan core regular samples
submitted for preparation and analysis. Contracted diamond drillers used HQ size coring equipment for 189 drill holes and various size
tubes TS-HQ-NQ for deep drill holes exceeding 500 m length.
All drill holes were geologically
logged and sampled by company field personnel at the Carangas facility in accordance with Core Logging & Sampling protocols. Geological
logging includes the detailed recording of lithology, alteration, mineralization, structure and RQD measurements. Rock Codes were developed
to increase the amount and quality of geological data to create a robust geological model of the deposit. Logging data was directly entered
into MX Deposit software developed by Seequent. MX Deposit is industry standard software integrating drill core logging module, drill
hole database and QAQC tool for real time monitoring of the analytical results quality.
Core boxes were transported to the
core shed from the drilling site by driller contractor’s staff. The core was cleaned or washed, core blocks were checked, and meter-marking
was completed. Samples were generally 1 meter in length from one whole depth meter to the next, except for where a lithological contact
or alteration change was noted. Samples were a maximum of 1.5 meters and a minimum of 1.0 meter (Figure 11-1). Geologists also
mark noticeable geological, structural and alteration contacts, and intervals of poor core recovery (voids and core loss). The core was
photographed wet, using a camera mounted in a framed structure to ensure a constant angle and distance from the camera.
Figure 11-1 Drill core box
example – drill hole DCAr0171
|
|
|
|
Source: New Pacific, 2023 |
|
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 40 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
On completion of logging and sample
selection, all core boxes were transported to the core saw shed. Core was cut using a diamond saw, and unconsolidated material was split
using spoons or trowels. Each sample interval was placed in a plastic bag with a sample ticket. Sample intervals are cross checked with
the sample tag book and the pre-labelled sample bag (Figure 11-2). The outer portion of the tear-off sample tag is affixed to the
core box at the start of the sample interval and the inner tear-off tag is placed into the sample bag.
Figure 11-2 Core cutting
and sample bag
|
|
|
|
Source: New Pacific, 2023 |
|
Once sampling is complete, geologists
check the samples and seal the plastic sample bags with staples and tape. QA/QC samples are inserted into the sample sequence according
to the Company’s QA/QC protocols. Then every 8 to 12 sample bags are placed into a large poly-weave sample bag for shipping to the
laboratory for preparation.
During the site visit, RPM found
core sample preparation procedures to be well understood by company employees. RPM found all equipment used for core sample preparation
to be of reasonable quality and in line with industry standards.
11.2 Assay
Laboratory Sample Preparation and Analysis
All drill core samples collected
by New Pacific between 2021-2023 were dispatched to ALS laboratory (ALS) in Oruro, Bolivia for sample preparation, and then to ALS in
Lima, Peru for geochemical analysis. ALS Oruro and ALS Lima are part of ALS Global, an independent commercial laboratory specializing
in analytical geochemistry services. Both labs are certified in accordance with the International Organization for Standardization (ISO)
and International Electrotechnical Commission (IES) “General requirements for the competence of testing and calibration laboratories”
(ISO/IES 17025:2017).
All samples are prepared in accordance
with ALS preparation code PREP-31 an follows the main standard procedure as outlined below:
| ■ | Samples were dried and crushed to 70% less than 2 m. |
| ■ | A 250 g riffle split was taken and pulverized to >85%
passing 75 microns sieve prior to aliquot selection for digestion and analysis. |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 41 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
| ■ | The pulp samples are transferred to ALS Lima for geochemical
analysis. |
| ■ | Samples were submitted for trace level 51 elements analysis
comprised aqua regia digest with Inductively Coupled Plasma - Mass Spectroscopy finish (ICP- MS) ALS Code ME-MS41. Over limit samples
returning the results greater than Ag> 100 ppm, Pb >10,000 ppm, Cu > 10,000 ppm and Zn> 10,000 ppm were sent for ore-grade
analysis by aqua regia digestion with Inductively Coupled Plasma - Atomic Emission Spectroscopy finish (ICP-AES or AAS) analysis ALS
code OG46. Samples returning Ag assay results greater than 1,500 g/t were analyzed by fire assay and gravimetric finish ALS code Ag-GRA21.
Samples returning values over 10,000 ppm Ag were analyzed by high precision analysis by Fire Assay and gravimetric finish ALS code Ag-CON01.
Gold by Fire Assay and Atomic Absorption Spectrometry AAS analysis ALS Code Au-AA25 was performed on drill core samples selected from
long drill holes exceeding 500 m in length. |
For the 2023 drill program, no
trace level multi-element ICP analysis of drill core samples was carried out in order to shorten turnaround time and to save costs.
11.3 Bulk
Density
Specific gravity measurements are
completed by company personnel as part of routine core processing procedures. A total of 5,367 measurements were completed with a mean
SG of 2.19 for core intervals selected across various lithologies and alteration types in both mineralized and non-mineralized drill cores
at a rate of 8-9% of the total core samples. Measurements are carried out at a dedicated density weighing station using the Archimedes
principle, whereby water displacement is used to calculate approximate volume (Figure 11-3). To avoid water absorption by porous
drill cores, core interval is waxed prior to immersion in water. Weighing scale calibration is carried out before measuring on daily basis.
The bulk density of a sample is calculated
by multiplying the SG by the density of water 1 (g/cm3).
Figure 11-3 Specific gravity
Measurement
|
|
|
|
Source: New Pacific, 2023 |
|
11.4 Quality
Control Data
New Pacific has established comprehensive
QA/QC procedures and protocols which cover the entire processes of sampling, preparation, and geochemical analysis. All drilling programs
completed on the Project performed with mandatory insertions of certified reference materials (CRMs or standards), blanks, and duplicates
into normal sample sequences on a batch-by-batch basis. New Pacific monitors Ag, Au, Pb, Zn, and Cu assay values in CRMs, blanks, and
duplicates.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 42 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
The Client provided QA/QC data for
drilling completed by the company during the 2021 – 2023 exploration drilling campaigns. The QA/QC samples comprise 24% of all Carangas
samples submitted to the laboratory. RPM is of the opinion that adequate QA/QC protocols were in place for entirely drilling used to compile
the Mineral Resource estimate.
The QA/QC procedures utilized a
variety of control samples which includes Certified Reference Materials (CRM), Coarse and Pulp Blanks, Coarse, Field (1/4 core) and Pulp
Duplicate samples, and Umpire Pulp Duplicate samples. Detailed statistics of QAQC control samples is presented in Table 11-1.
Table 11-1 QA/QC samples
status
Type |
Number of Samples |
% of Total Primary Samples |
Standards (CRMs) |
3,654 |
6% |
Blanks (Coarse & Pulp) |
3,038 |
5% |
Duplicates (Coarse, Pulp & Field) |
4,269 |
7% |
Umpire Pulp |
3,573 |
6% |
Total |
14,534 |
24% |
Source: compiled by RPM GLOBAL, 2023 |
|
11.4.1 Certified
Reference Materials (CRMs)
Six different CRMs were used. Standards
CDN-GEO-1901 (a certified blank material), CDN-ME-1501 and CDN-ME-1603 were discontinued in 2022. All CRMs were supplied by CDN Resource
Laboratories of Langley, British Columbia, Canada with certified values of Ag, Au, Pb, Cu, and Zn. CRM statistics for Ag and Au are presented
in Table 11-2.
Table 11-2 CRMs of Carangas
Project
CRM |
Ag ppm |
Au ppm |
CRMs inserted |
Certified value |
2SD |
Certified value |
2SD |
2021-2023 |
CDN-GEO-1901 |
1 |
0.3 |
0.036 |
0.008 |
408 |
CDN-ME-1501 |
34.6 |
2.3 |
1.38 |
0.11 |
288 |
CDN-ME-1603 |
86 |
3 |
0.995 |
0.066 |
985 |
CDN-ME-1707 |
27.9 |
2.9 |
2.02 |
0.214 |
893 |
CDN-ME-1902 |
349 |
17 |
5.38 |
0.42 |
780 |
CDN-ME-2003 |
106 |
9 |
1.301 |
0.135 |
300 |
Source: compiled by RPM GLOBAL, 2023
New Pacific’s internal procedures
require that one CRM was inserted for every 20 samples or at a rate of 5% into a randomly insertion protocol. CRM performance is monitored
on a batch-by-batch basis. A total of 3,654 CRM samples were submitted in 2021 – 2023, equivalent to a rate of 6.0%.
Control charts are used to monitor
the analytical performance of individual CRMs over time. CRM assay results are plotted in order of date of analysis. Charts present certified
CRM value, analytical mean line, and control lines for the upper and lower warning limits calculated as analytical mean of the CRMs plus
or minus two standard deviations. The results outside the three standard deviations are considered as failures. These charts show analytical
drift, bias, trends, and outside of tolerance outliers occurring at the laboratory over time. Analytical mean line shows the variability
of analysed material.
Figure 11-4 presents CRM
control charts for silver by ICP- MS (AES or AAS) analytical methods. Sporadic outliers (yellow circle) that are slightly higher or less
than warning limits don’t affect the analytical mean, accuracy, and precision of the laboratory procedure. Failed standards were
re-assayed and investigated by the laboratory. Comparison between original and re-assayed values proved the accuracy of laboratory’s
original assay results. Overall, the CRMs have a very good performance and support the sample database for resource estimation process.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 43 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 11-4 Control chart
for CDN-ME-1501 (Ag) (July 2021 – November 2022)
| | |
| Source: New Pacific, 2023 | |
Standard CDN-ME-1707 demonstrated
relatively poor performance for gold compared with other CRMs. Failed samples were investigated and documented. Occasionally CRM material
may have concentration of elements different from the certified values. It is possible to have precise results that are not accurate.
All other CRMs inserted in the same batches passed control limits. CRMs used at Carangas to monitor Au show acceptable analytical accuracy
and provide confidence in analytical results for the span of gold grades at the deposit. All major differences were investigated, and
appropriate action was taken to fix it and return a robust data control.
11.4.2 Blank
Control Samples
Two types of blank material were
inserted into the sample sequence prior to delivery to the lab. Coarse Blank is used to assess the potential contamination during sample
preparation and Pulp Blank is used to assess the potential contamination during geochemical analysis.
The Coarse Blank material used at
Carangas Project was taken from a quarry located near Oruro city. The rock is fresh andesite with porphyritic texture containing grains
of quartz, plagioclase, biotite, and hornblende. The chemical validation of Coarse Blank was developed internally and certified that the
material could be used to this purpose. The control limits were developed by the Company after review of the analytical data, removal
of outliers, calculation of the analytical mean and standard deviation. The warning limit is set at two standard deviations. The failure
limit is set at three standard deviations.
Overall, 99.5% of the coarse blanks
are within the acceptable limits (Figure 11-5). Failed results exceeding three standard deviations were documented and investigated.
Figure 11-5 Control chart
for Coarse Blank Samples
|
|
|
|
Source: New Pacific, 2023 |
|
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 44 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
The Pulp Blank is inserted every
50 samples or at a rate of 2%. A total of 1,031 pulp blank samples were inserted in the period July 2021 – April 2023, representing
an overall insertion rate of 2.3%.
Certified pulp blank CRM CDN-GEO-1901
was used between July 2021 and April 2022. Unlike other CRMs, CDN-GEO-1901 didn’t demonstrate high accuracy (-13.57% difference
between analytical mean and certified value) for silver analysis. However, 99% of CDN-GEO-1901 samples were within the control limits
(Figure 11-6).
Since April 2022, pulp blanks were
produced from pulverized coarse blank material that has been employed to monitor potential contamination during the sample preparation.
Figure 11-6 Control chart
for Pulp Blank CDN-GEO-1901
|
|
|
|
Source: New Pacific, 2023 |
|
Overall, 99.5% of pulp blanks samples
for silver are within two standard deviations control limit. It is concluded that there is no systematic contamination during geochemical
analysis.
A total of 981 coarse blanks were
inserted into the sample sequences for gold fire assays in the period 2021-2023. Only eight coarse blanks returned results beyond failure
the limit of Au=0.025 ppm. Every out- of-control event was documented and investigated. 97% of the coarse blank samples analyzed for gold
returned with assay results equal or below 0.01 g/t Au (twice the detection limit of 0.005 ppm Au). No contamination was identified during
sample preparation and analysis.
11.4.3 Duplicate
Samples
Three types of duplicates were used
to monitor the quality of the processes of the Carangas drill programs from sampling, preparation, and analysis: twin samples or field
duplicates, coarse reject duplicates and pulp duplicates. A total of 4,269 duplicate samples were taken during the period July 2021 –
April 2023. Table 11-3 provides a statistical summary of the Relative Percent Difference (RPD) for the assay pairs between the
original and the duplicate of each type of duplicate samples.
Table 11-3 Statistical summary
for duplicate samples July 2021 – April 2023
Ag ppm |
Sample Type |
Number of samples |
Corr Coeff |
< 10% RPD |
< 20% RPD |
Field Duplicate |
1,463 |
0.939 |
50% |
70% |
Coarse Duplicate |
1,425 |
0.997 |
79% |
89% |
Pulp Duplicate |
1,381 |
0.997 |
80% |
91% |
Au ppm |
Field Duplicate |
683 |
0.95 |
55% |
66% |
Coarse Duplicate |
670 |
0.982 |
62% |
72% |
Pulp Duplicate |
671 |
0.984 |
63% |
72% |
Source: compiled by RPM GLOBAL, 2023 |
|
|
Field Duplicates are generated by quarter core to monitor
the representativeness of the sampling process. The insertion rate is 2% according to the protocols of quality control and a total of
1,463 quarter core duplicates were taken during the 2021-2023 drilling campaigns.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 45 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
The performance of the field duplicate
for silver is presented by the Thompson-Howarth precision plot (Figure 11-7) and the quantile-quantile (Q-Q) plot (Figure 11-8).
In both charts the results are reasonable and support the mineral resource database.
Figure 11-7 Precision plot
of field (1/4 core) duplicates for silver assays
|
|
|
|
Source: New Pacific, 2023 |
|
Figure 11-8 Quantile-Quantile
plot of field (1/4 core) duplicates for silver assays
|
|
|
|
Source: New Pacific, 2023 |
|
To monitor the sub-sampling or splitting
precision during sample preparation, coarse (reject) duplicate is taken immediately after the first crushing and splitting step. The duplicate
reject has similar weight as that of the original sample and follows the same preparation process as the original sample does. A total
of 1,425 coarse duplicates were taken from the 2021-2023 drilling programs, inserted at a ratio of 2% or one in every 50 samples.
The assay results of silver from
the pairs of the originals and the duplicates have a high correlation coefficient of R=0.997, and 89% sample pairs have a RPD less than
20%, which means that the sampling and splitting process is of high precision quality and is well representative of the mineralization.
In Figure 11-9 the blue dashed lines mark +10% tolerance and red lines +20% tolerance from the black 1:1 line respectively. Scatterplot
shows the nearly all duplicates are within acceptable tolerance.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 46 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 11-9 Coarse Duplicate
Precision scatterplot – silver assays
|
|
|
|
Source: New Pacific, 2023 |
|
In conclusion, both the silver
assay results and the gold assay results from the coarse duplicates demonstrate that the sample preparation process of the Carangas Project
is well preserved and acceptable for mineral resource estimate.
Pulp duplicates are used to monitor
the precision or repeatability of geochemical analysis. The samples are inserted into the regular sample sequences and are analysed by
the same lab ALS (Lima). Pulp duplicates are the second split of final pulps with similar weight as the original sample. The required
insertion rate is 2% or one in every 50 samples. A total of 1,381 pulp duplicates were taken for the 2021 - 2023 drill programs.
The assay results of silver from
the pairs have a high correlation coefficient of R=0.986, and 90% sample pairs have a RPD less than 20%, and 80% sample pairs less than
10%, which means that the process of geochemical analysis of the lab has shown high repeatability and precision. Figure 11-10 is
the Thompson- Howarth precision plot of pulp duplicates for silver the samples in 2021-2023 drill campaigns.
Figure 11-10 Precision plot
of pulp duplicates for silver assays
|
|
|
|
Source: New Pacific, 2023 |
|
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 47 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
The silver and gold assay results
from the pulp duplicates demonstrate high precision or repeatability of the geochemical analysis of ALS lab, and the assay results are
acceptable for database validation.
11.4.4 Umpire
Laboratory Samples
To assess the analytical accuracy
of ALS (Lima) as the primary lab, umpire check samples were sent to Alfred H Knight (AHK) laboratory in Lima, Peru, a second accredited
lab for check analysis of the drill core samples from the Carangas Project during August 2021 – May 2023. AHK is an independent
geochemical laboratory certified according to ISO/IEC 17025:2005 and ISO 45001:2018. The required ratio of umpire samples collected from
the pulp rejects of normal sample sequences is 5-6% or five to six umpires from every 100 primary samples according to the protocols of
quality control of New Pacific. Table 11-4 is a summary of the silver and gold assay results of sample pairs of the originals and
the umpires for the drill core samples in the period 2021 to 2023.
Table 11-4 Statistical summary
for umpire duplicates samples
Sample Type |
Element |
Number of samples |
Cor Coeff |
< 10% RPD |
< 20% RPD |
Umpire Pulp
Duplicate |
Ag ppm |
2,509 |
0.986 |
81% |
91% |
Au ppm |
1,064 |
0.935 |
38% |
58% |
Source: compiled by RPM GLOBAL, 2023 |
|
A total of 2,509 umpire samples were assayed for silver
by ICP-OES method by AHK lab with silver values ranging from 0.2 ppm to 1,725 ppm. The comparison between the original and umpire assay
pairs are displayed in Figure 11-11. A correlation coefficient of R=0.986 reveals a strong positive correlation between the original
and umpire assay results. 91% umpire duplicates have a RPD less than 20%, evidencing a good reproducibility of assay results for silver.
Figure 11-11 Umpire pulp
duplicates precision scatterplot for silver assays
|
|
|
|
Source: New Pacific, 2023 |
|
Gold performs significantly worse than silver, probably deriving
from free gold in some areas of the project.
In conclusion, the external laboratory
check analysis of silver and gold demonstrate good accuracy and precision of geochemical results produced by ALS (Lima) which supports
the database used for resource estimate procedures.
11.5 Security
and Storage
The Company’s staff takes
custody of drill cores and samples at each step of field exploration and drilling activities and no other people were allowed to enter
the working areas and the core storage without pre- approval from the Compnay’s project manager. The Project core is stored in plastic
core boxes and transported to the core logging shack. After being logged and sampled, the core boxes are shipped to a
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 48 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
secure core yard on a regular basis
for permanent storage (Figure 11-12). The samples generated from this process are shipped to the ALS preparation laboratory in
Oruro.
Core samples are collected from
the drill site at least every 24 hours as part of routine drill site inspections and supervision provided by site geologists. Geological
“quick logs”, portable XRF analyses and photographs of each core box are completed during the site inspection and before core
boxes are transported to the core logging and sampling facility. Transportation of sample bags to the laboratory is carried out by New
Pacific’s personnel using the company’s truck. The Sample Submission Order is reviewed and signed by ALS staff on arrival,
then the lab takes custody of security.
Figure 11-12 Secure core
yard storage
Source: QP’s site visit, 2023
11.6 RPM
Opinion on Adequacy of Sample Preparation, Analyses, Security and QA/QC
The RPM Qualified Person is of
the opinion that the overall QAQC process is well established and that the results support the Mineral Resources Estimation process.
The procedures and protocols employed
by the Company regarding sampling, preparation, sample security, and analysis are in accordance with industry best practices. RPM did
not identify any material concerns with the geological and analytical procedures as well as the quality of the results at Carangas Project.
The use of different control samples
is robust and returns a good variety of verification through the whole process, and the umpire lab check analysis gives a good level of
reproducibility of the database.
The insertion rate of control samples
is 24%, which is higher than the industry benchmark (15-20%).
During the site visit, RPM identified
that the sample preparation procedures and geology core logging are well established and contributed to a robust database. Good operational
procedures are in place for core preservation and storage.
RPM is of the opinion that the results
are acceptable and consistent with industry standards and recommends that New Pacific Metals maintain a continuous QAQC program for future
exploration drill campaigns to maintain the database quality.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 49 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
12.
DATA VERIFICATION
This data verification discussion herein
addresses only that data used to inform the Mineral Resources.
12.1
Data Verification Measures
RPM did not identify any data inaccuracy
or misrepresentation of the underlying assay results in the database.
The drill database for Mineral Resource
estimate was received in digital format, and RPM completed a systematic review of the data in Excel and Leapfrog software.
RPM conducted a site visit to the Carangas
Project in March 2023, viewed the outcrops, drill hole locations, artisanal old mining activities, core sheds, and held various discussions
with the project geologists of the Company. RPM examined mineralised drill hole intersections, downhole survey and assay data, survey
data, acquisition protocols, logging and sample preparation procedures, and quality assurance procedures (QA) and quality control (QC)
results.
The digital topographic file was supplied
by NPM. The 1m stereo satellite survey was conducted in 2021 by PhotoSat based in Vancouver, Canada . RPM verified drill collar locations
during the site visit and found the RL of the topography at these locations to be within the expected variations. RPM did not find any
inaccuracies related to topography surface and collar location.
RPM concluded that the data was adequately
acquired and validated following industry best practices.
12.2
Database Validation
RPM completed systematic data validation
steps after receiving the database. The following checks were completed by RPM:
| ■ | The collar table was checked for duplicate holes; |
| ■ | Down-hole data (surveys, assays, bulk density, recovery, geology) had no overlapping intervals or duplicates records and did not exceed
the hole depth as reported in the collar table; |
| ■ | Hole dips were within the range of 0° and -90°; and |
| ■ | Visual inspection of drill hole collars and traces. |
The Carangas drill hole database contains
189 drill holes representing 81,145 m. A total of 57,578 samples were analysed and comprise the current data for Mineral Resource Estimation.
RPM randomly validated approximately
5% of assay certificates against the assay records in the database. RPM did not identify any inconsistencies and believe that the assay
database is suitable for geological interpretation and Resource Estimation process.
12.3
Validation of Mineralisation
RPM viewed outcrops, drill hole locations,
and mineralised drill hole intersections during the site visit. RPM viewed the representative mineralised drill core intercepts listed
in Table 12-1 at the core shed located at the Carangas Project site.
Table 12-1 Drill Core Intervals
Viewed
BHID |
FROM |
TO |
DCAr0179 |
500.00 |
700.00 |
DCAr0096 |
0.00 |
950.00 |
Source: compiled by RPM GLOBAL, 2023 |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 50 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
The mineralisation intervals were verified
in drill core intercepts. Figure 12-1 presents some core mineralisation intercepts.
Figure 12-1 Drill core mineralization
intercepts examples
Source: QP’s site visit, 2023
12.4
Drill Hole Location Validation
During the site visit, drill collar locations
for DCAr0052, DCAr0156, DCAr00169, and DCAr00171 were checked by handheld GPS and drill hole orientations were checked by compass. Variations
of up to 1-3 meters were noted, and RPM considers this to be within the accuracy expected from the different measurement systems. Each
drill hole was capped and labelled, and they were very visible in the field (Figure 12-2).
RPM is of the opinion that drill hole
locations and orientation information supplied in the database is of a suitable standard, and the data can be used for Mineral Resource
estimation.
Figure 12-2 Drillholes collar
field registration
Source: QP’s site visit, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 51 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
12.5
Core Logging, Sampling, and Storage Facilities
The Company developed logging and sampling
procedures based on the experience of the technical team and industry standards. Geological logging included lithology, alteration, weathering,
structure, and mineralogy. During the site visit by RPM, a number of representative intervals were checked to assess logging quality.
No issues were noted. Core loss was noted as problematic in overburden/saprolitic zones and in voids (historical artisanal mining activities).
The overburden zone is considered a waste zone and is not considered in the Mineral Resource Statement.
Core photography and core recovery measurements
were carried out by assistants under a geologist’s supervision and digitally recorded into MX Deposit system. During the site visit,
RPM reviewed recent core photos and noted that the photo quality is in line with industry expectations.
The core is stored in two different core
yards on the project site. The core samples, pulps, and coarse rejects are properly stored at the core shack on the project site.
RPM noted that the technical team keeps
a well-organized workflow and a good core storage plan on site. A new core yard is under preparation to store core from future drilling
programs.
12.6
RPM Opinion on Validity of the Data
RPM is of the opinion that the drill
data is adequate for the purposes of geological interpretation and Mineral Resource estimation within the classifications applied.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 52 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
13.
MINERAL PROCESSING AND METALLURGICAL TESTING
13.1
Introduction
Preliminary metallurgical testwork was
started in June 2022 and completed in May 2023 with five composite samples which were selected from the mineralized materials of assay
sample rejects based on mineralization type and oxidation extent. The scope of work includes the detailed head analysis, bulk flotation
to generate silver/lead concentrate, sequential selective flotation to generate silver/lead concentrate and zinc concentrate, whole rock
cyanide leach for recovery of gold, and lead/silver concentrate cyanide leach for recovery of silver.
From June 2022 to October 2022, the metallurgical
testwork was carried out by Bureau Veritas Minerals (BV Minerals) in Richmond, British Columbia, Canada. A report entitled “Metallurgical
Testing for Gold, Silver, Lead and Zinc Recovery, New Pacific Metals – Carangas Project” with project# 2201207 was issued
on October 26, 2022. From October 2022 onward, the remaining metallurgical testwork was continued by ALS Metallurgy in Kamloops, British
Columbia, Canada. ALS Metallurgy also issued a report on May 31, 2023 with a title of “Metallurgical Testwork on Composites from
the Carangas Project, New Pacific Metals Corp, Bolivia” with project# KM6848.
Key metallurgical performances of these
five composite samples are:
| ■ | Cyanide leach of two gold mineralized samples (1.8 and 4.0 g/t Au) generated over 97% gold recovery. |
| ■ | One silver/lead mineralized sample (167 g/t Ag, 1.18% Pb) contained 69% of oxidized lead minerals. High-grade
silver/lead concentrate was generated from the locked cycle flotation test. The concentrate contained 7,788 g/t silver and 41.6% lead
with 79.7% silver recovery and 60.1% lead recovery. One indicative cyanide leach test showed 96% of silver in this concentrate was leachable
in cyanide solution in 24 hours. |
| ■ | One silver/lead/zinc mineralized sample (95 g/t Ag, 0.85% Pb, 0.48% Zn) contained 39% of oxidized lead
minerals. High-grade silver/lead concentrate was also generated from the locked cycle flotation test, but this concentrate was significantly
diluted with zinc, and it was not possible to produce a marketable zinc concentrate. The silver/lead concentrate contained 5,612 g/t silver,
35.2% lead and 13.0% zinc with 91.1% silver recovery and 64.2% lead recovery. One indicative cyanide leach test showed 94% of silver in
this concentrate was leachable in cyanide solution in 24 hours. |
| ■ | The fifth sample was silver/lead/zinc mineralized (143 g/t Ag, 0.84% Pb, 1.27% Zn) which corresponds to
the silver/lead/zinc mineralization at depthof the deposit. In-situ oxidation was absent for this sample. Sequential selective flotation
worked well to produce two marketable concentrates. The locked cycle flotation test generated a silver/lead concentrate containing 8,596
g/t silver and 52.1% lead with 90.9% silver recovery and 94.1% lead recovery, and a zinc concentrate containing 53.3% zinc with 80.4%
zinc recovery. One indicative cyanide leach test showed 48% of silver in this silver/lead concentrate was leachable in cyanide solution
in 24 hours. The silver dissolution trend indicated that silver recovery could increase if cyanide leach retention time was extended. |
13.2
Sample selection and detailed head assay
Five composite samples were selected from three drill holes
(DCAr001, DCAr0025 and DCAr0027) in the West Dome mineralized zone and three drill holes (DCAr0019, DCAr0026 and DCAr0031) in the Central
Valley mineralized zone. Mineralized zones, drill holes and depths for these five composite samples are shown in Table 13-1. The
contents of important elements are presented in Table 13-2 based on assays carried out by BV Minerals and ALS Metallurgy. Pb(Ox)
and Zn(Ox) represent the contents of oxidized lead minerals and zinc minerals, and were measured by ammonium acetate digestion.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 53 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Table 13-1 Selections of five
composite samples
Sample# |
Sample
Description |
Mineralized
Zone |
Drill
Hole# |
From |
To |
Sample Weight |
m |
m |
kg |
Sample 1 |
Silver/Lead Shallow - heavily
oxidized |
West Dome |
DCAR001 |
23.90 |
43.00 |
51.0 |
West Dome |
DCAr0025 |
39.70 |
65.50 |
West Dome |
DCA40027 |
29.00 |
40.50 |
Sample
2 |
Silver/Lead/Zinc Shallow - partially oxidized |
Central Valley |
DCAr0019 |
18.83 |
43.25 |
52.7 |
Central Valley |
DCAr0026 |
8.00 |
45.87 |
Sample
3 |
Silver/Lead/Zinc Deep - not oxidized |
Central Valley |
DCAr0019 |
110.05 |
171.69 |
51.5 |
Sample 4 |
Gold Low-Sulfur (<1.2% S) |
Central Valley |
DCAr0031 |
425.28 |
754.48 |
57.1 |
Sample 5 |
Gold High-Sulfur (>1.2% S) |
Central Valley |
DCAr0031 |
429.69 |
746.30 |
56.8 |
Source: New Pacific, 2023
Table 13-2 Head assays of five
composite samples
Element |
Unit |
Lab |
Sample 1 |
Sample 2 |
Sample 3 |
Sample 4 |
Sample 5 |
Silver/Lead
Shallow - heavily
oxidized |
Silver/Lead/Zinc
Shallow - partially
oxidized |
Silver/Lead/Zinc
Deep - not oxidized |
Gold
Low-Sulfur |
Gold
High-Sulfur |
Silver |
Ag |
ppm |
BV |
199.10 |
143.10 |
157.00 |
10.00 |
7.70 |
ALS |
150.00 |
100.00 |
135.00 |
/ |
/ |
Lead |
Pb |
% |
BV |
1.13 |
0.85 |
0.85 |
0.05 |
0.08 |
ALS |
1.13 |
0.89 |
0.86 |
/ |
/ |
Pb(Ox) |
% |
ALS |
0.78 |
0.35 |
/ |
/ |
/ |
Zinc |
Zn |
% |
BV |
0.02 |
0.51 |
1.42 |
0.02 |
0.03 |
ALS |
0.01 |
0.48 |
1.26 |
/ |
/ |
Zn(Ox) |
% |
ALS |
/ |
0.01 |
/ |
/ |
/ |
Gold |
Au |
ppm |
BV |
<0.01 |
<0.01 |
0.03 |
1.82 |
4.02 |
Antimony |
Sb |
ppm |
BV |
153.60 |
51.60 |
99.40 |
27.50 |
39.20 |
Arsenic |
As |
ppm |
BV |
194.00 |
472.00 |
184.00 |
110.00 |
154.00 |
Carbon |
C |
% |
BV |
<0.02 |
0.03 |
1.04 |
1.07 |
1.20 |
Copper |
Cu |
ppm |
BV |
99.10 |
147.00 |
666.80 |
806.20 |
1,134.00 |
Iron |
Fe |
% |
BV |
1.86 |
2.09 |
6.77 |
6.02 |
8.64 |
ALS |
1.48 |
1.20 |
5.90 |
/ |
/ |
Mercury |
Hg |
ppm |
BV |
0.29 |
0.03 |
0.07 |
0.02 |
0.03 |
Sulfur |
S |
% |
BV |
0.41 |
0.70 |
1.84 |
0.62 |
3.07 |
ALS |
0.39 |
0.70 |
1.88 |
/ |
/ |
Source: New Pacific, 2023
Sample 1 was located near the surface of the deposit. It contained
silver and lead with minor zinc and gold. 69% of lead mineralization was oxidized in this sample.
Sample 2 was also located near the surface of the deposit.
It contained silver, lead and zinc. 39% of lead mineralization was oxidized in this sample. Oxidation of zinc mineralization was negligible.
Sample 3 was located deep in the silvdr/lead/zinc mineralization
zone in the deposit. It contained silver, lead and zinc. Gold content was 0.03 g/t. In-situ oxidation was absent for this sample.
Sample 4 was located in the gold mineralization zone. It contained
gold with sulfur content less than 1.2%. Content of silver, lead and zinc were 10.0 g/t, 0.05% and 0.02%, respectively.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 54 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Sample 5 was similar to Sample 4, but
its sulfur content was higher (over 1.2%). Higher sulfur content means more pyrite, and this may indicate the level of refractory nature
for gold extraction.
13.3
Bulk flotation testwork for Sample 1
Bulk flotation testwork for Sample 1
was carried out by BV Minerals in Richmond, British Columbia, Canada from June to September 2022. The remaining testwork for this sample
was continued by ALS Metallurgy in Kamloops, British Columbia, Canada from October 2022 to May 2023. The objective of bulk flotation was
to generate a marketable silver/lead concentrate.
13.3.1
Bulk rougher flotation testwork for Sample 1 completed by BV Minerals
BV Minerals completed five rougher tests
for Sample 1. Common conditions were 1.0 kg mineralized sample for each flotation test, 2.5 – 3.0-litre float cell, stainless steel
rod mill for grinding, grind size (80% passing) 75 µm, DF250 (frother), and 16 minutes (2+2+4+8) flotation time.
| ■ | The first rougher test (F1) applied pH 8.0 (adjusted with lime) and 30 g/t AP3418A (collector). A 3 litre
float cell was used. |
| ■ | The second rougher test (F2) increased pH to 9.5 (adjusted with lime) and introduced 30 g/t sodium cyanide.
Collector dosage was same as F1. Same cell size (3 litre). |
| ■ | The third rougher test (F7) was carried out at pH 9.0 (adjusted with soda ash), 30 g/t sodium cyanide,
100 g/t copper sulfate, 30 g/t AP3418A and 45 g/t Aero 404 (collector). |
| ■ | The fourth rougher test (F13) introduced the sulfidizing conditioning (300+200+100+50 g/t sodium hydrosulfide),
pH 9.0 (adjusted with soda ash), 400 g/t copper sulfate, 80 g/t AP3418A, 80 g/t Aero 404, and 2.5 litre cell size. |
| ■ | The fifth rougher test (F17) introduced a stronger sulfidizing conditioning (1,000+1,000+500+500 g/t sodium
hydrosulfide), pH 9.0~9.5 (adjusted with soda ash), 400 g/t copper sulfate, 80 g/t AP3418A, 80 g/t Aero 404, and 2.5 litre flotation cell. |
The results show that soda ash and copper
sulfate were beneficial to silver recovery. Silver recovery as a function of concentrate mass pull is shown in Figure 13-1. With
respect to improvement of lead recovery, strong sulfidizing conditioning was necessary. This finding makes sense considering 69% of lead
mineralization in this sample was oxidized. Silver and lead recoveries as a function of concentrate mass pull are shown in Figure 13-1
and Figure 13-2, respectively.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 55 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-1 Silver recovery as
a function of concentrate mass pull for Sample 1
Source: New Pacific, 2023
Figure 13-2 Lead recovery as a function of concentrate mass pull for Sample 1
Source: New Pacific,
2023
13.3.2
Bulk flotation testwork for Sample 1 completed by ALS Metallurgy
ALS Metallurgy continued the bulk flotation
testwork for Sample 1 based on what were learnt from the work completed by BV Minerals, i.e., soda ash for pH adjustment/control, copper
sulfate for activation and sodium hydrosulphide for sulfidizing conditioning which positively contributed to the recovery of silver and
lead. ALS Metallurgy improved the sulfidizing conditioning further by controlling redox potential in a range between -300 mV and -250
mV vs AgCl/Ag. After rougher bulk flotation performance was improved, the testwork was advanced to the open-circuit cleaner flotation
tests to upgrade the rougher concentrate, and finally to the locked cycle flotation test to produce a marketable silver/lead concentrate.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 56 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
13.3.2.1
Bulk rougher flotation for Sample 1
ALS Metallurgy completed four rougher
flotation tests under these common conditions of mild steel rod mill for grinding, 2.2-litre float cell, 400 g/t copper sulfate, 80 g/t
AP3418A (collector), 80 g/t Aero 404 (collector), MIBC (frother) and 14 minutes flotation time. Specific conditions to each rougher test
are as follows.
| ■ | The first rougher test (KM6848-01) was carried out under conditions of 1.0 kg mineralized sample, mild
steel rods for grinding, grind size (80% passing) 77 µm, pH 9.2 ~ 10.1 (adjusted with lime), 3,100 g/t sodium hydrosulphide. |
| ■ | A few changes were made to the second rougher test (KM6848-04). Weight of the mineralized sample was reduced
from 1.0 kg to 0.85 kg. Mild steel rods were replaced with stainless steel rods for grinding. Grind size was finer (80% passing 65 µm).
Lime was replaced with soda ash for pH adjustment/control (pH 9.0). Addition of sodium hydrosulphide during sulfidizing conditioning was
controlled towards a targeted redox potential at -300 mV (vs AgCl/Ag) for the first rougher stage and at -250 mV for other three rougher
stages. |
| ■ | The third rougher test (KM6848-07) repeated the second rougher test (KM6848-04) at coarser grind size
(80% passing 78 µm). |
| ■ | The four rougher test (KM6848-10) repeated the second rougher test (KM6848-04) at finer grind size (80%
passing 53 µm). |
Silver and lead recoveries as a function
of concentrate mass pull are shown in Figure 13-3 and Figure 13-4, respectively. The bulk rougher flotation test F17 carried
out by BV was included in the graphs for reference.
Figure 13-3 Silver recovery
as a function of concentrate mass pull for Sample 1 by ALS
Source:
New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 57 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-4 Lead recovery as a function
of concentrate mass pull for Sample 1 by ALS
Source: New Pacific, 2023
The controlled redox potential (-300
~ -250 mV vs AgCl/Ag) seems to have a positive impact on both silver recovery and lead recovery (Figure 13-3 and Figure 13-4).
Grind size of 80% passing 65 µm (Test KM6848- 04R) was best in terms of fast flotation rate and high recovery for silver and lead.
In comparison with what BV Minerals achieved, the results from ALS Metallurgy were better because silver/lead recoveries were increased,
and dosage of sodium hydrosulphide was reduced.
By examining the mineralogy of a tailing
sample from rougher test KM6848-04R, ALS Metallurgy concluded that about 50% of lead lost to the tailing was related to cerussite (PbCO3)
and the remaining lead was related to the lead/iron sulfate minerals. The well liberated cerussite is expected to be floatable after proper
sulfidizing conditioning. However, the cerussite in this tailing sample had only about 16% liberation. Furthermore, the QEMSCAN backscatter
image indicated a rather complex texture of cerussite within the non-sulfide gangue minerals. Therefore, it will be difficult to recover
a high percentage of cerussite lost to this tailing sample.
13.3.2.2
Bulk cleaner flotation for Sample 1
ALS Metallurgy completed three open-circuit
cleaner tests for Sample 1. Common conditions for the rougher stage were 0.85 kg mineralized sample per each test, mild steel rod mill
shell and stainless steel rods for grinding, primary grind size (80% passing) 65 µm, pH 9.0 (adjusted with soda ash), -300 ~ -250
mV redox potential for sulfidizing conditioning, 400 g/t copper sulfate, 80 g/t AP3418A, 80 g/t Aero 404, 14 minutes flotation time, and
MIBC frother.
| ■ | The first cleaner test (KM6848-15) was carried out under conditions of no regrinding, 3 stages of upgrade,
pH 9.0 (adjusted with soda ash), 117 g/t sodium hydrosulphide for sulfidizing conditioning (- 250 mV vs AgCl/Ag), 50 g/t copper sulfate,
10+5+2 g/t AP3418A, 10+5+2 g/t Aero 404, 7+5+4 minutes flotation time. |
| ■ | The second cleaner test (KM6848-16) was carried out under the revised conditions. Regrinding was applied
to achieve 80% passing 11 µm. Dosage of sodium hydrosulphide was increased to 400 g/t although redox potential was still targeted
at -250 mV. Other conditions were same as the first cleaner test. |
| ■ | Some conditions for the third cleaner test (KM6848-19) were also changed in comparison with the first
cleaner test. pH was reduced to 8.5 (adjusted with soda ash). Dosage of copper sulfate was increased |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 58 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
to 100 g/t. A fourth cleaner stage was added. Dosage of
AP3418A was increased to 20+10+4+4 g/t. Dosage of Aero 404 was also increased to 20+10+4+4 g/t. Total cleaner circuit retention time:
6+5+4+3.
The first cleaner test (KM6848-15) produced
the better results. The final silver/lead concentrate contained 6,060 g/t silver at 74.0% silver recovery and 36.0% lead at 56.5% lead
recovery as shown in Figure 13-5 and Figure 13-6.
Figure 13-5 Silver recovery and
silver content in the concentrate for Sample 1
Source:
New Pacific, 2023
Figure 13-6 Lead recovery and lead content in the concentrate for Sample 1
Source: New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 59 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
13.3.2.3
Bulk locked cycle flotation for Sample 1
One locked cycle flotation test
was completed for Sample 1 (KM6848-24) using the best cleaner test conditions (KM6868-15). The test consisted of 6 cycles, 4 cleaner stages
and no regrinding. The first cleaner tail was recirculated to the rougher feed. The results of the locked cycle test are summarized in
Table 13-3.
Table 13-3 Locked cycle
flotation results for Sample 1
Product |
Mass |
Composition |
Recovery |
Ag |
Pb |
S |
Ag |
Pb |
S |
% |
g/t |
% |
% |
% |
Feed |
/ |
167 |
1.18 |
0.41 |
/ |
/ |
/ |
Silver/Lead Concentrate |
1.7 |
7,788 |
41.6 |
7.45 |
79.7 |
60.1 |
30.8 |
Tail |
98.3 |
34 |
0.48 |
0.29 |
20.3 |
39.9 |
69.2 |
Source: New Pacific, 2023
13.4
Sequential selective flotation testwork for Sample 2
13.4.1
Sequential selective rougher flotation testwork for Sample 2 completed by BV Minerals
BV Minerals completed six sequential
selective rougher flotation tests for Sample 2. In general, effective rejection of zinc during silver/lead flotation was not successful,
and it was not possible to generate a separate high-grade zinc concentrate. Therefore, only silver/lead flotation results are presented
below. Common conditions for six rougher flotation tests were 1.0 kg mineralized sample for each test, 2.5-litre float cell, stainless
steel rod mill for grinding, grind size (80% passing) 75 µm, DF250 frother and 16 minutes flotation time.
■ | The first rougher test (F3) was carried out at pH 8.50 (adjusted with lime), 50
g/t zinc sulfate and 30 g/t AP3418A (collector). |
■ | The second rougher test (F4) was carried out under the revised conditions. pH
was increased to 9.50 (adjusted with lime). 30 g/t sodium cyanide was added. Dosage of AP3418A was reduced to 30 g/t. 50 g/t zinc sulfate
was still added. |
■ | Further changes were made to the third rougher test (F8). pH was reduced back to
8.40 (adjusted with lime). Dosage of zinc sulfate was increased to 100 g/t. Dosage of AP3418A was reduced further to |
18.75 g/t.
■ | For the fourth rougher test (F10), additional changes were made. pH was increased
to 9.00 (adjusted with lime). Dosage of zinc sulfate was further increased to 200 g/t. Dosage of AP3418A was further reduced to 10 g/t. |
■ | For the fifth rougher test (F14), dosage of zinc sulfate was increased again to
500 g/t. Other conditions were same as the fourth rougher test (F10). |
■ | For the sixth rougher test (F15), dosage of zinc sulfate was increased further
to 1,000 g/t. Other conditions were same as the fourth rougher test (F10). |
Other than the rougher test with
cyanide addition (Test F4, Figure 13-7), silver recovery from other five rougher tests was relatively consistent around 90%. Because
of the large drop of silver recovery upon addition of cyanide, the use of cyanide was discontinued for Sample 2.
As per lead recovery (Figure
13-8), there was some fluctuation. The reason for a large drop of lead recovery in Test F14 (500 g/t zinc sulfate) cannot be explained,
because other rougher tests achieved higher lead recovery with more than 500 g/t zinc sulfate (Test F15) or less than 500 g/t zinc sulfate
(Test F10, F8). Nevertheless, final lead recovery was low, only around 43%. Because 39% of lead mineralization in Sample 2 was oxidized
in-situ, sulfidizing conditioning will be necessary to increase lead recovery. The sulfidizing conditioning was followed up subsequently
by ALS Metallurgy.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 60 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-7 Silver
recovery as a function of concentrate mass pull for Sample 2
Source: New Pacific, 2023
Figure
13-8 Lead recovery as a function of concentrate mass pull for Sample 2
Source: New Pacific, 2023
Based on the enrichment ratio between
silver and zinc (Figure 13-9) and the enrichment ratio between lead and zinc (Figure 13-10), the results of Test F15 (1,000
g/t zinc sulfate) were best. As a result, it can be concluded that high-level dosage of zinc sulfate is necessary to depress zinc from
floating in the silver/lead circuit. However, zinc rejection was still not good enough with 1,000 g/t zinc sulfate. Because so much zinc
was floated together with silver and lead, it was not possible to produce a separate high-grade zinc concentrate.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 61 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-9 Silver recovery versus
enrichment ratio between silver and zinc for Sample 2
Source: New Pacific, 2023
Figure 13-10 Lead recovery versus
enrichment ratio between lead and zinc for Sample 2
Source: New Pacific, 2023
13.4.2
Sequential selective flotation testwork for Sample 2 completed by ALS Metallurgy
13.4.2.1
Sequential selective rougher flotation for Sample 2
After six rougher tests were completed
by BV Minerals, ALS Metallurgy continued with another eight rougher tests. Although some improvements were made, rejection of zinc during
silver/lead flotation remained a serious problem, and thus it was not possible to generate a separate marketable zinc concentrate. Therefore,
only the results for silver/lead flotation are presented below.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 62 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
■ | The first rougher test (KM6848-02) was carried out under conditions of 1.0 kg mineralized
sample, mild steel rod mill shell and mild steel rods for grinding, grind size (80% passing) 79 µm, 1000 g/t zinc sulfate, 1000
g/t sodium hydrosulphide, pH 9.3 ~ 9.5 (adjusted with lime), 9 g/t AP3418A (collector), MIBC (frother) and 8 minutes flotation time. |
■ | Some conditions were changed for the second rougher test (KM6848-05). The mineralized
sample mass was reduced to 0.85 kg. Grinding media was changed to stainless steel rods. Grind size (80% passing) was slightly finer (71
µm) and pH 9.0 ~ 9.5 (adjusted with lime). 1000 g/t zinc sulfate was still added (to the grinding). Sodium hydrosulfide was added
to target -300 mV redox potential in stage 1 and -250 mV in other stages. One more stage was added to the rougher. Dosage of AP3418A was
5+2+2+1 g/t. Flotation time was 2+2+4+6 minutes. MIBC frother was replaced with W31 frother. W31 is a stronger frother, similar to DF250. |
■ | The third rougher test (KM6848-08) was carried out under similar conditions as
the second rougher test (KM6848-05), but collector AP3418A dosage was reduced to 3+1+1+1 g/t. |
■ | The fourth rougher test (KM6848-11) was similar to the third rougher test (KM6848-08),
but dosage of zinc sulfate was doubled to 2000 g/t. |
■ | The fifth rougher test (KM6848-13) was similar to the third rougher test (KM6848-08),
but 30 g/t sodium cyanide was added. 950 g/t of zinc sulfate was added. As with what was observed previously by BV Minerals, this rougher
test had lower silver recovery due to cyanide addition. |
■ | The sixth rougher test (KM6848-17) was similar to the third rougher test (KM6848-08),
but pH was increased drastically to 11.0. |
■ | The seventh rougher test (KM6848-20) was similar to the third rougher test (KM6848-08),
but grind size was finer (80% passing 46 µm). |
■ | The eighth rougher test (KM6848-21) was similar to the third rougher test (KM6848-08),
but 300 g/t lime was added to the grinding. |
As far as silver recovery is concerned,
with the exception of high pH (pH 11.0) (KM6848-17) and 2000 g/t zinc sulfate addition (KM6848-11), silver recovery was relatively consistent
around 91 ~ 95% (Figure 13-11). Overall, the results from ALS Metallurgy were somewhat better than what was achieved by BV Minerals.
With respect to lead recovery, a
significant improvement was achieved after sulfidizing conditioning was applied (Figure 13-12). Three rougher tests (KM6848-13,
-20 and -21) achieved best lead recovery which was around 75% at 16% concentrate mass pull.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 63 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-11 Silver recovery as a
function of concentrate mass pull for Sample 2 by ALS
Source: New Pacific, 2023
Figure
13-12 Lead recovery as a function of concentrate mass pull for Sample 2 by ALS
Source: New Pacific, 2023
Based on the enrichment ratio between
silver and zinc (Figure 13-13) and the enrichment ratio between lead and zinc (Figure 13-14), it is worth to mention that
selectivity between lead and zinc was somewhat improved with a high dosage of zinc sulfate (2000 g/t, Test KM6848-11). However, this improved
selectivity was still not good enough to generate a separate high-grade zinc concentrate after silver/lead concentrate was produced. Because
of the significant drop of silver recovery with 2000 g/t zinc sulfate (test KM6848- 11R, Figure 13-11), such high dosage of zinc
sulfate is not recommended.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 64 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure
13-13 Silver recovery versus enrichment ratio between silver and zinc for Sample 2 by ALS
Source: New Pacific, 2023
Figure 13-14 Lead recovery
versus enrichment ratio between lead and zinc for Sample 2 by ALS
Source: New Pacific, 2023
13.4.2.2
Sequential selective cleaner flotation for Sample 2
Three open-circuit cleaner flotation
tests were completed for Sample 2 by ALS Metallurgy. The conditions and results for the silver/lead flotation are presented here. The
results for the zinc flotation were insatisfactory.
The common conditions for primary
grinding and rougher stage were 0.85 kg mineralized sample, mild steel rod mill shell and stainless steel rods for grinding, 300 g/t lime
and 1000 g/t zinc sulfate added to the grinding, pH 9.1~9.2 (adjusted with lime), 6 g/t AP3418A (collector), W31 frother and 14 minutes
flotation time.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 65 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
■ | For the first cleaner test (KM6848-22), the targeted redox potential was applied
to the conditioning (- 300 ~ -250 mV) during rougher stage and to the conditioning (-250 mV) during cleaner stage. Corresponding dosages
of sodium hydrosulfide were 588+117+117+117 g/t to the rougher stage and 117 g/t to the cleaner stage. Dosage of AP3418A in the cleaner
stage was 3+1+1 g/t, and cleaner flotation time was 5+4+3 minutes. |
■ | For the second cleaner test (KM6848-23), the redox potential was not targeted during
conditioning. Instead, fixed amounts of sodium hydrosulfide were added following the best rougher test. 351+70+70+94 g/t sodium hydrosulfide
were added to the conditioning during rougher stage and 70 g/t to the conditioning during cleaner stage. |
■ | The third cleaner test (KM6848-26) investigated acidification to the conditioning
before silver/lead flotation through adding 470 g/t of sulfuric acid. |
The results of these three cleaner
tests are summarized in Table 13-4. The best results were achieved in tests 22CL and 23CL. The final silver/lead concentrate after
3 stages of upgrade was still significantly diluted by zinc (9.3% ~ 15.0%). Because of this dilution, lead content in the final silver/lead
concentrate was relatively low (35.6% ~ 37.8%). Nevertheless, silver content in the final silver/lead concentrate remained very high (3,993
~ 4,588 g/t).
Table 13-4 Silver/lead cleaner
flotation results for Sample 2
Test # |
Product |
Mass |
Composition |
Recovery |
Ag |
Pb |
Zn |
Fe |
S |
Ag |
Pb |
Zn |
Fe |
S |
% |
g/t |
% |
% |
% |
% |
% |
KM6848-22CL |
3rd Cleaner Conc |
1.1 |
3,993 |
37.8 |
9.3 |
16 |
25 |
46 |
51 |
23 |
12 |
39 |
2nd Cleaner Conc |
1.5 |
3,263 |
30.5 |
7.6 |
14 |
21 |
49 |
54 |
25 |
14 |
45 |
1st Cleaner Conc |
2.6 |
1,921 |
17.6 |
4.5 |
9 |
12 |
52 |
55 |
27 |
16 |
46 |
Rougher Conc |
11.6 |
503 |
4.6 |
1.4 |
3 |
3 |
59 |
63 |
35 |
26 |
53 |
Feed |
/ |
99 |
0.84 |
0.45 |
1.45 |
0.71 |
/ |
/ |
/ |
/ |
/ |
KM6848-23CL |
3rd Cleaner Conc |
1.1 |
4,588 |
35.6 |
15.0 |
14 |
25 |
59 |
48 |
32 |
10 |
37 |
2nd Cleaner Conc |
1.5 |
3,514 |
30.3 |
14.7 |
13 |
25 |
63 |
57 |
44 |
13 |
52 |
1st Cleaner Conc |
3.2 |
1,734 |
14.9 |
7.3 |
7 |
12 |
65 |
58 |
45 |
15 |
53 |
Rougher Conc |
12.3 |
628 |
4.5 |
2.3 |
3 |
4 |
92 |
68 |
55 |
25 |
60 |
Feed |
/ |
84 |
0.81 |
0.51 |
1.53 |
0.73 |
/ |
/ |
/ |
/ |
/ |
KM6848-26CL |
2nd+3rd Cleaner Conc |
0.7 |
3,520 |
32.0 |
9.3 |
19 |
30 |
29 |
30 |
13 |
9 |
30 |
1st Cleaner Conc |
1.3 |
2,116 |
18.6 |
5.4 |
12 |
18 |
31 |
31 |
14 |
11 |
32 |
Rougher Conc |
11.2 |
654 |
4.0 |
1.4 |
3 |
3 |
82 |
56 |
30 |
21 |
42 |
Feed |
/ |
90 |
0.80 |
0.51 |
1.50 |
0.74 |
/ |
/ |
/ |
/ |
/ |
Source: New Pacific, 2023
13.4.2.3
Sequential selective locked cycle flotation for Sample 2
One locked cycle flotation test
was completed for Sample 2 by ALS Metallurgy. The conditions from the cleaner test KM6848-23CL were followed. The test results are shown
in Table 13-5.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 66 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Table 13-5 Locked cycle
flotation results for Sample 2
Product |
Mass |
Composition |
Recovery |
Ag |
Pb |
Zn |
Fe |
S |
Ag |
Pb |
Zn |
Fe |
S |
% |
g/t |
% |
% |
% |
% |
% |
Feed |
100 |
95 |
0.85 |
0.48 |
1.30 |
0.73 |
/ |
/ |
/ |
/ |
/ |
Silver/Lead Concentrate |
1.54 |
5,612 |
35.2 |
13.0 |
12.3 |
24.2 |
91.1 |
64.2 |
42.3 |
14.6 |
51.1 |
Zinc Concentrate |
0.51 |
21 |
1.43 |
5.6 |
1.73 |
3.56 |
0.1 |
0.9 |
6.0 |
0.7 |
2.5 |
Final Tail |
Zinc 1st Clnr Tail |
9.28 |
13.7 |
0.37 |
0.17 |
1.26 |
0.31 |
1.3 |
4.0 |
3.3 |
9.0 |
3.9 |
Zinc Rougher Tail |
88.67 |
8.0 |
0.29 |
0.26 |
1.11 |
0.35 |
7.5 |
30.9 |
48.4 |
75.8 |
42.5 |
Source: New Pacific, 2023
The zinc concentrate from the locked
cycle flotation test was poor in quality with only 5.6% zinc content. Zinc recovery into this low-grade zinc concentrate was only 6.0%.
Majority of zinc was lost during rougher stage. For a feed with a low head grade (0.48% Zn) and 42.3% of it being floated into the silver/lead
concentrate, it will be difficult to produce a separate high-grade zinc concentrate in any case.
13.5
Sequential selective flotation testwork for Sample 3
13.5.1
Sequential selective rougher flotation for Sample 3 completed by BV Minerals
Six rougher tests were completed
for Sample 3 by BV Minerals. Overall, the results were positive for both silver/lead concentrate and zinc concentrate. Common conditions
for these six rougher tests were 1.0 kg mineralized sample per test, stainless steel rod mill for grinding, 2.5-litre float cell, grind
size (80% passing) 75 µm, DF250 frother and 2+2+4+8 minutes flotation time for the silver/lead circuit.
■ | The first rougher test (F5) was carried out at pH 8.0 (adjusted with lime), 130 g/t zinc sulfate, and
10+10+10+5 g/t AP3418A for the silver/lead circuit. |
■ | The second rougher test (F6) was carried out under similar conditions as the first rougher test (F5),
but pH was increased to 9.50 and 30 g/t sodium cyanide was added. |
■ | The third rougher test (F9) was similar to the first rougher test (F5), but zinc sulfate dosage was
doubled (260 g/t) and dosage of AP3418A was reduced (10+5+2.5+1.25 g/t). |
■ | The fourth rougher test (F11) was similar to the first rougher test (F5), but pH was increased to 9.50
(adjusted with lime) |
■ | The fifth rougher test (F12) was similar to the third rougher test (F9), but zinc sulfate dosage was
doubled to 520 g/t. |
■ | The sixth rougher test (F16) was carried out with further increased zinc sulfate (1000 g/t) (in grinding)
and further reduced AP3418A dosage (5+2+2+1 g/t) at pH 9.0. |
For the rougher stage of zinc circuit,
same conditions were applied, i.e., pH 11.0 (adjusted with lime), 200 g/t copper sulfate, 20+20+10+10 g/t SIPX (collector) and 2+2+4+8
minutes flotation time.
Except one test (F6) with addition
of cyanide, all other five rougher tests resulted in consistently silver recovery over 96% (Figure 13-15). Lead recovery was also
consistently over 97% except Test F6 (Figure 13-16). Even with the addition of cyanide (Test F6), final lead recovery was still
over 96%. The rejection of zinc during silver/lead flotation was significantly better than Sample 2 based on either the enrichment ratio
between silver and zinc (Figure 13-17) or the enrichment ratio between lead and zinc (Figure 13-18).
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 67 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-15 Silver recovery
as a function of concentrate mass pull for Sample 3
Source: New Pacific, 2023
Figure
13-16 Lead recovery as a function of concentrate mass pull for Sample 3
Source: New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 68 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-17 Silver recovery versus
enrichment ratio between silver and zinc for Sample 3
Source: New Pacific, 2023
Figure
13-18 Lead recovery versus enrichment ratio between lead and zinc for Sample 3
Source: New Pacific, 2023
After silver/lead were floated away, the tailing was
subject to zinc flotation. The zinc flotation performance was equally good. Final zinc recovery of Test F6 was 80% (Figure 13-19).
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 69 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-19 Zinc recovery (net)
as a function of concentrate mass pull (net) for Sample 3
Source: New Pacific, 2023
13.5.2
Sequential selective flotation testwork for Sample 3 completed by ALS Metallurgy
13.5.2.1
Sequential selective rougher flotation for Sample 3
Based on what were learnt from the
testwork completed by BV Minerals, ALS Metallurgy carried out another four rougher tests. Common conditions for the silver/lead circuit
were pH 9.0 (adjusted with lime), mild steel rod mill shell for grinding, 1000 g/t zinc sulfate added to the grinding, 5+2+2+1 g/t AP3418A
(collector), MIBC frother and 2+2+4+4 minutes flotation time.
■ | The first rougher test (KM6848-03) was carried out with 1.0
kg mineralized sample, mild steel rods for grinding, and grind size (80% passing) 96 µm. |
| |
■ | A few changes were made to the second rougher test (KM6848-06).
The mineralized sample mass was reduced to 0.85 kg. Grinding media was changed to stainless steel rods. Grind size (80% passing) was
73 µm. |
| |
■ | The third rougher test (KM6848-09) was same as the second
rougher test (KM6848-06), but grinding media was inadvertently changed back to mild steel rods. |
| |
■ | The fourth rougher test (KM6848-12) was same as the second
rougher test (KM6848-06R) by using stainless steel rods for grinding, but grind size was a little finer (80% passing 65 µm). |
The results showed that the mild
steel grinding media had a negative impact on silver recovery (Figure 13-20) and its impact on lead recovery was not consistent
(Figure 13-21). When stainless steel grinding media was used, the results between ALS Metallurgy and BV Minerals were comparable
with 94 ~ 96% silver recovery and 94 ~ 96% lead recovery. Rejection of zinc during silver/lead flotation was also good and comparable
with what was achieved by BV Minerals provided that stainless steel grinding media was used.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 70 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-20 Silver recovery
as a function of concentrate mass pull for Sample 3
Source: New Pacific, 2023
Figure 13-21 Lead recovery
as a function of concentrate mass pull for Sample 3
Source: New Pacific, 2023
Recovery versus enrichment ratios is shown in Figure 13-22
and Figure 13-23 for silver and lead, respectively.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 71 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-22 Silver recovery versus
enrichment ratio between silver and zinc for Sample 3
Source: New Pacific, 2023
Figure 13-23 Lead recovery versus
enrichment ratio between lead and zinc for Sample 3
Source: New Pacific, 2023
For the rougher stage of zinc circuit
when the tailing from silver/lead circuit was floated again, the conditions were pH 11.0 (adjusted with lime), 200 g/t copper sulfate
for Test KM6848-03R and 300 g/t for other three tests, 20+20+10 g/t SIPX for Test KM6848-03 and 20+20+10+10 g/t for other three tests,
flotation time 2+2+4 minutes for Test KM6848-03 and 2+2+4+4 g/t for other three tests.
As per zinc flotation performance
when the tailing after silver/lead was floated again, 200 g/t copper sulfate was not adequate when mild steel grinding media was used.
When dosage of copper sulfate was increased to 300 g/t, zinc flotation performance was consistent, with zinc recovery averaging 74.7%
(testes KM6848- 03,-06,-12). Zinc recovery as a function of concentrate mass pull is shown in Figure 13-24.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 72 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-24 Zinc recovery (net)
as a function of concentrate mass pull for Sample 3
Source: New Pacific, 2023
13.5.2.2
Sequential selective cleaner flotation for Sample 3
Two open-circuit cleaner tests were completed for Sample
3 by ALS Metallurgy. The first cleaner test (KM6848-14) was carried out under the following conditions:
| − | Rougher circuit – mild steel rod mill shell and stainless steel rods for grinding, 0.85 kg
mineralized sample, primary grind size (80% passing) 65 µm, 1000 g/t zinc sulfate added to the grinding, pH 9.0 (adjusted with lime), 9 g/t AP3418A, 8 minutes flotation
time, MIBC frother |
| | |
| − | Regrinding
– stainless steel rod, 500 g/t zinc sulfate, regrind size (80% passing) 12 µm |
| | |
| − | Cleaner circuit – 3 stages, pH 9.0 (adjusted with lime), 7+5+4 g/t AP3418A, MIBC frother, 3+2+2
minutes flotation time. |
| | |
| − | Rougher circuit – pH 11.0 (adjusted with lime), 300 g/t copper sulfate, 60 g/t SIPX, MIBC frother,
14 minutes flotation time. |
| | |
| − | Regrinding
– stainless rod, 150 g/t copper sulfate, regrind size (80% passing) 37 µm. |
| | |
| − | Cleaner circuit – 3 stages, pH 11.5 (adjusted with lime), 20+5+4 g/t SIPX, 6+4+3 minutes flotation
time. |
The second cleaner test (KM6848-18) was carried out under
the following conditions:
| − | Rougher circuit – mild steel rod mill shell and mild steel rod (inadvertently used) for grinding,
0.85 kg mineralized sample, grind size (80% passing) 77 µm, 1000 g/t zinc sulfate, pH 9.0 (adjusted with lime), 9 g/t AP3418A, 8
minutes flotation time, MIBC frother |
| | |
| − | Regrinding
– stainless steel rod, 500 g/t zinc sulfate, regrind size (80% passing) 16 µm |
| | |
| − | Cleaner circuit – 3 stages, pH 9.5 (adjusted with lime), 7+5+4 g/t AP3418A, MIBC frother, 3+2+2
minutes flotation time |
| | |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 73 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
| − | Rougher circuit – pH 11.0 (adjusted with lime), 300 g/t copper sulfate, 80 g/t SIPX, MIBC frother,
16 minutes flotation time. |
| | |
| − | Regrinding
– stainless rod, 150 g/t copper sulfate, regrind size (80% passing) 29 µm. |
| | |
| − | Cleaner
circuit – 3 stages, pH 11.5 (adjusted with lime), 20 g/t SIPX, 5+3+2 minutes flotation time. |
The results of these two open-circuit
cleaner tests are summarized in Table 13-6 for silver/lead concentrate and in Table 13-7 for zinc concentrate.
Table 13-6 Silver/lead cleaner
flotation results for Sample 3
Test # |
Product |
Mass |
Composition |
Recovery (net) |
Ag |
Pb |
Zn |
Fe |
S |
Ag |
Pb |
Zn |
Fe |
S |
% |
g/t |
% |
% |
% |
% |
% |
KM6848-14CL |
3rd Cleaner Conc |
1.2 |
9,870 |
62.2 |
3.6 |
5.9 |
18 |
81 |
86 |
3 |
1 |
12 |
2nd Cleaner Conc |
1.4 |
8,736 |
54.9 |
3.5 |
6.0 |
18 |
84 |
90 |
4 |
2 |
13 |
1st Cleaner Conc |
2.8 |
4,432 |
27.9 |
2.9 |
6.8 |
12 |
87 |
93 |
6 |
4 |
18 |
Rougher Conc |
12.5 |
1,062 |
6.5 |
1.9 |
7.1 |
6 |
93 |
97 |
19 |
17 |
43 |
Feed |
/ |
143 |
0.84 |
1.3 |
5.4 |
1.82 |
/ |
/ |
/ |
/ |
/ |
KM6848-18CL |
|
|
|
|
|
|
|
|
|
|
|
|
2nd Cleaner Conc |
1.3 |
8,800 |
57.3 |
5.5 |
8.5 |
20 |
80 |
88 |
5 |
2 |
14 |
1st Cleaner Conc |
2.0 |
5,611 |
37.2 |
5.2 |
10.1 |
18 |
82 |
93 |
8 |
3 |
19 |
Rougher Conc |
10.2 |
1,175 |
7.6 |
2.2 |
9.8 |
9 |
87 |
96 |
18 |
16 |
50 |
Feed |
/ |
139 |
0.82 |
1.3 |
6.2 |
1.84 |
/ |
/ |
/ |
/ |
/ |
Source: New Pacific, 2023
Table 13-7 Zinc cleaner
flotation results for Sample 3
Test # |
Product |
Mass |
Composition |
Recovery (net) |
Ag |
Pb |
Zn |
Fe |
S |
Ag |
Pb |
Zn |
Fe |
S |
% |
g/t |
% |
% |
% |
% |
% |
KM6848-14CL |
3rd Cleaner Conc |
1.6 |
296.0 |
0.7 |
56.8 |
3.6 |
30.4 |
3.4 |
1.4 |
72.5 |
1.1 |
27.4 |
2nd Cleaner Conc |
2.2 |
257.5 |
0.6 |
42.9 |
6.6 |
26.7 |
4.0 |
1.7 |
73.7 |
2.7 |
32.3 |
1st Cleaner Conc |
9.0 |
82.6 |
0.2 |
10.7 |
6.7 |
9.0 |
5.2 |
2.2 |
75.2 |
11.3 |
44.5 |
Rougher Conc |
38.4 |
24.0 |
0.1 |
2.6 |
5.2 |
2.6 |
6.4 |
2.9 |
77.9 |
37.6 |
54.5 |
Final Tailing |
49.1 |
1.7 |
0.0 |
0.1 |
5.0 |
0.1 |
0.6 |
0.3 |
3.4 |
45.8 |
2.7 |
KM6848-18CL |
3rd Cleaner Conc |
1.6 |
834.0 |
0.8 |
61.5 |
2.1 |
30.0 |
9.5 |
1.5 |
74.8 |
0.5 |
25.6 |
2nd Cleaner Conc |
2.0 |
708.6 |
0.7 |
49.5 |
5.3 |
27.5 |
10.3 |
1.8 |
76.8 |
1.7 |
29.9 |
1st Cleaner Conc |
5.0 |
309.4 |
0.4 |
20.3 |
6.8 |
13.4 |
11.1 |
2.1 |
78.0 |
5.5 |
35.9 |
Rougher Conc |
22.1 |
75.7 |
0.1 |
4.6 |
6.1 |
3.8 |
12.1 |
2.8 |
79.3 |
21.7 |
45.7 |
Final Tailing |
67.7 |
2.2 |
0.0 |
0.1 |
5.7 |
0.1 |
1.1 |
1.7 |
3.1 |
62.2 |
4.4 |
Source: New Pacific, 2023
13.5.2.3
Sequential selective locked cycle flotation for Sample 3
One locked cycle flotation test
(KM6848-25) was completed for Sample 3 by ALS Metallurgy. The primary grinding was carried out in mild steel rod mill shell with stainless
steel grinding media and 1000 g/t zinc sulfate to 80% passing 65 µm. Six cycles were included with 0.85 kg mineralized feed per
cycle.
The silver/lead rougher was carried
out at pH 9.0 (adjusted with lime), 9 g/t AP3418A and 8 minutes flotation time. The silver/lead rougher concentrate was reground with
500 g/t zinc sulfate and stainless-steel grinding media to 80% passing 15 µm. The reground rougher concentrate was upgraded in 3
stages at pH 9.0 (adjusted with lime), 10+5+4 g/t AP3418A and 5+4+3 minutes flotation time.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 74 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
The zinc rougher was carried out
at pH 11.0 (adjusted with lime), 300 g/t copper sulfate, 60 g/t SIPX and 16 minutes flotation time. The zinc rougher concentrate was reground
with addition of 250 g/t lime and 150 g/t copper sulfate. The reground zinc rougher concentrate was upgraded in 3 stages at pH 11.5 with
20+5+4 g/t SIPX and 5+4+3 minutes flotation time. The results from the locked cycle flotation test are summarized in Table 13-8.
Table 13-8 Locked cycle
flotation results for Sample 3
Source: New Pacific, 2023
As per silver/lead concentrate,
both concentrate grades (8,596 g/t silver and 52.1% lead) and recoveries (90.9% for silver and 94.1% for lead) were satisfactory. Zinc
content (8.3%) in the silver/lead concentrate was higher than what was expected. This high-level zinc in the silver/lead concentrate might
be caused by the recirculation of first cleaner tail to the rougher stage and/or by the over addition of collector in the cleaner circuit.
The zinc concentrate contained 53.3%
zinc with 80.4% zinc recovery on the basis of the mill feed.
13.6
Whole rock cyanide leach for gold recovery
Sample 4 was a gold mineralized
sample containing 0.62% sulfur. Sample 5 was also a gold mineralized sample containing 3.07% sulfur. These two samples were subjected
to the whole rock cyanide leach by BV Minerals. Each cyanide leach test was divided into two periods. The first period lasted for 54 hours
and was carried out in the absence of activated carbon. The second period lasted for 18 hours and was carried out in the presence of activated
carbon (20 g/L). The cyanide leach test with such a combination will demonstrate whether there is any preg-robbing issue.
All cyanide leach tests were carried
out at pulp density of 40% solid in a bottle roll apparatus with continuous sparging of oxygen or air. In addition to the variables of
oxygen versus air, other variables included grind size (80% passing 151 µm), lead nitrate (0 ~ 0.25 kg/t) and cyanide concentration
(0.50 ~ 1.00 g/L NaCN). Grinding was carried out in a stainless-steel rod mill. pH was controlled between 10.5 and 11.0 which was adjusted
with hydrated lime.
In total, eight cyanide leach tests
were completed. Conditions and results for these eight cyanide leach tests are summarized in Table 13-9. Final gold recovery was
over 97% for each of these two samples. Lime consumption (1.3 ~ 2.2 kg/t) was reasonable. Sodium cyanide consumption (1.23 ~ 2.45 kg/t)
was somewhat higher than normal. Cyanide consumption is expected to decrease when cyanide leach retention time is reduced and air/oxygen
sparging rate is properly controlled.
The large difference between the
calculated head grades and the assayed head grades implies that coarse gold particles might be present in these two samples.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 75 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Table 13-9 Cyanide leach
conditions and results for Sample 4 and Sample 5
Sample# |
Sample
Description |
Test
ID |
Grind Size, P80 |
Sparging
Gas |
Pre-Aeration |
Cyanide
Conc’n |
Head Grade |
Tail
Solid |
Gold
Recovery |
Reagent
Consumption |
|
Assay |
Back Calcd |
|
Pb(NO3)2 |
Time |
Cyanide |
Lime |
|
µm |
|
kg/t |
h |
g/L NaCN |
g/t |
g/t |
% |
kg/t NaCN |
kg/t Ca(OH)2 |
|
Sample
4 |
gold low-
sulfur (0.62% S) |
CIP-1 |
50 |
O2 |
0.25 |
4 |
1.00 |
1.82 |
2.35 |
0.019 |
99.2 |
2.32 |
1.3 |
|
CIP-3 |
150 |
air |
/ |
4 |
0.50 |
1.87 |
0.033 |
98.2 |
1.23 |
2.2 |
|
CIP-6 |
100 |
air |
/ |
/ |
0.50 |
2.96 |
0.030 |
99.0 |
1.83 |
2.0 |
|
CIP-7 |
100 |
O2 |
/ |
4 |
0.50 |
2.79 |
0.035 |
98.7 |
1.56 |
1.8 |
|
Sample
5 |
gold high- sulfur (3.07%
S) |
CIP-2 |
50 |
O2 |
0.25 |
4 |
1.00 |
4.02 |
3.31 |
0.033 |
99.0 |
2.45 |
1.6 |
|
CIP-4 |
150 |
air |
/ |
4 |
0.50 |
3.24 |
0.089 |
97.3 |
1.40 |
1.9 |
|
CIP-8 |
100 |
air |
/ |
/ |
0.50 |
4.28 |
0.050 |
98.8 |
1.46 |
1.7 |
|
CIP-9 |
100 |
O2 |
/ |
4 |
0.50 |
4.70 |
0.050 |
98.9 |
1.65 |
1.7 |
|
Source: New Pacific, 2023
Gold dissolution rate was a little
slower when air was used instead of oxygen and when grind size was coarser. However, after 50 hours of cyanide leach, the difference in
gold recovery was very small (Figure 13-25 and Figure 13-26).
Figure 13-25 Gold dissolution
rate in cyanide leach for Sample 4
Source: New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 76 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 13-26 Gold dissolution
rate in cyanide leach for Sample 5
Source: New Pacific, 2023
Based on these results, it can be
concluded that both Sample 4 and Sample 5 are amenable to cyanide leach and no preg-robbing issue was observed. If some of coarse gold
particles are removed via gravity concentration method, gold dissolution rate from the gravity tail is expected to be faster.
13.7
Whole rock cyanide leach for silver recovery
Whole rock cyanide leach was also
applied to three silver-bearing samples (Sample 1, Sample 2 and Sample 3) by BV Minerals. Grinding was carried out in a stainless-steel
rod mill. Each test used 1.0 kg mineralized sample. Bottle roll cyanide leach test was carried out at pulp density of 40% solid, pH 10.5~11.0
(adjusted with lime), 3.0 g/L sodium cyanide and continuous oxygen sparging. Total retention time was 72 hours with the first 54 hours
in the absence of activated carbon and the remaining 18 hours in the presence of activated carbon (30 g/L activated carbon).
The conditions and results of these
cyanide leach tests are summarized in Table 13-10 and the silver dissolution rates are presented in Figure 13-27. Due to
the indicative nature of these cyanide leach tests, operating conditions have not been optimized yet. Nevertheless, these cyanide leach
silver recoveries were encouraging. After 72 hours of cyanide leach, final silver recovery was 84.1% for Sample 1 (Ag/Pb shallow –
heavily oxidized), 84.8% for Sample 2 (Ag/Pb/Zn shallow – partially oxidized) and 74.4% for Sample 3 (Ag/Pb/Zn deep – not
oxidized). Silver dissolution rate was much faster for Sample 1 and Sample 2 compared with Sample 3.
Cyanide consumption from these cyanide
leach tests was high. With further optimization, particularly with suitable control of oxygen sparging rate, cyanide consumption is expected
to decrease.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 77 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Table 13-10 Cyanide leach
conditions and results for Sample 1, Sample 2 and Sample 3
Source: New Pacific, 2023
Figure 13-27 Silver dissolution
rate in cyanide leach for Sample 1, Sample 2 and Sample 3
Source: New Pacific, 2023
13.8
Cyanide leach of lead/silver flotation concentrate for silver recovery
The silver/lead concentrates, which
were generated by the locked cycle flotation tests from Sample 1, Sample 2 and Sample 3 were subjected to cyanide leach under very aggressive
conditions to assure the maximum possible silver recovery. The exact operating conditions were ambient temperature, mechanically agitated
baffled tank, 1.6 g/L GoldiLox (catalyst), pulp density of 10% solid, 15 g/L sodium cyanide, 5 g/L caustic soda (pH 12.1~12.4), 0.50 kg/t
lead nitrate, without air/oxygen sparging and 24 hours of retention time. The results from these three cyanide leach tests are summarized
in Table 13-11 and silver dissolution rates are presented in Figure 13-28.
After 24 hours of cyanide leach,
final silver recovery was 96.4% for the silver/lead concentrate from Sample 1 and 94.0% for the silver/lead concentrate from Sample 2.
For the silver/lead concentrate from Sample 3, silver dissolution rate was much slower (Figure 13-28) and only 47.9% of silver
in the silver/lead concentrate was dissolved in 24 hours. Based on the trend of silver dissolution rate over time, silver recovery is
expected to increase further if cyanide leach retention time is extended. Despite slower dissolution rate and lower silver recovery, it
is important to note that cyanide consumption for the silver/lead concentrate from Sample 3 was much lower than Sample 1 and Sample 2.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 78 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Because very aggressive operating
conditions were applied, consumption of chemicals was excessively high, 24 ~ 88 kg/t for sodium cyanide and 46 ~ 81 kg/t for caustic soda.
With further optimization testwork, particularly when cyanide leach is carried out at higher pulp density with less addition of catalyst
(GoldiLox), consumption of these two chemicals is expected to decrease.
Table 13-11 Cyanide leach
results for silver/lead concentrates
Ore Sample |
Sample 1
Ag/Pb shallow
heavily oxidized |
Sample 2
Ag/Pb/Zn shallow
partially oxidized |
Sample 3
Ag/Pb/Zn deep
not oxidized |
Test# |
KM6848-28CN |
KM6848-30CN |
KM6848-29CN |
Source of Silver/Lead Concentrate |
LCT, Test 24 |
LCT, Test 27 |
LCT, Test 25 |
Final Solid Tail |
Silver |
g/t |
408 |
465 |
5,440 |
Lead |
% |
46.9 |
35.9 |
53.8 |
Zinc |
% |
0.1 |
13.1 |
7.9 |
Head Grade |
Silver |
Direct Assay |
g/t |
7,547 |
5,825 |
9,435 |
Back Calculated |
11,482 |
7,761 |
10,438 |
Lead |
Direct Assay |
% |
41.8 |
36.0 |
54.2 |
Back Calculated |
/ |
/ |
/ |
Zinc |
Direct Assay |
% |
/ |
12.7 |
7.9 |
Back Calculated |
/ |
13.3 |
7.7 |
Recovery |
Silver |
2 hour |
% |
39.5 |
76.0 |
22.9 |
6 hour |
68.6 |
82.6 |
27.7 |
24 hour |
96.4 |
94.0 |
47.9 |
Zinc |
2 hour |
% |
/ |
0.40 |
0.19 |
6 hour |
/ |
0.58 |
0.23 |
24 hour |
/ |
1.22 |
0.33 |
Consumption of Sodium Cyanide |
24 hour |
kg/t NaCN |
88 |
36 |
24 |
Consumption of Caustic Soda |
24 hour |
kg/t NaOH |
81 |
46 |
46 |
Source: New Pacific, 2023
Figure 13-28 Silver dissolution
rate in cyanide leach of silver/lead concentrates
Source: New Pacific, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 79 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
13.9 Recommendations
The preliminary metallurgical testwork
has generated a series of indicative results. Further metallurgical testwork is recommended to develop this project to a next phase by
choosing an economically most viable processing flowsheet, generating necessary parameters for the process plant design, improving flotation
concentrate quality, increasing metal recovery, and reducing operating cost for the future process plant.
13.9.1 Comminution
RPM recommends as further development
at least two composite samples for each type of mineralization and degree of oxidation from every mineralized zone be measured for specific
gravity, Bond low-energy impact work index, SMC Test®, Bond rod mill work index, Bond ball mill work index and abrasion index.
The tests performed indicated that
a fine grinding would be necessary to achieve liberation, which can potentially impact capital and operating costs, as well as filtration.
13.9.2 Variability mineralized samples for flotation and cyanide leach
Variability mineralized samples
from different mineralization and oxidation extent in every mineralized zone need to be tested further for flotation and cyanide leach.
Based on the results from the preliminary metallurgical testwork program, the most problematic material came from the transition zone
where partial oxidation has occurred in-situ and zinc mineralization is still present.
For the well-behaving materials
from the gold mineralization zone and silver/lead/zinc mineralization in the deep deposit, variability mineralized samples in every mineralized
zone also need to be tested further to assure satisfactory metallurgical performance can be reproduced.
13.9.3 Column leach for the low-grade gold mineralization
If open-pit mining is chosen to
develop the resource of gold mineralization, a large pit and a high strip ratio may be expected. Therefore, a large amount of low-grade
mineralized materials will probably be generated. It is necessary to find out whether cyanide heap leach will be suitable and economic
to treat these low- grade mineralized materials. At least one column cyanide leach test is recommended.
13.9.4 Mineralogical investigation
The in-situ activated zinc mineralization
in the transition zone is most problematic to flotation, because a separate high-grade zinc concentrate cannot be produced, and the silver/lead
concentrate is heavily diluted by zinc. When this happens, the value of zinc is lost and also it will be more difficult to market the
silver/lead concentrate. It is recommended to conduct a comprehensive mineralogical investigations for one or two such samples.
13.9.5 Gravity concentration for gold mineralization
Despite over 97% gold being cyanide
leachable for the mineralized materials from the Central Valley mineralized zone, it is still worthwhile to find out how much gold is
recoverable via gravity concentration method. If some coarse gold particles are recoverable via gravity concentration method, it is desirable
to install a gravity concentration circuit for the future process plant, because the potential issue of gold lock- up is minimized and
the loss of gold to the tailing is prevented when the high-grade material is processed.
13.9.6 Whole rock cyanide leach for gold mineralization
The materials from only one drill
hole in the Central Valley mineralized zone have so far been tested, and their cyanide leachable gold recovery was over 97%. It is premature
to believe that materials from other mineralized zones will achieve similar gold recovery. At least two composite samples from each gold
mineralized zone need to be tested for cyanide leach. Rock type, alternation, depth, carbon content, sulfur content and gold grade need
to be considered when those composite samples are chosen.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 80 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
13.9.7 Cyanide leach of silver/lead concentrate
When the silver/lead concentrate
is produced from the mineralized materials near the surface of the deposit, cyanide leach resulted in satisfactory silver recovery. However,
consumption of cyanide and caustic soda was high. It will be necessary to find a way to reduce the consumption of these two chemicals
during cyanide leach.
When the silver/lead concentrate
is produced from the mineralized materials deep in the deposit, silver dissolves very slowly in the cyanide solution. Further investigation
is needed to find a way to speed up silver dissolution rate and increase final silver recovery.
13.9.8 Thickening and filtration for flotation tailings
Thickening/filtration tests are recommended
when a large amount of flotation tailings becomes available.
13.9.9 Environmental testing for the process tailings and mine waste rocks
Disposal of process tailings is
becoming more sensitive environmentally, especially with respect to potential ARD (acid rock drainage). Quick tests like ABA (acid base
accounting) and NAG (net acid generation) are recommended when representative flotation tailings become available from the locked cycle
flotation tests. These tests are also recommended for mine waste rock samples from different rock types, alterations, degree of oxidation,
carbonate contents and sulfur contents in each mineralized zone.
13.9.10 Concentrate marketing study
When silver/lead concentrate and
zinc concentrate are produced from the mineralized materials near the surface and in the transition zone of the deposit, concentrate grades
in terms of lead content and zinc content will probably be low, and thus likely not attractive to the concentrate buyers. It will be helpful
to find out the acceptable minimum lead content and maximum zinc content in the silver/lead concentrate, the deductibles, the limits of
penalty elements, the treatment/refining charges, and the formula to determine payable rates for the contained silver and lead. For the
zinc concentrate, it will be necessary to find the acceptable minimum zinc content, the deductibles, the limits of penalty elements, the
treatment/refining charges, and the formula to determine payable rates for the contained zinc and silver.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 81 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
14. MINERAL RESOURCE ESTIMATE
A Mineral Resource Estimate has
been independently completed by RPM in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards
for Mineral Resources and Mineral Reserves (CIM (2014) definitions).
A “Mineral Resource”
is defined by CIM Definition Standards as ‘a concentration or occurrence of solid material of economic interest in or on the Earth’s
crust in such form, grade (or quality) that there are reasonable prospects for eventual economic extraction. The location, quantity, grade
(or quality), continuity and other geological characteristics of a Mineral Resource are known, estimated, or interpreted from specific
geological evidence and knowledge, including sampling. Mineral Resources are sub-divided, in order of increasing geological confidence,
into Inferred, Indicated and Measured categories.
Mineral Resource Estimates are
not precise calculations, being dependent on the interpretation of limited information on the location, shape, and continuity of the occurrence
and on the available sampling results.
Information contained in this Report
is based on information provided to RPM by NPM and verified where possible by RPM. All statistical analysis and Mineral Resource Estimates
were carried out by RPM.
The Company has developed 3D mineralized
models for Ag, Au, Zn and Cu zones, and RPM has developed independent models and validated the company models through volume/geometry
comparison. RPM constructed a three-dimensional digital estimate workflow for the Ag, Au, Zn and Cu grades and compiled the Mineral Resource
model based on the statistical analysis of the data provided. RPM considers the Mineral Resource Estimate meets the general guidelines
for CIM Definition Standards for reporting of Mineral Resources at the Indicated and Inferred confidence levels.
14.1 Mineral Resource Database
The primary source documents for the
Mineral Resource Estimate were:
| ■ | Drill hole files (collar, downhole survey, lithology, assay, RQD, core recovery, alteration, structure
and mineralization) in csv format; |
| ■ | Specific Gravity (density) measurements from drill core samples in csv format; |
| ■ | 3-D models for the main mineralized zones; |
| ■ | An orthophoto file in tif format; and |
| ■ | A 1m detailed topography file in shp format. |
14.1.1 Sample Data
A comprehensive dataset of drill
hole collar, survey, assay, and geological records in digital format was provided to RPM on 01 June 2023.
The Carangas drill hole database
contains 189 drill holes representing 81,145 m. A total of 58,215 samples
were analysed and comprise the current database for Mineral Resource estimation. Assays below the detection limit were assigned to one-half
of the detection limit by NPM personnel.
A total of 27,170 RQD and 27,173
core recovery measurements from 189 drill holes existed in the database. The average core recovery within the modelled mineralized zone
is 98%, ranging from 0% to 100%. Poor sample recovery is concentrated in the overburden zone or in cavities (historical artisanal mining
or natural cavities).
RPM is of the opinion that the core
recovery is acceptable for geological interpretation, modelling, and Mineral Resource classification.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 82 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
14.1.2 Bulk Density Data
A total of 5,366 SG measurements
from 189 diamond drill holes exist from the Carangas deposit. Measurements were calculated using the weight in air versus the weight in
water method (Archimedes), by applying the following formula:
Specific Gravity = |
Weight in Air |
|
(Weight in Air − Weight in Water) |
|
The average bulk density for each
block into the 3D mineralized domain was estimated within each domain separately, using hard boundaries and using the inverse distance
(ID2) function and consider a minimum of 2 and maximum of 4 samples to estimates a block value. The estimated density values were used
for tonnage calculations in the Mineral Resource Statement. The density sample statistics for each domain is presented in Table 14-1.
Table 14-1 Density Statistics
Table
Domain |
N Samples |
Density (t/m³) |
Stdev |
Minimum |
Maximum |
Upper Silver Zone |
1,666 |
2.08 |
0.23 |
1.33 |
3.49 |
Middle Zinc Zone |
713 |
2.30 |
0.19 |
1.37 |
3.01 |
Lower Gold Zone |
877 |
2.27 |
0.21 |
1.20 |
3.22 |
Lower Copper Zone |
21 |
2.34 |
0.21 |
1.94 |
2.77 |
Source: compiled by RPM GLOBAL, 2023
14.2 Depletion Areas
There have been historic artisanal
mining activities in the project area, however this activity was limited to a few meters within the surface. The Client did not supply
RPM with the 3D artisanal mining models for depletions. Thus, artisanal mining has not been excluded from the Mineral Resource. RPM does
not envisage that this will materially influence the Mineral Resource Statement as the artisanal mining was not extensive and only in
the west and east dome area, and not into the valley area where the bulk of mineralisationis located.
14.3 Geological and Mineralisation Interpretation
Geological interpretations of the
lithological units and the geological structure were used to guide and interpret the shape of the mineralized wireframes, along with assay
results.
The 3-D mineralized zones were interpreted
based on silver equivalent variable (AgEq) and geological knowledge from the geology team. The AgEq formula is as follows:
AgEq g/t = Ag g/t + Au g/t * 82.6 + ( Pb %*2094 /100 +
Zn %*2755 /100 + Cu %* 8816 /100 ) / 0.74
The prices assumptions for the metals
are Ag: 23 US$/oz, Au: 1900 US$/oz, Pb: 0.95 US$/lb, Zn: 1.25 US$/lb, Cu: 4 US$/lb. Prices are based on bank and industry forecasts as
of August 2023.
A cut-off grade of 20 g/t AgEq was
used to create wireframes of mineralisation. Although mineralisation modelling was based on this cut-off grade approach, some unmineralized
material was included in the envelopes to maintain mineralisation continuity. This is considered suitable for the style of mineralisation.
The mineralisation zones were relatively
continuous, however they may terminate against or be displaced by structural features. In some areas, primarily in the down-dip direction,
internal unmineralized material was included to maintain continuity.
The mineralized domains were built
using Leapfrog GeoTM software, considering all major lithologies and the transitions from each domain.
The main modelled domains were developed for Ag, Au, Zn (PbZn) and Cu, (Figure 14-1) as described below:
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 83 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
| ■ | Upper Silver Zone (GM_Ag): generated using AgEq cutoff of 20 g/t. The upper boundary
is the bottom of Overburn lithology, and the lower boundary is the bottom of ABC (andesitic basalt). |
| ■ | Middle Zinc Zone (GM_PbZn): the grade shell was built using AgEq cutoff grade of
20g/t. The upper boundary is the bottom of ABC (andesitic basalt), and other boundaries are GM_Au and GM_Cu 3D wireframes. |
| ■ | Lower Gold Zone (GM_Au): generated grade shell using Au cutoff of 0.14 g/t. The
upper boundary is the bottom of ABC (andesitic basalt). |
| ■ | Lower Copper Zone (GM_Cu): This domain was generated using Cu cutoff of 0.15%.
The boundary used was GM_Au wireframe domain. This Zone is not considered material due to shortage of drill information at the depth of
the mineralization system. |
Following the geological knowledge,
a variable orientation was used for Silver domains. The variable orientation is based on ABC (Andesitic basalt) surface contact which
is controlling the ellipsoid direction to build the 3D model on Ag domain.
The Carangas deposit is described
as a suite of metallic sulphide minerals and gangue minerals, occurring in volcanic and intrusive rocks as veins/veinlets, breccia fillings
and dissemination. The mineralization is controlled by temperature and pressure of the hydrothermal system, i.e., the depth from ground
surface or the distance from the source of heat generated by rhyolitic intrusions.
Figure 14-1 Three-Dimensional
View of the Carangas Geological Model
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 84 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
14.4 Compositing and Statistics
This compositing section discussion
herein addresses only that data used to estimate the Mineral Resources.
14.4.1 Compositing
Although the most common sample
length inside the mineralized wireframes was 1.28 m (Figure 14-2), RPM selected a composite length of 1.5 meters to decrease the
variability and coefficient of variation. Decreasing the coefficient of variation during the compositing stage reduces the risk of metal
loss when applying high-grade cuts.
The composites were checked visually
in Leapfrog Geo™ software for spatial correlation with the wireframed mineralized envelopes and to assess the impact of the 1.5
meters composite length. RPM considered the chosen composite length to be representative of local variations.
Figure 14-2 Length Histogram
for Raw Assay Intervals
Source: RPM GLOBAL,
2023
14.4.2 Statistical Analysis
A complete exploratory data analysis
was performed. Univariate statistics, histograms, and box-whisker plots were constructed to investigate the dataset and determine grade
capping and compositing requirements. Log histogram for silver composites are shown in Figure 14-3, and univariate statistics for
all main grades are shown in Table 14-2.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 85 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure 14-3 Ag Log Histogram
for 1.5 m Composites
Source: RPM GLOBAL, 2023
Table 14-2 Univariate Statistics
of Grade Composites, by Domain
Domain |
Variable |
N Sample |
Mean |
Standard deviation |
Minimum |
Maximum |
Upper Silver Zone |
Ag_ppm |
15,743 |
47.80 |
203.16 |
0.04 |
14,182.00 |
Au_ppm |
3,046 |
0.02 |
0.12 |
0.01 |
3.29 |
Cu_pct |
15,743 |
0.01 |
0.03 |
0.00 |
1.61 |
Pb_pct |
15,743 |
0.38 |
0.51 |
0.00 |
14.22 |
Zn_pct |
15,743 |
0.68 |
0.86 |
0.00 |
16.76 |
Middle Zinc Zone |
Ag_ppm |
6,803 |
9.92 |
93.29 |
0.01 |
7,332.35 |
Au_ppm |
4,871 |
0.05 |
0.06 |
0.01 |
0.58 |
Cu_pct |
6,803 |
0.01 |
0.03 |
0.00 |
0.60 |
Pb_pct |
6,803 |
0.29 |
0.33 |
0.00 |
7.39 |
Zn_pct |
6,803 |
0.67 |
0.58 |
0.00 |
5.13 |
Lower Gold Zone |
Ag_ppm |
8,383 |
8.81 |
26.91 |
0.02 |
1,158.93 |
Au_ppm |
8,349 |
0.82 |
2.15 |
0.01 |
53.98 |
Cu_pct |
8,383 |
0.07 |
0.16 |
0.00 |
6.30 |
Pb_pct |
8,383 |
0.10 |
0.29 |
0.00 |
10.94 |
Zn_pct |
8,383 |
0.17 |
0.41 |
0.00 |
7.43 |
Lower Copper Zone |
Ag_ppm |
154 |
15.33 |
28.27 |
0.13 |
247.88 |
Au_ppm |
140 |
0.07 |
0.06 |
0.01 |
0.34 |
Cu_pct |
154 |
0.30 |
0.23 |
0.00 |
1.45 |
Pb_pct |
154 |
0.17 |
0.85 |
0.00 |
9.89 |
Zn_pct |
154 |
0.37 |
0.99 |
0.00 |
9.02 |
Source: compiled by RPM GLOBAL,
2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 86 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
14.4.3 High-Grade Cuts
Applying high-grade cuts reduces
the impact of extreme grade outliers on the grade estimate and aims to prevent these statistical outliers from having a significant impact
on the Mineral Resource estimate. The high-grade cuts applied to the composites were determined from the histograms and log probability
plots for each element. A domain detailed study was completed and concluded the same global top-cut values. The high-grade cut values
are shown in Table 14-3. Log probability plots are shown in Appendix A.
Table 14-3 Top Cut Values
into all Domains
Variable |
Minimum |
Maximum |
Capping Value |
Ag_ppm |
0.0 |
9,626 |
7000 |
Au_ppm |
0.0 |
53.977 |
40.0 |
Pb_pct |
0.0 |
14.220 |
No Capping |
Zn_pct |
0.0 |
16.760 |
No Capping |
Cu_pct |
0.0 |
1.612 |
No Capping |
Source: compiled by RPM GLOBAL, 2023
14.5 Mineral Resource Estimation
RPM constructed a three-dimensional
digital estimate for Ag, Au, Pb, Zn, and Cu and compiled the Mineral Resource model based on the statistical analysis of the data provided.
RPM considers the Mineral Resource estimate meets the general guidelines for CIM Definition Standards for reporting of Mineral Resources
at the Indicated and Inferred confidence levels.
14.5.1 Block Model
A block model was created for Carangas
Project and covers the main mineralized area and adjacent areas. There is no rotation for the block model, and the block sizes were selected
considering the geometry of mineralization, drill grid spacing, density of assay data and selected mining unit. The block model dimensions
selected were 5m by 5m by 5m (X,Y,Z) with no sub-cells. The block model origins, extents and attributes are shown in Table 14-4.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 87 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Table 14-4 Carangas Block
Model Definition Parameters
Model Parameters |
X |
Y |
Z |
Block Model Origin |
538,490 |
7,904,850 |
2810 |
Number of Blocks |
276 |
210 |
258 |
Parent Block Size (m) |
5 |
5 |
5 |
Rotation Degree |
No |
No |
No |
FIELD NAME |
DESCRIPTION |
GM (Zone Domain) |
Ag – Upper Silver Zone
Au – Lower Gold Zone
PbZn – Middle Zinc Zone
Cu
– Lower Copper Zone |
IJK |
Block IJK No |
|
|
XC |
Cell Centroid – X |
|
|
YC |
Cell Centroid – Y |
|
|
ZC |
Cell Centroid – Z |
|
|
XINC |
Cell Size – X |
|
|
YINC |
Cell Size – Y |
|
|
ZINC |
Cell Size – Z |
|
|
XMORIG |
Model Origin – X |
|
|
YMORIG |
Model Origin – Y |
|
|
ZMORIG |
Model Origin – Z |
|
|
NX |
Number of Cells – X |
|
NY |
Number of Cells – Y |
|
NZ |
Number of Cells – Z |
|
DENSITY |
Density |
|
|
Ag_ID2 |
Estimated Ag – Inverse distance |
|
Ag_NS |
Number samples in estimation of Ag grade |
Ag_AvgD |
Average distance of samples used in Ag estimation |
Au_ID2 |
Estimated Au – Inverse distance |
|
Cu_ID2 |
Estimated Cu – Inverse distance |
|
Pb_ID2 |
Estimated Pb – Inverse distance |
|
Zn_ID2 |
Estimated Zn – Inverse distance |
|
AgEq_ID2 |
Calculated Silver equivalent |
|
Class_Fim |
Resource Classification:
Indicated
Inferred |
Source: compiled by RPM GLOBAL, 2023
14.5.2 Block Model Strategy and Analysis
A series of upfront test modelling was completed to define
an estimation methodology to meet the following criteria:
| ■ | Representative of the current Carangas geological and structural models. |
| ■ | Accounts for the variability of grade, orientation, and continuity of mineralization. |
| ■ | Controls the smoothing (grade spreading) of grades and the influence of outliers. |
| ■ | Is robust and repeatable within the mineral domains. |
| ■ | Supports multiple domains. |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 88 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Multiple test scenarios were evaluated
to determine the optimum processes and parameters to use in order to achieve the stated criteria. Each scenario was based on NN, inverse-distance
squared (“ID2”), inverse- distance cubed (“ID3”), and OK interpolation methods.
All test scenarios were evaluated
based on global statistical comparisons, visual comparisons of composite assays versus block grades, and the assessment of overall smoothing.
Based on results of the testing, it was determined that the final resource estimation methodology would constrain the mineralization by
using hard wireframe boundaries to control the spread of high-grade and low-grade mineralization. Inverse- distance squared (ID2) was
selected as the interpolation method best representative of both the current Carangas database and deposit characteristics.
14.5.3 Grade Interpolation
The Inverse-distance squared (“ID2”)
algorithm was used for the estimation of grades, using hard boundaries of each individual domain. The Nearest Neighbor (NN) estimation
method was also performed for comparison grade validation and swath plot analysis.
The estimation parameters were based
on the outcomes of the geospatial analysis and reflect the interpreted variability of the underlying grade continuity. A minimum and maximum
number of samples was set to limit over-smoothing. A minimum of 1 sample was required for estimation and maximum of 40 samples. The search
quadrant sector was also applied with a maximum of 10 samples per sector. The search ellipsoid ranges were based on AgEq continuity of
grades and drill grid spacing.
Search orientations for Upper Silver
Zone and Middle Zinc Zone were based on the shape of the ABC (andesitic basalt) contact surface. The grade interpolation strategy and
parameters are presented in Table 14-5.
Table 14-5 Carangas Grade
Estimation Search Parameters
General |
Value clipping |
Ellipsoid Ranges |
Ellipsoid Directions |
Domain |
Numeric Values |
Upper bound |
Maximum |
Intermediate |
Minimum |
Dip |
Dip Azimuth |
Pitch |
Variable Orientation |
Upper Silver Zone |
Ag_ppm |
7000 |
175 |
175 |
75 |
|
|
|
Yes |
Upper Silver Zone |
Au_ppm |
40 |
175 |
175 |
75 |
|
|
|
Yes |
Upper Silver Zone |
Cu_pct |
- |
175 |
175 |
75 |
|
|
|
Yes |
Upper Silver Zone |
Pb_pct |
- |
175 |
175 |
75 |
|
|
|
Yes |
Upper Silver Zone |
Zn_pct |
- |
175 |
175 |
75 |
|
|
|
Yes |
Lower Gold Zone |
Ag_ppm |
7000 |
175 |
175 |
75 |
14.216 |
90.9 |
45.0 |
No |
Lower Gold Zone |
Au_ppm |
40 |
175 |
175 |
75 |
14.216 |
90.9 |
45.0 |
No |
Lower Gold Zone |
Cu_pct |
- |
175 |
175 |
75 |
14.216 |
90.9 |
45.0 |
No |
Lower Gold Zone |
Pb_pct |
- |
175 |
175 |
75 |
14.216 |
90.9 |
45.0 |
No |
Lower Gold Zone |
Zn_pct |
- |
175 |
175 |
75 |
14.216 |
90.9 |
45.0 |
No |
Lower Copper Zone |
Ag_ppm |
7000 |
150 |
150 |
50 |
10 |
45.0 |
75.0 |
No |
Lower Copper Zone |
Au_ppm |
40 |
150 |
150 |
50 |
10 |
45.0 |
75.0 |
No |
Lower Copper Zone |
Cu_pct |
- |
150 |
150 |
50 |
10 |
45.0 |
75.0 |
No |
Lower Copper Zone |
Pb_pct |
- |
150 |
150 |
50 |
10 |
45.0 |
75.0 |
No |
Lower Copper Zone |
Zn_pct |
- |
150 |
150 |
50 |
10 |
45.0 |
75.0 |
No |
Middle Zinc Zone |
Ag_ppm |
7000 |
150 |
150 |
50 |
|
|
|
Yes |
Middle Zinc Zone |
Au_ppm |
40 |
150 |
150 |
50 |
|
|
|
Yes |
Middle Zinc Zone |
Cu_pct |
- |
150 |
150 |
50 |
|
|
|
Yes |
Middle Zinc Zone |
Pb_pct |
- |
150 |
150 |
50 |
|
|
|
Yes |
Middle Zinc Zone |
Zn_pct |
- |
150 |
150 |
50 |
|
|
|
Yes |
Source: compiled by RPM GLOBAL, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 89 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
14.5.4
Specific Gravity Interpolation
As
discussed in section 14.1.2 a total of 5,366 specific gravity (SG) measurements from 189 diamond drill holes were used in the
Density estimation for resource block model. RPM determined that the required amount and distribution of SG measurements allowed for
direct estimation of SG within the block model. The inverse distance squared (ID2) method was used and produces a good result comparing
to other methods. The Density interpolation strategy and parameters are presented in Table 14-6.
Table
14-6 Density Estimation Parameters
General |
Ellipsoid
Ranges |
Ellipsoid
Directions |
Domain |
Numeric
Values |
Maximum |
Intermediate |
Minimum |
Dip |
Dip
Azimuth |
Pitch |
Variable
Orientation |
Upper
Silver Zone |
SG |
330 |
195 |
130 |
|
|
|
Yes |
Middle
Zinc Zone |
SG |
330 |
195 |
195 |
|
|
|
Yes |
Lower
Gold Zone |
SG |
330 |
195 |
130 |
0 |
0 |
110 |
No |
Lower
Copper Zone |
SG |
380 |
210 |
210 |
0 |
0 |
110 |
No |
Source:
compiled by RPM GLOBAL, 2023
The
overall results are strongly related to the density database, as expected, and the validation process shows a reasonable comparison as
presented in histograms from samples and block model in Figure 14-4. The samples histogram geometry is reproducible into the estimated
blocks and the mean and standard deviation shows a good comparison.
Figure
14-4 Estimation Density Histogram Validation
Source:
RPM GLOBAL, 2023
14.5.5
Block Model Validation
The
block model validation process included visual comparisons between block estimates and composite grades in section views, local versus
global estimates for ID2 and NN, and swath plots. A three-step process was used to validate the estimation as outlined below:
■ | Mean
grade comparison in each domain; |
■ | Swath
plots comparing estimation methods; and |
■ | Visual
inspection of the blocks against drill hole composites. |
A
quantitative assessment of the estimate was completed by comparing the average grades of the top-cut composite file against the block
model grades for each domain. The results of main element for each domain are tabulated in Table 14-7 and indicate a good correlation.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 90 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Table
14-7 Composite vs. Block Model Grade Statistical Validation
DOMAIN |
GRADE |
Sample
Grade |
Model
Grade |
Difference
in Grade |
Difference
(%) |
Upper
Silver Zone |
Ag
(g/t) |
42.39 |
41.20 |
1.19 |
3% |
Lower
Gold Zone |
Au
(g/t) |
0.77 |
0.75 |
0.02 |
3% |
Middle
Zinc Zone |
Pb
(%) |
0.29 |
0.30 |
-0.01 |
-3% |
Middle
Zinc Zone |
Zn
(%) |
0.67 |
0.72 |
-0.05 |
-7% |
Lower
Copper Zone |
Cu
(%) |
0.30 |
0.31 |
-0.01 |
-3% |
Source:
compiled by RPM GLOBAL, 2023
A
volumetric verification was undertaken to confirm that the block model represents the mineralization wireframe volumes, and no major
discrepency was detected. This comparison is presented in Table 14-8, indicating an excellent comparison for all mineralization
veins.
Table
14-8 3D Volumetric Model comparison
DOMAIN |
Wireframe
Volume (m3) |
Model
Volume (m3) |
Difference
(m3) |
Difference
(%) |
Upper
Silver Zone |
80,734,000 |
80,760,500 |
-26,500 |
0.0% |
Lower
Gold Zone |
52,072,000 |
52,063,625 |
8,375 |
0.0% |
Middle
Zinc Zone |
37,254,000 |
37,242,125 |
11,875 |
0.0% |
Lower
Copper Zone |
547,590 |
546,500 |
1,090 |
0.2% |
TOTAL |
170,607,590 |
170,612,750 |
-5,160 |
0.0% |
Source:
compiled by RPM GLOBAL, 2023
Swath
plots were developed to compare interpolated block grades with the sample composite data along distance slices in the X, Y and Z directions.
The swath plot analysis, shown in Figure 14-5, shows that the estimated grades had a reasonable correlation with the cut composite
grades. While the swath plots preserve the overall trend between the composite and block model grades, there is variation in the composites
on individual slices. This often results from the smoothing of block grades that is inherent in the Inverse Distance algorithm and the
estimation parameters used. It is particularly notable when variations in grade occur over short distances or the search ellipse used
for sample selection is significantly wider than the width of the swath plot slice.
The
validation of the interpolated block model was assessed by using visual assessments and validation plots of block grades versus capped
assay grades and composites. The review demonstrated a good comparison between local block estimates and nearby assays, without excessive
smoothing in the block model.
Figure
14-6 and Figure 14-7 provides the visual comparisons for Ag grade of the Carangas Deposit. Visual comparisons for all elements
were developed and the results are acceptable, and the block model grade fits the composite samples and its grade continuity. Overall,
the visual comparison indicated that the model grades were reasonably consistent with the drill hole composite grades both at a local
scale down dip and in areas of closer-spaced drilling grade continuity major direction. A reasonable degree of smoothing was observed
due to a combination of the block dimensions, the ID2 algorithm and the wide drill spacing at some locations.
Based
on the results of the validation, RPM considers the estimate to be a reasonable representation of the composites and matches the known
controls of mineralization and the underlying data.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 91 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure
14-5 Swath Plot along X,Y,Z Direction for Ag (g/t) Validation
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 92 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure
14-6 Ag (g/t) grade Section View Validation of Block Model – Section 22
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 93 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Figure
14-7 Ag (g/t) grade Section View Validation of Block Model – Section DCAr0094
14.5.6
Resource Classification
Mineral
Resources were classified in accordance with CIM Best Practice Guidelines. The Mineral Resource was classified as Indicated and Inferred
Mineral Resource on the basis of data quality, sample spacing, mineralisation and grade continuity.
As
noted in the geology interpretation, the mineralisation varies throughout the deposit, resulting in geological and grade continuity variations.
The mineralisation domains are controlled by silver, gold and zinc grade relations where silver grade is concentrated into the upper
zone, and gold into the lower portions. While there are grade variations observed within the closer spaced drillholes (70m by 70m) the
deposit shows good continuity of the main mineralized zones along strike. While there is good geological continuity along strike, local
variation of grade and thickness occurs between the current drill spacing, which arises from structures and results in discontinuity
of mineralization.
Given
the likelihood of further local grade variation with further drilling, RPM considers the current data suitable to provide a good estimate
of tonnage and metal content on a global scale, and considers the 70m by 70m spacing suitable for an Indicated classification. RPM considers
that further drilling is required to allow for better estimates of local grade and metal distribution and as such no measured resources
are reported.
The
classification criteria used by RPM for the Mineral Resource was as follows:
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 94 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Indicated:
■ | Average
ID2 sample distance of less than 70 m or Nearest Neighbor (NN) sample distance
of less than 35 m; |
■ | Drill
grid spacing of approximately 50-100 m ; and |
■ | Confirmed
visualization of mineralization continuity. |
Inferred:
■ | Blocks
that do not satisfy the requirements for Indicated Resources and had an average sample distance
less than 220 m, were classified as Inferred Resources. |
A
block model view of the Mineral Resource classification is shown in Figure 14-8.
Figure
14-8 Classified Mineral Resources Block Model – Section 22
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 95 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
14.5.7
Reasonable Prospects for Eventual Economic Extraction (RPEEE)
Reasonable
prospects assumptions include:
■ | The
Independent and Qualified Person responsible for the Mineral Resource Estimate is Anderson
Candido, Principal Geologist, of RPMGlobal, and Fellow AusIMM member, and the effective date
of the estimate is August 25, 2023. |
■ | CIM
Definition Standards on Mineral Resources and Reserves were used for the Carangas Project
Mineral Resource Estimate. |
■ | Industry
5 years long-term consensus average prices of metals as of August 2023, were used for all
calculations as itemized in Table 14-9. |
■ | Mineral
Resources are not Mineral Reserves and do not have demonstrated economic viability. |
■ | Minor
variations may occur during the addition of rounded numbers. |
■ | The
pit shell (June 2023) was generated based on the assumptions listed in Table 14-9. These
assumptions were based on regional benchmarks and preliminary metallurgical data. |
■ | There
are no other factors of environmental, permitting, legal, marketing, or other relevant issues
which could materially affect the Mineral Resource estimate. |
Table
14-9 Commodity Prices Used in the Resource Calculation
Commodity |
Unit |
Value
Assumption |
Metal
Prices |
Silver
(Ag) |
US$/oz |
23.00 |
Gold
(Au) |
US$/oz |
1,900.00 |
Lead
(Pb) |
US$/lb |
0.95 |
Zinc
(Zn) |
US$/lb |
1.25 |
Copper
(Cu) |
US$/lb |
4.00 |
Source: compiled by RPM GLOBAL, 2023
Input
Parameters for Resource Calculation
The
Cutoff Grade calculation was based on assumptions as follows: mining operating cost, onsite milling operating cost, tailings management
facility operating cost, G&A cost, royalty cost, selling cost, onsite milling metal recoveries percentages, metal payable percentages,
and other variables.
The
cost assumptions are presented below:
■ | Mining
operating cost: 2.00 US$/t |
■ | Onsite
process operating cost: 10.50 US$/t |
■ | Tailings
management facility operating cost: 0.65 US$/t |
■ | Selling
cost: 0.5 US$/oz AgEq |
■ | Metal
processing recoveries percentages: Ag 90%, Au 98%, Pb 83% and Zn 58% |
■ | Metal
payable percentages: Ag 83%, Au 99.5%, Pb 83% and Zn 45% |
For
resource cutoff calculation purposes, a mining recovery of 100.0% and 0.0% mining dilution were applied.
RPM
has developed an independent maximum pit study to verify the accuracy and reproducibility of the current maximum pit provided by the
Company. The QP is of the opinion that the current maximum pit calculation is reasonable to constrain the Mineral Resources.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 96 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Pit
Optimisation Disclaimer
RPM
highlights that the pit shell used to define the depth and extent to report the open pit Mineral Resource is preliminary. The pit shell
constraint may be subject to minor change after further pit optimization study in future stage of the Project.
RPM
notes that the pit shell constrained Mineral Resources demonstrates reasonable prospects for eventual economic extraction and highlights
that the pit does not constitute a scoping study or a detailed mining study which is required to be completed to confirm the economic
viability of the Project with additional drilling and metallurgy test work. It is further noted that CAPEX is not included in the mining
costs assumed. RPM has verified the utilized operating costs which are based on the Company’s databases and the processing recoveries
based on the preliminary test work as outlined in Section 13, along with the price noted above in determining the appropriate cut-off
grade. In conclusion, RPM considers the open pit constrained Mineral Resources demonstrate reasonable prospects for eventual economic
extraction, however, highlights that additional studies and drilling are required to confirm economic viability.
14.5.8
Mineral Resource Statement
RPM
has independently estimated the Mineral Resources of the Project, based on the data collected by NPM. The Mineral Resource Estimate and
the underlying data comply with the guidelines provided in the CIM Definition Standards under NI 43-101. Therefore, RPM believes it is
suitable for public reporting. The Mineral Resources were completed by Anderson Candido, Principal Geologist, of RPMGlobal, and Fellow
AusIMM member.
The
Statement of Mineral Resources”has ‘een constrained by the topography and maximum optimized pit shell and reported using
a 40 g/t AgEq cut-off grade. This cut-off value was calculated using the metal prices as presented in Table 14-9, and the cost
assumptions shown above.
Results
of the independent Mineral Resources Estimate for the Project are tabulated in the Statement of Mineral Resources within the three main
zones as follow: Upper Silver Zone, Middle Zinc Zone and Lower Gold Zone shown in Table 14-10 below.
Table
14-10 Statement of Mineral Resources* at the Carangas Project as of 25th August 2023
Domain |
Category |
Tonnage |
AgEq |
Ag |
Au |
Pb |
Zn |
Cu |
Mt |
g/t |
Mozs |
g/t |
Mozs |
g/t |
Kozs |
% |
Mlbs |
% |
Mlbs |
% |
Mlbs |
Upper
Silver
Zone |
Indicated |
119.18 |
85.3 |
326.8 |
44.7 |
171.2 |
0.1 |
216.4 |
0.3 |
916.6 |
0.7 |
1,729.6 |
0.01 |
34.5 |
Inferred |
31.30 |
80.3 |
80.8 |
43.0 |
43.3 |
0.1 |
104.6 |
0.3 |
202.4 |
0.5 |
350.0 |
0.01 |
8.9 |
Middle
Zinc
Zone |
Indicated |
43.42 |
56.0 |
78.1 |
10.8 |
15.0 |
0.1 |
77.4 |
0.4 |
343.6 |
0.8 |
739.4 |
0.01 |
13.7 |
Inferred |
9.32 |
54.2 |
16.2 |
8.8 |
2.6 |
0.1 |
15.6 |
0.4 |
74.1 |
0.8 |
162.3 |
0.01 |
2.5 |
Lower
Gold
Zone |
Indicated |
52.28 |
92.1 |
154.9 |
11.4 |
19.1 |
0.8 |
1,294.4 |
0.2 |
184.7 |
0.2 |
184.7 |
0.06 |
64.4 |
Inferred |
4.37 |
91.1 |
12.8 |
12.6 |
1.8 |
0.7 |
97.5 |
0.2 |
21.4 |
0.2 |
21.4 |
0.06 |
5.4 |
Source:
compiled by RPM GLOBAL, 2023
*
Notes:
|
1. |
CIM Definition Standards (2014) were used for reporting the Mineral Resources. |
|
2. |
The Qualified Person (as defined in NI 43-101) for the purposes of the MRE is Anderson Candido, FAusIMM, Principal Geologist with RPM (the “QP”).. |
|
3. |
Mineral Resources are constrained by an optimized pit shell at a metal price of US$23.00/oz Ag, US$1,900.00/oz Au, US$0.95/lb Pb, US$1.25/lb Zn, US$4.00/lb Cu, recovery of 90% Ag, 98% Au, 83% Pb, 58% Zn and Cut-off grade of 40 g/t AgEq and reported as per Section 14. |
|
4. |
Mineral Resources are reported inside the claim boundary. |
|
5. |
Drilling results up to June 1, 2023. |
|
6. |
The numbers may not compute exactly due to rounding. |
|
7. |
Mineral Resources are reported on a dry in-situ basis. |
|
8. |
Mineral resources are not Mineral Reserves and have not demonstrated economic viability. |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 97 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
14.5.9
Recommendations
RPM
highlights that the global Mineral Resources are not Mineral Reserves and have not demonstrated economic viability. They are suitable
only for preliminary economic assessment study and can be used to guide further exploration planning. As a result, RPM recommends that
further infill drilling be required to improve the confidence of the Mineral Resources for future advanced studies.
Additionally,
RPM recommends completing a Preliminary Economic Assessment (PEA) of the Carangas Project incorporating both the Indicated and the Inferred
Mineral Resources, the results of metallurgical test, and preliminary mine planning to generate a discounted cash flow model of the Project.
Below
the conceptual pit constraint exists gold-dominated mineralized material of similar size and grade to the reported Mineral Resources
of the Au Domain within the conceptual pit. This mineralized material has the potential to be converted to Mineral Resource for underground
mining after further studies in the Preliminary Economic Assessment study stage. Gold mineralization remains open to the north and northeast
at depth.
Based
on the outcomes of the Mineral Resources estimate, RPM recommends additional drilling be undertaken. There is good potential to expand
the Mineral Resource base and increase confidence in the Mineral Resource, which is required to make informed investment decisions.
14.5.10
Other Information
RPM
is not aware of any other factors, including environmental, permitting, legal, title, taxation, socio- economic, marketing and political
or other relevant factors, which could materially affect the Mineral Resource.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 98 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
15.
MINERAL RESERVE ESTIMATE
This
section is not applicable as the Project has no known Mineral Reserves.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 99 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
16.
MINING METHODS
This section is not applicable.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 100 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
17.
RECOVERY METHODS
This section is not applicable.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 101 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
18.
PROJECT INFRASTRUCTURE
This section is not applicable.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 102 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
19.
MARKET STUDIES AND CONTRACTS
This section is not applicable.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 103 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
20.
ENVIRONMENTAL STUDIES, PERMITTING, AND SOCIAL/COMMUNITY IMPACT
This section is not applicable.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 104 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
21.
CAPITAL AND OPERATING COSTS
This section is not applicable.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 105 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
22.
ECONOMIC ANALYSIS
This section is not applicable.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 106 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
23.
ADJACENT PROPERTIES
There are no other mineral properties adjacent to the Project.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 107 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
24.
OTHER RELEVANT DATA AND INFORMATION
No additional information or explanation is necessary
to make this Technical Report understandable and not misleading.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 108 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
25.
Interpretation and Conclusions
Carangas is a large silver-gold-lead-zinc
polymetallic deposit hosted in caldera-diatreme volcanic complex of Tertiary age in the South American Epithermal-Porphyry Belt. Controlled
by the temperature and pressure of the underlying hydrothermal system, mineralization is zoned into sperate zones: a near-surface Upper
Silver Zone dominated by silver plus moderate amount of lead and zinc, a Middle Zinc Zone dominated by zinc plus minor amount of silver
and lead, and a Lower Gold Zone dominated by gold plus small amount of silver, copper and zinc. Gold mineralization remains open to north
and northeast directions at depth. Beyond the drilled area, there are multiple IP chargeability anomalies with similar geophysical signature
to that of the known mineralization. These anomalies constitute targets for future drilling to assess if there is additional material
suitable for consideration in Mineral Resources.
New Pacific has established a series
of working procedures and protocols regarding core logging, sampling, core quality assurance/quality control (QAQC) and data validation
which includes insertion of standards, duplicates, blanks and umpire check samples, with which the QP is satisfied. In the opinion of
the QP, the data acquisition, analysis and validation comply with the industry best practices and are appropriate for Mineral Resource
estimate and technical reporting and there are no other known significant risks and uncertainties that could reasonably be expected to
affect the reliability or confidence in the exploration information and Mineral Resource estimate.
A preliminary metallurgy test program
has been completed by two well recognized laboratories in Canada. The test program includes five distinctively different composite samples
taken from core sample rejects and comprises cyanide leach and flotation. The QP is satisfied with the testing procedures and the interpretations
of the test results. The testwork has identified the critical processing procedures for different types of minerals and provided vital
information on the selection of proper processing flowsheets to maximize economic values of the mineral resources.
Under the assumptions presented
in this Technical Report, and based on the data available as of June 1, 2023, RPM estimated the Mineral Resources of the Project which
meet the 2014 CIM Definition Standards, the 2019 CIM Best Practice Guidelines, NI 43-101 guidelines and show reasonable prospects of eventual
economic extraction.
Previous work at the Carangas Project
demonstrated potential to expand the Mineral Resources, and hence continuing exploration is warranted.
The existing Mineral Resources warrant
conducting further studies to assess the potential project economics.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 109 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
26.
RECOMMENDATIONS
26.1
Drilling
Based
on the outcomes of the Mineral Resource estimate and the current stage of the Project, RPM recommends additional drilling be undertaken.
■ | Infill
drilling: the existing drilling grid is largely 50 m by 50 m in majority of the drilled area
and supported the Indicated Mineral Resources category. An appropriate amount of infill drilling
is needed in the core area of the known mineralization system to further confirm the continuity
of mineralization, hence enhance the confidence in the Mineral Resources to facilitate future
advanced technical and economic studies of the Project. |
■ | Step-out
drilling: gold mineralization continues below the conceptual pit constraint and remains open
to the north and northeast directions. Therefore, step-out drilling is justified to unveil
the potential of additional Mineral Resources. |
■ | Exploration
drilling: multiple strong IP chargeability anomalies were identified beyond the drilled areas.
These anomalies displayed geophysical signature similar to that of the known mineralization
system. It is reasonable to anticipate that these anomalies may host mineralization similar
to the one drilled so far and hope for addition of Mineral Resources through new drilling
campaigns in the future. |
26.2
Geology Study, Mapping and Prospecting
■ | Maintain
the partnership with the universities in Bolivia to continue geological studies on the Carangas
deposit to further understand the mineralization styles and genesis, and support future exploration
targeting. |
■ | Initiate
exploration programs of geological mapping and prospecting over the IP chargeability anomalies
for refining targets of drilling test. |
26.3
Processing and Metallurgy Tests
■ | RPM
recommends running comminution testworks, including Bond low-energy impact work index, SMC
Test®, Bond rod mill work index, Bond ball mill work index and abrasion index. |
■ | Variability
mineralized samples from different mineralization and oxidation extent in every mineralized
zone need to be tested further for flotation and cyanide leach. Column leach for the low-grade
gold mineralization. |
■ | Conduct
a comprehensive mineralogical investigation, mainly focused on zinc mineralization. |
■ | Investigate
the amenability of the gold mineralization to gravity concentration. |
■ | Gravity
concentration for gold mineralization |
■ | Run
additional cyanide leach tests for gold mineralization. |
■ | Additional
cyanide leach tests of silver/lead concentrate. |
■ | Run
thickening and filtration tests for flotation tailings. |
■ | Environmental
testing for the process tailings and mine waste rocks. |
■ | Concentrate
marketing study to understand the likely concentrate characteristics from each zone, payables,
penalties, treatment/refining charges, and other applicable parameters for Carangas Project
likely products. |
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 110 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
26.4
Underground Mining Study
The
Mineral Resources of this Technical Report are reported within a conceptual open pit shell. Below the conceptual pit constraint exists
gold-dominated mineralized material of similar size and grade to the reported Mineral Resources of the Au Domain within the conceptual
pit. This mineralized material has the potential to be converted to Mineral Resources for underground mining and needs to be investigated
through relevant studies.
26.5
Techncial and Economic Studies
RPM
recommends a Preliminary Economic Assessment (PEA) study of the Carangas Project that incorporates the known Mineral Resources, metallurgical
test work, mine planning and a discounted cash flow model to develop a project net asset value (“NAV”) and internal rate
of return (“IRR”).
26.6
Estimated Budget for Recommendations
The
estimated budget to complete the main activities recommended above is USD 3,500,000, as outlined in Table 26-1.
Table
26-1 Estimated Budget for Recommendations
Area |
Estimated
Budget |
Geology
and Mineral Resources |
|
Drilling
12,000 m |
USD2,400,000 |
Geology
Study |
USD100,000 |
Geological
Mapping and Prospecting |
USD200,000 |
Sub-total
– Geology and Mineral Resources |
USD
2,700,000 |
Mining
Study |
USD400,000 |
PEA
Study |
Sub-total
– Mining |
USD
400,000 |
Mineral
Processing and Metallurgy Tests |
|
Comminution
tests |
Flotation
and cyanide leach analysis |
Column
leach development |
Mineralogical
investigation |
Gravity
concentration studies |
Thickening
and filtration for flotation tailings |
Environmental
testing for the process tailings and mine waste rocks |
Concentrate
marketing study |
Sub-total
– Mineral Processing |
USD
400,000 |
|
|
Total
Estimated Cost – Next Phase of Study |
USD
3,500,000 |
Source: compiled by RPM GLOBAL, 2023
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 111 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
27.
References
Arce
Geophysicists, 2022, Carangas project geophysical survey: ground magnetometry, report for Minera Granville, pages: 10.
Arce
Burgoa, 2009, Metalliferous ore deposits of Bolivia, second edition, pages: 369.
Lopez
Montaño, 2019, Carangas and Negrillos prospects (Ag, Pb, Zn), Carangas District, Oruro, Western Bolivia: Geologic features and
potential, internal report to New Pacific Minerales S.A., pages: 10.
USGS,
1991, Mineral deposits and occurrences of the Bolivian Altiplano and Cordillera Occidental, pages: 328.
SERGEOMIN,
2002, The Prospective Areas of Bolivia for Metalliferous Deposits, pages: 171.
Jiménez
N., Galván L. and Palomino L., 2000, Geology of the Carangas Volcanic Region: A review from new field data. 14° Bolivian Geological
Congress, pages: 284-288.
Rivas
Salomon, 1979, Geology of the principal tin deposits of Bolivia, Geology of tin deposits: Geological Society of Malaysia Bulletin 11,
pages: 161-180.
Ludington
Steve, Orris Greta, Cox D., Long Keith and Asher Sigrid, 1992, Geology and mineral resources of the Altiplano and Cordillera Occidental,
Bolivia: mineral deposit models, pages: 63-89.
Jiménez
N., Lopez Shirley and Santiváñez Reynaldo, 2009, The Tectonomagmatic Evolution of the Bolivian Andes. Journal of the Geological
Association of Argentina, pages: 36-67.
Einaudi
M., Hedenquist Jeffrey and Inan Esra, 2003, Sulfidation State of Fluids in Active and Extinct Hydrothermal Systems: Transitions from
Porphyry to Epithermal Environments, pages: 50.
White
N., Leake M., McCaughey S., Parris B., 1995, Epithermal gold deposits of the southwest Pacific, Journal of Geochemical Exploration, pages:87-136.
National
Load Dispatch Committee, 2023, The effective capacity of Bolivia’s power plants. https://www.cndc.bo/agentes/generacion.php
Bolivian
Chamber of Electricity, 2019, The Oruro Photovoltaic Solar Plant.
https://cbe.com.bo/noticia/planta-solar-de-oruro-generara-100-mw-desde-marzo-de-
2020#:~:text=Seg%C3%BAn%20datos%20oficiales%2C%20la%20Planta,Central%20de%20Bolivia%20( BCB).
USGS,
1991, Mineral deposits and occurrences of the Bolivian altiplano and cordillera occidental, PAGES:
355.
https://pubs.usgs.gov/of/1991/0286/report.pdf
USGS-Servicio
Geológico de Bolivia, 1975, Geology and Mineral Resources of the Altiplano and CordilleraOccidental, Bolivia, pages: 365.
Ponce,
J; & Avila-Salinas, W. 1964. Cuadrángulo de Carangas a escala 1:100.000-Carta Geológica Nacional de Bolivia.
|
| ADV-TO-00079 | Carangas Silver- Gold Project – Department of Oruro, Bolivia – NI 43-101 Mineral Resource Estimate Technical Report | August 2023| |
| | Page 112 of 112 | |
This report has been prepared for New Pacific Metals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in Appendix B of the report. © RPM Global Limited 2023 |
Ag
3D Domain – Capping Analysis
Source:
compiled by RPM GLOBAL, 2023
Au
3D Domain – Capping Analysis
Source:
compiled by RPM GLOBAL, 2023
PbZn
3D Domain – Capping Analysis
Source:
compiled by RPM GLOBAL, 2023
Source:
compiled by RPM GLOBAL, 2023
Source: compiled by RPM GLOBAL, 2023
1. Our Client
This
report has been produced by or on behalf of RPM Global Limited (“RPM”) solely for New Pacific Metals Corp. (the “Client”).
2. Client Use
The
Client’s use and disclosure of this report is subject to the terms and conditions of the engaging Agreement under which RPM prepared
the report.
3. Notice to Third Parties
RPM
prepared this report for the Client only. If you are not the Client:
| ■ | RPM
has prepared this report having regard to the particular needs and interests of the Client,
and in accordance with the Client’s instructions and in accordance with the terms and
conditions of its engagement. It did not draft this report having regard to any other person’s
particular needs or interests. Your needs and interests may be distinctly different to the
Client’s needs and interests, and the report may not be sufficient, fit or appropriate
for your purposes. |
| ■ | Other
than as expressly agreed by RPM in writing, RPM does not authorise, nor does it accept any
liability to any party other than the Client who chooses to rely on this Report. Any such
reliance is at the user’s sole and exclusive risk. |
| ■ | RPM
does not make and expressly disclaims from making any representation or warranty to you –
express or implied – regarding this report or the conclusions or opinions set out in
this report (including without limitation any representation or warranty regarding the standard
of care used in preparing this report, or that any forward-looking statements, forecasts,
opinions or projections contained in the report will be achieved, will prove to be correct
or are based on reasonable assumptions). |
| ■ | RPM
expressly disclaims any liability to you and any duty of care to you. |
| ■ | RPM
does not authorise you to rely on this report. If you choose to use or rely on all or part
of this report, then any loss or damage you may suffer in so doing is at your sole and exclusive
risk. |
4. Independence
RPM
provides advisory services to the mining and finance sectors. Within its core expertise it provides independent technical reviews, resource
evaluation, mining engineering, environmental assessments and mine valuation services to the resources and financial services industries.
RPM
have independently assessed the subject of the report (the “Project”) by reviewing pertinent data, which may include Resources,
Reserves, existing approvals, licences and permits, manpower requirements and the life of mine plans relating to productivity, production,
operating costs and capital expenditures. All opinions, findings and conclusions expressed in this report are those of RPM and specialist
advisors.
Drafts
of this report were provided to the Client, but only for the purpose of confirming the accuracy of factual material and the reasonableness
of assumptions relied upon in this report.
RPM
has been paid, and has agreed to be paid, professional fees for the preparation of this report. The remuneration for this report is not
dependent upon the findings of this report. RPM does not have any economic or beneficial interest (present or contingent), in the Project,
in securities of the companies associated with the Project or the Client
5. Inputs, subsequent changes and no duty to update
RPM
has created this report using data and information provided by or on behalf of the Client. Unless specifically stated otherwise, RPM
has not independently verified that data and information. RPM accepts no liability for the accuracy or completeness of that data and
information, even if that data and information has been incorporated into or relied upon in creating this report (or parts of it).
The
conclusions and opinions contained in this report apply as at the date of the report. Events (including changes to any of the data and
information that RPM used in preparing the report) may have occurred since that date which may impact on those conclusions and opinions
and make them unreliable. RPM is under no duty to update the report upon the occurrence of any such event, though it reserves the right
to do so.
6. Inherent Mining Risks
Mining
is carried out in an environment where not all events are predictable.
Whilst
an effective management team can identify the known risks and take measures to manage and mitigate those risks, there is still the possibility
for unexpected and unpredictable events to occur. It is not possible therefore to totally remove all risks or state with certainty that
an event that may have a material impact on the operation of a mine, will not occur.
The
ability of any person to achieve forward-looking production and economic targets is dependent on numerous factors that are beyond RPM’s
control and that RPM cannot anticipate. These factors include, but are not limited to, site-specific mining and geological conditions,
management and personnel capabilities, availability of funding to properly operate and capitalize the operation, variations in cost elements
and market conditions, developing and operating the mine in an efficient manner, unforeseen changes in legislation and new industry developments.
Any of these factors may substantially alter the performance of any mining operation.
7. Limitations and Exclusions
RPM’s
report is based on data, information reports, plans and tabulations, as applicable, provided by Client or on behalf of the Client. The
Client has not advised RPM of any material change, or event likely to cause material change, to the operations or forecasts since the
date of assets inspections.
The
work undertaken for this report is that required for a technical review of the information, coupled with such inspections as RPM considered
appropriate to prepare this report.
Unless
otherwise stated specifically in writing, the report specifically excludes all aspects of legal issues, commercial and financing matters,
land titles and agreements, except such aspects as may directly influence technical, operational or cost issues and where applicable
to the JORC Code guidelines.
RPM
has specifically excluded making any comments on the competitive position of the relevant assets compared with other similar and competing
producers around the world. RPM strongly advises that any potential investors make their own comprehensive assessment of the competitive
position of the relevant assets in the market.
8. Indemnification
The
Client has indemnified and held harmless RPM and its subcontractors, consultants, agents, officers, directors and employees from and
against any and all claims, liabilities, damages, losses and expenses (including lawyers’ fees and other costs of litigation, arbitration
or mediation) arising out of or in any way related to:
● | RPM’s
reliance on any information provided by Client; or |
● | RPM’s
services or materials; or |
● | Any
use of or reliance on these services or materials by any third party not expressly authorised by RPM, save and except in cases of death
or personnel injury, property damage, claims by third parties for breach of intellectual property rights, gross negligence, wilful misconduct,
fraud, fraudulent misrepresentation or the tort of deceit, or any other matter which be so limited or excluded as a matter of applicable
law (including as a Competent Person under the Listing Rules) and regardless of any breach of contract or strict liability by RPM. |
-
END OF REPORT -
www.rpmglobal.com
AUSTRALIA
| BRAZIL | CANADA | CHILE | CHINA | HONG KONG | INDIA | INDONESIA
MONGOLIA
| RUSSIA | SOUTH AFRICA | TURKEY | USA
Exhibit 99.2
CONSENT OF QUALIFIED PERSON
|
|
TO: |
New Pacific Metals Corp. |
|
|
TO: |
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba Securities Commission
Ontario Securities Commission
Autorité des marchés financiers (Quebec)
Financial and Consumer Services Commission, New Brunswick
Nova Scotia Securities Commission
Financial and Consumer Services, Department of Justice and Public Safety, Prince Edward Island
Office of the Superintendent of Securities Service Newfoundland and Labrador |
|
|
AND TO: |
Toronto Stock Exchange |
Dear Sirs/Medames:
|
|
RE: |
New Pacific Metals Corp (the “Company”) - Consent of Qualified Person |
Reference is made to the technical report titled “Carangas Silver- Gold Project - Department of Oruro, Bolivia - NI 43-101 Mineral Resource Estimate Technical Report” (effective date August 25, 2023)(the “Report”).
I, Anderson Goncalves Candido, FAusIMM, hereby consent to the public filing of the Report.
Dated this 18th of September, 2023.
“Anderson Goncalves Candido”
Signature Qualified Person
Anderson Goncalves Candido
Print Name of Qualified Person
Exhibit 99.2
CONSENT OF QUALIFIED PERSON
|
|
TO: |
New Pacific Metals Corp. |
|
|
TO: |
British Columbia Securities Commission
Alberta Securities Commission
Financial and Consumer Affairs Authority of Saskatchewan
The Manitoba Securities Commission
Ontario Securities Commission
Autorité des marchés financiers (Quebec)
Financial and Consumer Services Commission, New Brunswick
Nova Scotia Securities Commission
Financial and Consumer Services, Department of Justice and Public Safety, Prince Edward Island
Office of the Superintendent of Securities Service Newfoundland and Labrador |
|
|
AND TO: |
Toronto Stock Exchange |
Dear Sirs/Medames:
|
|
RE: |
New Pacific Metals Corp (the “Company”) - Consent of Qualified Person |
Reference is made to the technical report titled “Carangas Silver- Gold Project - Department of Oruro, Bolivia - NI 43-101 Mineral Resource Estimate Technical Report” (effective date August 25, 2023)(the “Report”).
I, Marcelo del Giudice, FAusIMM, hereby consent to the public filing of the Report.
Dated this 18th of September, 2023.
“Marcelo del Giudice”
Signature Qualified Person
Marcelo del Giudice
Print Name of Qualified Person
Exhibit 99.4
Anderson Goncalves Candido
RPM Global
8° floor,330 St Antonio de Albuquerque
Belo Horizonte, MG - Brazil
Phone: +55 31 99969 1205
agcandido@rpmglobal.com
I, Anderson Goncalves Candido, am working as a Principal Resource Geologist for RPM Global, of 8° floor,330 St Antonio de Albuquerque, Belo Horizonte, MG - Brazil. This certificate applies to the NI 43-101 Mineral Resources Technical Report on the Carangas Gold-Silver Project, Bolivia, prepared for New Pacific Metals Corp., dated effective as of 25 August 2023 (the “Technical Report”), do hereby certify that:
1. I am a Fellow Member of the Australasian Institute of Mining and Metallurgy (“FAusIMM”).
2. I am a professional geologist having graduated with an undergraduate degree of Bachelor of Science (Geology Engineer) from the Ouro Preto Federal University in 2003.
3. I have worked as a geologist for a period in excess of 19 years since my graduation from university. I have been continuously and actively engaged in the geology discipline on assessment, development, and operation of mineral Projects.
4. I am a Qualified Person for the purposes of the National Instrument 43-101 of the Canadian Securities Administrators (“NI 43-101”).
5. I visited the Carangas Gold-Silver Project site from March 27 to 30, 2023 to verify and have a good geology understanding and project perspectives.
6. I approved the preparation and compilation of the Technical Report.
7. I have had no prior involvement with the properties that are the subject of the Technical Report.
8. To the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading as of the effective date of the report, 25 August 2023.
9. I am independent of New Pacific Metals Corp. in accordance with the application of Section 1.5 of NI 43-101.
10. I have read NI 43-101 and Form 43-101F1 and the Technical Report has been prepared in compliance with that instrument and form.
11. I consent to the filing of the Technical Report with any stock exchange or any other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their website and accessible by the public, of the Technical Report.
Dated at Brazil, 25 August 2023
“Anderson Goncalves Candido”
“Anderson Goncalves Candido” (QP)
|
|
| ADV-TO-00079 | Carangas Silver- Gold Project - Department of Oruro, Bolivia - NI 43-101 Mineral Resource Estimate Technical Report | August 2023 | |
| Page ii of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in
Appendix B of the report. © RPM Global Limited 2023
Exhibit 99.5
Marcelo del Giudice
RPM Global
8° floor,330 St Antonio de Albuquerque
Belo Horizonte, MG - Brazil
Phone: +55 31 98478 2939
mgiudice@rpmglobal.com
I, Marcelo del Giudice am working as a Principal Metallurgist for RPM Global, of 8° floor,330 St Antonio de Albuquerque, Belo Horizonte, MG - Brazil. This certificate applies to the NI 43-101 Mineral Resources Technical Report on the Carangas Gold-Silver Project, Bolivia, prepared for New Pacific Metals Corp., dated effective as of 25 August 2023 (the “Technical Report”), do hereby certify that:
1. I am a Fellow Member of the Australasian Institute of Mining and Metallurgy (“FAusIMM”).
2. I am a professional metallurgist with an undergraduate degree of Bachelor of Science (Metallurgical Engineering) from the Minas Gerais Federal University in 2009. I obtained a Master of Science degree in Chemical Engineering in 2014 from the University of São Paulo.
3. I have been continuously and actively engaged in the mineral processing, project development, and operation of mineral projects since graduation from university.
4. I am a Qualified Person for the purposes of the National Instrument 43-101 of the Canadian Securities Administrators (“NI 43-101”).
5. I have not visited the Carangas Gold-Silver Project site.
6. I am author of this report and responsible for section 13 and parts of 1 and 26.
7. I have had no prior involvement with the properties that are the subject of the Technical Report.
8. To the best of my knowledge, information and belief, the Technical Report contains all scientific and technical information that is required to be disclosed to make the Technical Report not misleading as of the effective date of the report, 25 August 2023.
9. I am independent of New Pacific Metals Corp. in accordance with the application of Section 1.5 of NI 43-101.
10. I have read NI 43-101 and Form 43-101F1 and the Technical Report has been prepared in compliance with that instrument and form.
11. I consent to the filing of the Technical Report with any stock exchange or any other regulatory authority and any publication by them for regulatory purposes, including electronic publication in the public company files on their website and accessible by the public, of the Technical Report.
Dated at Brazil, 25 August 2023
“Marcelo del Giudice”
“Marcelo del Giudice” (QP)
|
|
| ADV-TO-00079 | Carangas Silver- Gold Project - Department of Oruro, Bolivia - NI 43-101 Mineral Resource Estimate Technical Report | August 2023 | |
| Page iii of vi | |
This report has been prepared for New Pacific Matals Corporation and must be read in its entirety and is subject to all assumptions, limitations and disclaimers contained in
Appendix B of the report. © RPM Global Limited 2023
New Pacific Metals (AMEX:NEWP)
Historical Stock Chart
From Dec 2024 to Jan 2025
New Pacific Metals (AMEX:NEWP)
Historical Stock Chart
From Jan 2024 to Jan 2025